Opening the dossier…
Opening the dossier…
Contractor dossier
124 projects on file, including joint ventures this contractor is part of.
Total projects
124
Total budget
₱6.8B
Average progress
93.2%
Completion rate
71.8%
Average risk score
52.6
Medium risk on average, out of 100
Flagged as unusual
16
12.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 118 | ₱6.3B | 52.6 | 16 | 92.8% |
| Region X | 5 | ₱460.1M | 55.7 | 0 | 100.0% |
| Region XIII | 1 | ₱9.9M | 38.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 68 | ₱3.2B | 48.9 | 1 | 95.7% |
| Flood Control and Drainage | 28 | ₱1.7B | 50.0 | 0 | 97.6% |
| Bridges | 11 | ₱506.4M | 50.8 | 3 | 99.6% |
| GAA 2025 SSP | 5 | ₱547.3M | 95.7 | 5 | 43.5% |
| OTHER | 4 | ₱144.2M | 74.2 | 2 | 68.1% |
| Bridges, Roads | 3 | ₱262.9M | 61.4 | 2 | 82.3% |
| Buildings and Facilities | 3 | ₱287.9M | 32.7 | 2 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱120.3M | 93.6 | 1 | 89.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25L00132INSTALLATION OF STREETLIGHTS WITH ROAD SAFETY FACILITIES ALONG PADADA - KIBLAWAN - MATANAO RD, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.7M | 12% | High risk96 | Flagged0.045 |
| 25LD0153CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-REVETMENT ALONG BALATUKAN RIVER (MAGSAYSAY BRIDGE UPSTREAM & DOWNSTREAM SECTION, PHASE 1), MAGSAYSAY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱98.5M | 76% | High risk96 | Flagged0.025 |
| 25LD0160CONSTRUCTION OF CONCRETE ROAD, BARANGAY POB.-MALANO-BOB-BRGY. BARAYONG-BALA, MAGSAYSAY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱122.5M | 46% | High risk96 | Flagged0.036 |
| 25LD0157CONSTRUCTION OF FLOOD CONTROL STRUCTURE-CONCRETE REVETMENT AT MATANAO RIVER ALONG MATANAO NHS LEFT SIDE DOWNSTREAM SECTION PHASE I, MATANAO, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱122.8M | 61% | High risk96 | Flagged0.034 |
| 25LD0167CONSTRUCTION OF ROAD, BARANGAY TACUL- BARANGAY UPPER BALA, MAGSAYSAY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱109.9M | 24% | High risk95 | Flagged0.041 |
| 25LD0031ROAD WIDENING- DAVAO- COTABATO RD (JCT DIGOS- COTABATO SECT)- K1585+530-K1587+422, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱71.7M | 88% | High risk94 | Flagged0.006 |
| 25LD0033WIDENING OF BRIDGE- SINAWILAN BR. (B00146MN) ALONG DAVAO - COTABATO RD (JCT DIGOS- COTABATO SECT), DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱48.7M | 91% | High risk93 | —-0.001 |
| 24LD0082WIDENING OF BRIDGE - MARBER PARALLEL BR. (B02003MN) ALONG DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT), DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱49.7M | 72% | High risk76 | Flagged0.019 |
| 23LF0088CABASAGAN PARALLEL BR. ALONG SURIGAO DEL SUR BDRY - DAVAO OR COASTAL RD, BOSTON, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱58.4M | 100% | High risk76 | —-0.004 |
| 24LD0037CONSTRUCTION OF CONCRETE ROAD- PADADA- PIAPE- PALILI CIRCUMFERENTIAL ROAD LEADING TO SCUBA DIVING, BEACH RESORTS, MANGROVE PLANTATIONS, BRGY. PIAPE, PADADA, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱6.9M | 0% | High risk73 | Flagged0.041 |
| 20LH0039CONSTRUCTION OF DRAINAGE FACILITIES AT BARANGAY CROSSING BAYABAS, TORIL, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱29.2M | 100% | High risk72 | —-0.026 |
