Contractor dossier
243 projects on file, including joint ventures this contractor is part of.
Total projects
243
Total budget
₱7B
Average progress
95.0%
Completion rate
84.0%
Average risk score
48.0
Medium risk on average, out of 100
Flagged as unusual
14
5.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 229 | ₱7B | 48.1 | 14 | 94.7% |
| Region IV-A | 14 | ₱94.1M | 46.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 129 | ₱2.9B | 43.7 | 0 | 96.2% |
| Flood Control and Drainage | 44 | ₱2.6B | 50.1 | 0 | 98.9% |
| Buildings and Facilities | 36 | ₱308.6M | 39.9 | 0 | 100.0% |
| Bridges | 8 | ₱298.3M | 49.5 | 1 | 97.5% |
| GAA 2025 SSP | 6 | ₱116M | 92.8 | 4 | 71.0% |
| OTHER | 6 | ₱282.4M | 77.6 | 3 | 80.6% |
| Water Provision and Storage | 6 | ₱70.3M | 42.0 | 1 | 83.3% |
| GAA 2025 OO-2 | 4 | ₱289.1M | 89.1 | 2 | 91.6% |
| GAA 2025 OO-1 | 4 | ₱177.1M | 88.2 | 3 | 42.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BB0072CSSP - SPECIAL ROAD FUND - MOTOR VEHICLES USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF RD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG JCT. MAGAPIT - CAPISSAYAN RD - K0557+(-234.80) - K0569+621.30, LAL-LO - GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱29.4M | 49% | High risk95 | Flagged0.025 |
| 25BB0071CSSP - SPECIAL ROAD FUND - MOTOR VEHICLES USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF RD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG CVR (MAGAPIT-JCT APARRI SECT) - K0564+096 - K0571+525, LAL-LO - CAMALANIUGAN, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱19.6M | 30% | High risk95 | Flagged0.029 |
| 25B00081OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS MAHARLIKA HIGHWAY (CAGAYAN VALLEY ROAD) - K0541+000 - K0541+533, K0548+000 - K0548+920, K0549+050 - K0549+940, K0550+094 - K0550+605.50 | Region II | Region II | On-Going | ₱138.5M | 14% | High risk94 | Flagged0.036 |
| 25BB0064CSSP- SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ROAD, TANGLAGAN - BOLOS POINT ROAD, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱9.8M | 100% | High risk94 | Flagged0.005 |
| 25BB0084OO2: PROTECT LIVES & PROPERTIES AGAINST MAJ FLDS - FLD MANAG'T PROG - CONST/REHAB OF FLD MITIGATN FACILITIES W/N MAJ RIVER BASINS & PRINCIPAL RIVERS - CONST OF FLD CONTL STRUCTURE ALONG CAGAYAN RIVER PACKAGE 8, BARANGAY AGUIGUICAN, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱93.5M | 79% | High risk93 | Flagged0.003 |
| 25BB0038CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ROAD, PHASE 1, BARANGAY SAN ANTONIO, BAGGAO, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱4.9M | 100% | High risk92 | —-0.021 |
| 25BB0074OO2: PROTECT LIVES PROPERTIES AGAINST MAJ FLDS - FLD MANAGT PROG - CONST/REHAB OF FLD MITIGATN FACILITIES WITHIN MAJ. RIVER BASINS & PRINCIPAL RIVERS - CFMS - CONST. OF FLD CONTRL STRUCTURE ALONG CAG. RIVER, PACKAGE 6, BRGY. AGUIGUICAN, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱96.5M | 96% | High risk92 | Flagged0.000 |
| 25BB0148CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - EVACUATION CENTERS/QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES - CONSTRUCTION OF EVACUATION CENTER, BARANGAY C. VERZOSA, BAGGAO, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱47.5M | 47% | High risk92 | Flagged0.028 |
| 25BB0083OO2: PROTECT LIVES & PROPERTIES AGAINST MAJ FLOODS - FLD MANAG'T PROG - CONST/REHAB OF FLD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS - CONST OF FLD CONTROL STRUCTURE ALONG CAGAYAN RIVER PACKAGE 7, BRGY AGUIGUICAN, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱84.5M | 91% | High risk92 | —-0.003 |
| 25B00092OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - JCT LOGAC -MAGAPIT RD K0705+(-113) - K0705+342.50 | Region II | Region II | On-Going | ₱20M | 100% | High risk91 | —-0.009 |
| 25B00019ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES: NAGANTATAPIAN BR. (B01094LZ) ALONG MAHARLIKA HIGHWAY ( CAGAYAN VALLEY RD) (PHASE II) | Region II | Region II | On-Going | ₱14.4M | 49% | High risk90 | Flagged0.007 |
| 25BB0104CSSP - BIP - ACCESS RDS AND/OR BR. FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES - COC ROAD - CONST OF ROAD GOING TO SMALL WATER IMPOUNDING PROJECT FOR ECOTOURISM, AT BARANGAY DAMMANG NORTE, CAMALANIUGAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱4.8M | 100% | High risk89 | —-0.021 |
| 24BB0097OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF CONCRETE ROAD - ALCALA BYPASS ROAD, ALCALA, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱96.5M | 100% | High risk84 | Flagged0.018 |
| 24B00157DOH - FY 2024 HEALTH CARE FACILITIES ENHANCEMENT PROGRAM (HFEP): LGU HOSPITALS: LGU HOSPITALS - APARRI PROVINCIAL HOSPITAL | Region II | Region II | On-Going | ₱48.3M | 27% | High risk83 | Flagged0.070 |
| 24B00091OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - CAGAYAN VALLEY RD - K0529+809 - K0530+811, K0535+325 - K0535+400 | Region II | Region II | Completed | ₱69.8M | 100% | High risk82 | —-0.020 |
| 25BB0056OO2: PROTECT LIVES & PROPERTIES AGAINST MAJ. FLDS - FLD MANAG'T PROG - CONST/ MAINT. OF FLD MITIGATION STRUCTURES & DRAINAGE SYSTEMS - CONST.OF REVETMENT, BANURBUR CREEK IRRIGATN SYS., STA. 0+000 - STA 0+050, BUGUEY, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱14.7M | 100% | High risk79 | —-0.037 |
| 24BA0030SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES- CONSTRUCTION OF SUMNANGA DIVERSION ROAD, SABTANG, BATANES | Region II | Batanes DEO | On-Going | ₱49M | 57% | High risk79 | Flagged0.022 |
| 25B00115OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - LENGUA BR. (B01087LZ) ALONG MAHARLIKA HIGHWAY (CAGAYAN VALLEY RD) | Region II | Region II | On-Going | ₱4.2M | 8% | High risk78 | Flagged0.016 |
| 24BB0162CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING DIORA ZINUNGAN, STA. ANA, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱4.9M | 100% | High risk69 | —-0.025 |
| 21DF0149LOCAL PROGRAMLOCAL INFRASTRUCTURE PROGRAMBUILDINGS AND OTHER STRUCTURESMULTIPURPOSE/FACILITIESCONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING AT BAYAN LUMA V, IMUS; CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING AT PASONG BUAYA, IMU | Region IV-A | Cavite 1st DEO | Completed | ₱13.9M | 100% | High risk68 | —-0.042 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24B00157DOH - FY 2024 HEALTH CARE FACILITIES ENHANCEMENT PROGRAM (HFEP): LGU HOSPITALS: LGU HOSPITALS - APARRI PROVINCIAL HOSPITAL | Region II | Region II | On-Going | ₱48.3M | 27% | High risk83 | Flagged0.070 |
| 24BB0223CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM BARANGAYS CENTRO SUR AND CENTRO NORTE, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱38.6M | 0% | Medium risk51 | Flagged0.047 |
| 25B00081OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS MAHARLIKA HIGHWAY (CAGAYAN VALLEY ROAD) - K0541+000 - K0541+533, K0548+000 - K0548+920, K0549+050 - K0549+940, K0550+094 - K0550+605.50 | Region II | Region II | On-Going | ₱138.5M | 14% | High risk94 | Flagged0.036 |
| 25BB0071CSSP - SPECIAL ROAD FUND - MOTOR VEHICLES USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF RD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG CVR (MAGAPIT-JCT APARRI SECT) - K0564+096 - K0571+525, LAL-LO - CAMALANIUGAN, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱19.6M | 30% | High risk95 | Flagged0.029 |
| 25BB0148CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - EVACUATION CENTERS/QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES - CONSTRUCTION OF EVACUATION CENTER, BARANGAY C. VERZOSA, BAGGAO, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱47.5M | 47% | High risk92 | Flagged0.028 |
| 25BB0072CSSP - SPECIAL ROAD FUND - MOTOR VEHICLES USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION/APPLICATION OF RD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG JCT. MAGAPIT - CAPISSAYAN RD - K0557+(-234.80) - K0569+621.30, LAL-LO - GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱29.4M | 49% | High risk95 | Flagged0.025 |
| 24BA0030SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES- CONSTRUCTION OF SUMNANGA DIVERSION ROAD, SABTANG, BATANES | Region II | Batanes DEO | On-Going | ₱49M | 57% | High risk79 | Flagged0.022 |