| 21L00065CONSTRUCTION OF ROAD, JCT. DAVAO - BUKIDNON ROAD (CALINAN SECTION) - WANGAN - SUBASTA - TAGAKPAN - TUNGKALAN - TAGURANO - CATIGAN - BARACATAN - SIBULAN - TIBOLO - KAPATAGAN ROAD (PACKAGE C), DAVAO CITY | Region XI | Region XI | On-Going | ₱113.6M | 53% | High risk67 | Flagged0.007 |
| 18L00037CONC. OF JCT. MATANAO (ALONG DAVAO-COTABATO RD)-NEW VISAYAS-JCT. HAGONOY(ALONG DIGOS-MAKAR RD) BYPAS | Region XI | Region XI | Completed | ₱181.4M | 100% | High risk65 | —-0.060 |
| 21L00063CONSTRUCTION OF ROAD, JCT. DAVAO - BUKIDNON ROAD (CALINAN SECTION) - WANGAN - SUBASTA - TAGAKPAN - TUNGKALAN - TAGURANO - CATIGAN - BARACATAN - SIBULAN - TIBOLO - KAPATAGAN ROAD (PACKAGE A), DAVAO CITY | Region XI | Region XI | Completed | ₱135.1M | 100% | High risk64 | —-0.066 |
| 21L00064CONSTRUCTION OF ROAD, JCT. DAVAO-BUKIDNON ROAD (CALINAN SECTION) - WANGAN - SUBASTA - TAGAKPAN - TUNGKALAN - TAGURANO - CATIGAN - BARACATAN - SIBULAN - TIBOLO - KAPATAGAN ROAD (PACKAGE B), DAVAO CITY | Region XI | Region XI | Completed | ₱135.1M | 100% | High risk64 | —-0.060 |
| 23K00156CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALATIPAY RIVER, KALILANGAN, BUKIDNON, PACKAGE 1 | Region X | Region X | Completed | ₱139.6M | 100% | High risk63 | —-0.055 |
| 18L00059WIDENING (4 INTO 6 LANES) OF DAVAO-COT. RD, (DAVAO CITY-JCT. DIGOS SECTION) INCL. RROW,(CORONON-ZONE | Region XI | Region XI | Terminated | ₱118.7M | 100% | High risk63 | —-0.009 |
| 23LD0034CONSTRUCTION OF MARAWER-POGPOG ROAD, STA. CRUZ, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱96M | 86% | High risk63 | —-0.030 |
| 21L00144RECONSTRUCTION TO CONCRETE PAVEMENT - JCT. DAVAO - BUKIDNON ROAD (CALINAN SECTION) - WANGAN - SUBASTA - TAGAKPAN - TUNGKALAN - TAGURANO - BAYABAS - CATIGAN - BARACATAN - SIBULAN - TIBOLO - KAPATAGAN ROAD (PACKAGE A), DAVAO CITY | Region XI | Region XI | Completed | ₱95.8M | 100% | High risk62 | —-0.075 |
| 24LD0023CONSTRUCTION OF ROAD, POB.- NEW ILOCOS SAMBINI- CENTRO NEW ILOCOS- KILOLOG, SAN ISIDRO, MAGSAYSAY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱93.6M | 94% | High risk62 | —-0.041 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25L00132INSTALLATION OF STREETLIGHTS WITH ROAD SAFETY FACILITIES ALONG PADADA - KIBLAWAN - MATANAO RD, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱93.7M | 12% | High risk96 | Flagged0.045 |
| 24LD0037CONSTRUCTION OF CONCRETE ROAD- PADADA- PIAPE- PALILI CIRCUMFERENTIAL ROAD LEADING TO SCUBA DIVING, BEACH RESORTS, MANGROVE PLANTATIONS, BRGY. PIAPE, PADADA, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱6.9M | 0% | High risk73 | Flagged0.041 |
| 25LD0167CONSTRUCTION OF ROAD, BARANGAY TACUL- BARANGAY UPPER BALA, MAGSAYSAY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱109.9M | 24% | High risk95 | Flagged0.041 |
| 25LD0160CONSTRUCTION OF CONCRETE ROAD, BARANGAY POB.-MALANO-BOB-BRGY. BARAYONG-BALA, MAGSAYSAY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱122.5M | 46% | High risk96 | Flagged0.036 |
| 25LD0157CONSTRUCTION OF FLOOD CONTROL STRUCTURE-CONCRETE REVETMENT AT MATANAO RIVER ALONG MATANAO NHS LEFT SIDE DOWNSTREAM SECTION PHASE I, MATANAO, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱122.8M | 61% | High risk96 | Flagged0.034 |
| 17L00193CONST. OF 4-STOREY OFFICE BUILDING WITH ROOF DECK; DEPT. OF AGRICULTURE REGION XI,BAGO OSHIRO,MINTAL | Region XI | Region XI | Completed | ₱156M | 100% | Medium risk34 | Flagged0.029 |
| 25LD0153CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-REVETMENT ALONG BALATUKAN RIVER (MAGSAYSAY BRIDGE UPSTREAM & DOWNSTREAM SECTION, PHASE 1), MAGSAYSAY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱98.5M | 76% | High risk96 | Flagged0.025 |
| 24LD0082WIDENING OF BRIDGE - MARBER PARALLEL BR. (B02003MN) ALONG DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT), DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱49.7M | 72% | High risk76 | Flagged0.019 |
| 21L00065CONSTRUCTION OF ROAD, JCT. DAVAO - BUKIDNON ROAD (CALINAN SECTION) - WANGAN - SUBASTA - TAGAKPAN - TUNGKALAN - TAGURANO - CATIGAN - BARACATAN - SIBULAN - TIBOLO - KAPATAGAN ROAD (PACKAGE C), DAVAO CITY | Region XI | Region XI | On-Going | ₱113.6M | 53% | High risk67 | Flagged0.007 |
| 25LD0031ROAD WIDENING- DAVAO- COTABATO RD (JCT DIGOS- COTABATO SECT)- K1585+530-K1587+422, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱71.7M | 88% | High risk94 | Flagged0.006 |
| 24LD0200CONSTRUCTION OF FARM-TO-MILL ROAD IN PUROK 2, NEW QUEZON, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱8.5M | 89% | Medium risk41 | Flagged0.006 |
| 22LD0067CONSTRUCTION OF MAGALLANES BRIDGE, MATANAO, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱67.6M | 98% | Medium risk55 | Flagged0.003 |
| 22LD0065CONSTRUCTION OF BRIDGE, BRGY. POBLACION, MAGSAYSAY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱67.6M | 98% | Medium risk55 | Flagged0.002 |
| 22LD0066CONSTRUCTION OF KASYAWA BRIDGE, MATANAO, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱67.6M | 100% | Medium risk55 | Flagged0.001 |
| 20L00081ROAD WIDENING - BYPASS ROAD, JCT. MATANAO (ALONG DAVAO - COTABATO ROAD) - NEW VISAYAS - JCT. HAGONOY (ALONG DIGOS - MAKAR ROAD), PACKAGE A, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱83.8M | 95% | Medium risk59 | Flagged0.001 |
| 18L00168SOUTHERN MINDANAO INTEGRATED AGRICULTURAL LABORATORY: DEPT. OF AGRICULTURE REGION XI,MANAMBULAN,DAVA | Region XI | Region XI | Completed | ₱130M | 100% | Medium risk53 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 18LB0023CONST./IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS JCT. DAVAO COTABATO ROA | Region XI | Davao City DEO | Completed | ₱17.5M | 100% | Medium risk46 | —-0.091 |
| 102 | 18LB0024CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS MABINI EXTENSION WITH DRAINAGE, ROAD LEADING TO DAVAO CROCODILE PARK (JCT. QUIRINO TO JCT. MAA ROAD) DAVAO CITY | Region XI | Davao City DEO | Completed | ₱25.4M | 100% | Medium risk46 | —-0.091 |
| 103 | 19LH0007CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SITIO BARACAYO-SITIO SAN AGUSTIN ROAD CONNECTING TO BANANA PROCESSING AREA AND VEGIE NOODLE PROCESSING FACILITY IN SUPPORT TO BANANA AND VEGETABLES INDUSTRIES, TORIL DISTRICT, DAVAO CITY, DAVAO DEL SUR | Region XI | Davao City 2nd DEO | Completed | ₱24.5M | 100% | Medium risk46 | —-0.092 |
| 104 | 20LB0287CONSTRUCTION OF REVETMENT ALONG TALOMO RIVER STA. 3+340 TO STA. 3+455, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.071 |
| 105 | 19LB0029CONSTRUCTION OF REVETMENT-DAVAO RIVER, DAVAO RIVER BRIDGE, DOWNSTREAM, RIGHT BANK, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.076 |