| 24BB0097OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF CONCRETE ROAD - ALCALA BYPASS ROAD, ALCALA, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱96.5M | 100% | High risk84 | Flagged0.018 |
| 25B00115OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - LENGUA BR. (B01087LZ) ALONG MAHARLIKA HIGHWAY (CAGAYAN VALLEY RD) | Region II | Region II | On-Going | ₱4.2M | 8% | High risk78 | Flagged0.016 |
| 25B00019ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES: NAGANTATAPIAN BR. (B01094LZ) ALONG MAHARLIKA HIGHWAY ( CAGAYAN VALLEY RD) (PHASE II) | Region II | Region II | On-Going | ₱14.4M | 49% | High risk90 | Flagged0.007 |
| 25BB0064CSSP- SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ROAD, TANGLAGAN - BOLOS POINT ROAD, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱9.8M | 100% | High risk94 | Flagged0.005 |
| 23B00038OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE - BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - NAGANTATAPIAN BRIDGE (B01094LZ) ALONG CAGAYAN VALLEY ROAD | Region II | Region II | On-Going | ₱119.7M | 98% | High risk66 | Flagged0.003 |
| 25BB0084OO2: PROTECT LIVES & PROPERTIES AGAINST MAJ FLDS - FLD MANAG'T PROG - CONST/REHAB OF FLD MITIGATN FACILITIES W/N MAJ RIVER BASINS & PRINCIPAL RIVERS - CONST OF FLD CONTL STRUCTURE ALONG CAGAYAN RIVER PACKAGE 8, BARANGAY AGUIGUICAN, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱93.5M | 79% | High risk93 | Flagged0.003 |
| 25BB0074OO2: PROTECT LIVES PROPERTIES AGAINST MAJ FLDS - FLD MANAGT PROG - CONST/REHAB OF FLD MITIGATN FACILITIES WITHIN MAJ. RIVER BASINS & PRINCIPAL RIVERS - CFMS - CONST. OF FLD CONTRL STRUCTURE ALONG CAG. RIVER, PACKAGE 6, BRGY. AGUIGUICAN, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱96.5M | 96% | High risk92 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 23BB0044OO1: ENSURE SAFE & RELIABLE NAT'L RD SYSTEM - ASSET PRESERVATN-REHAB./ RECONST. OF NATL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY RDS- CONST. OF RD SLOPE PROTECTN STRUCTURE - CVR, K0552+225 - K0552+340, LAL-LO, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱44.1M | 100% | Medium risk44 | —-0.081 |
| 152 | 22BB0016OO2:PROTECTLIVES&PROPERT'S AGAINST MAJ. FLDS-FLD.MNAGNT PROG.-CONST./REHAB.OF FLD MITIGAT'N FACILIT'S W/N MAJOR RIVER BASINS & PRINCIPAL RVRS -CONST OF FLD MITIGAT'N STRUCTURE- CONST.OF FLD CNTRL STRUCTURE ALONG CAG.RVR, CENTRONORTE SECT.2, GATTARAN, CAG. | Region II | Cagayan 1st DEO | Completed | ₱24.5M | 100% | Medium risk44 | —-0.061 |
| 153 | 22BB0015OO2: PROTECT LIVES&PROPERT'S AGAINST MAJOR FLDS-FLD MNAGEM'T PROG-CONST./REHAB. OF FLD MITIGAT'N FACILITIES W/N MAJ. RVR BASINS & PRINCIPAL RVRS- CONST. OF FLD MITIGATN STRUCTURE-CONST.OF FLD CTRL STRUCTURE ALONG CAG.RVR,CENTRONORTESECTION 1, GATTARAN,CAG | Region II | Cagayan 1st DEO | Completed | ₱24.5M | 100% | Medium risk44 | —-0.061 |
| 154 | 22BB0098CSSP - BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION AT CALAOAGAN DACKEL NHS CAPISSAYAN ANNEX, BARANGAY CAPISSAYAN SUR, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.067 |
| 155 | 25BB0076CSSP - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ROAD, SITIO SOLSONA, BARANGAY DUMMUN, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.081 |
| 156 | 18BB0073ASSET PRESERVATION-REHAB./RECONST. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY RDS CONST. OF ROAD SLOPE PROTECTION STRUCTURE-BAYBAYOG-BAGGAO-DALIN-STA. MARGARITA RD-K0547+000-K0547+110.80, BRGY. CATUGAY,BAGGAO, CAGAYAN (S00663LZ) | Region II | Cagayan 1st DEO | Completed | ₱24.1M | 100% | Medium risk44 | —-0.080 |
| 157 | 22BC0065CSSP-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT)-MALINTA-GABUN BARANGAY ROAD TO JCT. LOGAC-LASAM-GAGABUTAN ROAD CONNECTING TO CACAO PLANTATION AND PROCESSING, MALINTA, LASAM, CAGAYAN | Region II | Cagayan 2nd DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.083 |
| 158 | 24BB0017CSSP - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC-ZONES (ROLL-IT) - CONSTRUCTION OF CONCRETE ROAD - JGCCAMBPR TO CAPISSAYAN NORTE-SIBUGA LEADING TO BANANA PLANTATION, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.082 |
| 159 | 25BB0035CSSP-CONST/ IMPROVT OF ACCESS RDS LEADG TO TRADES, INDUSTRIES & ECONOMIC ZONES (ROLL-IT) - CONSTRUCTION OF CONCRETE ROAD - JGCCSMBPR TO PIÑA WESTE LEADING TO BANANA PLANTATION, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.080 |
| 160 | 24BB0006CSSP - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT)- CONSTRUCTION OF CONCRETE ROAD JGCCSMBPR TO TO PIÑA WESTE LEADING TO BANANA PLANTATION, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.082 |
| 161 | 20BB0023CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS ACCESS ROAD LEADING TO HOTSPRING FALLS AND CAVES, ASINGA -VIA, BRGY. ASINGA- VIA, BAGGAO, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱14.3M | 100% | Medium risk44 | —-0.081 |
| 162 | 25BB0013CSSP - CONST/ IMPROV'T OF ACCESS RDS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT) - CONST. OF CONC. ROAD - JCT. GATTARAN CUMAO CAPISSAYAN STA. MARGARITA BOLOS POINT TO SITIO BATANGAN LEADING TO BANANA PLANTATION, PIÑA ESTE, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.081 |
| 163 | 25BB0037CSSP - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT) - CONSTRUCTION OF CONCRETE ROAD - JGCCSMBPR TO CAPISSAYAN SUR -SIBUGA LEADING TO BANANA PLANTATION, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱9.8M | 100% | Medium risk44 | —-0.081 |
| 164 | 25BB0066CSSP - BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ROAD, BARANGAY SAN VICENTE, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱7.9M | 100% | Medium risk44 | —-0.082 |
| 165 | 23BB0121CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) -ACCESS ROAD AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF CONCRETE ROAD - CONCRETING OF BARANGAY ROAD AT BRGY. TUBUNGAN ESTE, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱7.9M | 100% | Medium risk44 | —-0.082 |
| 166 | 23BB0119CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF BARANGAY ROAD AT BRGY. BARAOIDAN, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱7.9M | 100% | Medium risk44 | —-0.082 |
| 167 | 25BB0062CSSP - BIP - ACCESS ROADS AND/OR BRIDGE FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ROAD, SITIO RISSIK, BARANGAY MABUNO, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱9.9M | 100% | Medium risk44 | —-0.081 |
| 168 | 23BB0118CSSP - BIP - ACCESS ROAD AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDING / FACILITIES - CONSTRUCTION OF CONCRETE ROAD - CONCRETING OF BARANGAY ROAD AT BRGY. CENTRO NORTE TO NAGATUTUAN, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱7.9M | 100% | Medium risk44 | —-0.082 |
| 169 | 23BB0099CSSP - BIP ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF CONCRETE ROAD - CONCRETING OF BARANGAY ROAD AT BRGY. BASAO, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱7.9M | 100% | Medium risk44 | —-0.083 |
| 170 | 25BB0055CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ROAD, BARANGAY NEWAGAC, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.080 |
| 171 | 24BB0042CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ROAD, BARANGAY CABAYU, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.082 |
| 172 | 22BB0089CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF BARANGAY ROAD AT BARANGAY BASAO, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.082 |
| 173 | 25BB0050CSSP - BASIC INFRASTRUCTURE PROG (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ROAD, PHASE 2, BARANGAY SAN ANTONIO, BAGGAO, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.078 |
| 174 | 22BB0087CSSP - BASIC INFRA.PROG.(BIP)-ACCESS RDS AND/OR BR.FROM THE NAT'L RD/S LEAD'G TO MAJ./STRATEGIC PUBLIC BLDS/FACILITIES-CONC.OF SAN VICENTE BRGY RD AT SITIO CAGNASOL (ZONE 4 TO ZONE 5 CONNECTING NAT'L HIGHWAY (CVR) BRGY.SAN VICENTE,GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.072 |
| 175 | 25BB0054CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF RD, PHASE 2, BARANGAY NABACCAYAN, GATTARAN, CAGAYAN | Region II | Cagayan 1st DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.080 |