| 106 | 23LD0009CONSTRUCTION OF REVETMENT ALONG DIGOS RIVER, DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱39.2M | 100% | Medium risk46 | —-0.077 |
| 107 | 21LD0046CONSTRUCTION OF CONCRETE REVETMENT/DIKE ALONG DIGOS RIVER, DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱30.5M | 100% | Medium risk46 | —-0.077 |
| 108 | 25LD0164CONSTRUCTION OF FLOOD CONTROL STRUCTURE, MATTI AND BALUTAKAY RIVER, DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱39.2M | 33% | Medium risk46 | —-0.019 |
| 109 | 20LD0040CONSTRUCTION OF CONCRETE REVETMENT ALONG DIGOS RIVER, RUPARAN SECTION, DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱29.4M | 100% | Medium risk46 | —-0.076 |
| 110 | 18LB0020CONST/IMP OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, MATINA APLAYA-PUNTA DUMALAG ROAD LEADING TO SEAGULL BEACH RESORT PAWIKAN SANCTUARY AND FELIS BEACH RESORT, BRGY. MATINA APLAYA, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱12.3M | 100% | Medium risk45 | —-0.092 |
| 111 | 20LB0236CONSTRUCTION OF FLOOD CONTROL STRUCTURE FOR DATU LOHO CREEK, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱14.7M | 100% | Medium risk44 | —-0.070 |
| 112 | 22LD0053CONSTRUCTION OF ROAD, LEADING TO BAGOBO-TAGABAWA INDIGENOUS COMMUNITY, OLD PALKATAHAN, BARANGAY BINATON, DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱5M | 100% | Medium risk44 | —-0.052 |
| 113 | 20LD0133CONCRETING OF BRGY. NEW ILOCOS TO BRGY. SAN ISIDRO FMR, BRGY. NEW ILOCOS AND BRGY. SAN ISIDRO, MAGSAYSAY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱9.7M | 100% | Medium risk42 | —-0.033 |
| 114 | 23LD0114CONSTRUCTION OF FARM-TO-MILL ROAD IN BRGY. NEW CEBU, SULOP, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱10.1M | 100% | Medium risk42 | —-0.032 |
| 115 | 24LD0200CONSTRUCTION OF FARM-TO-MILL ROAD IN PUROK 2, NEW QUEZON, HAGONOY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱8.5M | 89% | Medium risk41 | Flagged0.006 |
| 116 | 20LD0126CONCRETING OF FARM-TO-MILL ROAD AT BRGY. SAN JOSE, MATANAO, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱6.6M | 100% | Medium risk41 | —-0.031 |
| 117 | 20NH0019CONCRETING OF JCR NATIONAL HIGHWAY - SITIO UBOS ROAD, BRGY. SAN JUAN, MADRID, SURIGAO DEL SUR | Region XIII | Surigao del Sur 1st DEO | Completed | ₱9.9M | 100% | Medium risk38 | —-0.081 |
| 118 | 17L00193CONST. OF 4-STOREY OFFICE BUILDING WITH ROOF DECK; DEPT. OF AGRICULTURE REGION XI,BAGO OSHIRO,MINTAL | Region XI | Region XI | Completed | ₱156M | 100% | Medium risk34 | Flagged0.029 |
| 119 | 21LD0021RECONSTRUCTION TO CONCRETE PAVEMENT-DIGOS DIV RD-K1565+920 - K1566+000, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱3.9M | 100% | Low risk21 | —-0.085 |
| 120 | 22LD0005CONSTRUCTION OF CONCRETE ROAD-SITIO BALUTAKAY-PUROK PLUTO ROAD CONNECTING BALUTAKAY COFFEE FARMERS ASSOCIATION (BACOFA) AND BANSALAN MT. APO NATIONAL PARK ROAD IN SUPPORT OF COFFEE PROCESSING INDUSTRY, BRGY. MANAGA, BANSALAN, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱1.5M | 100% | Low risk19 | —-0.084 |
| 121 | 22LD0014CONSTRUCTION OF CONCRETE ROAD-JCT. TRES DE MAYO-BRGY. GOMA LEADING TO MAHILAK FALLS, BRGY. GOMA, DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱1M | 100% | Low risk19 | —-0.084 |
| 122 | 22LD0013CONSTRUCTION OF CONCRETE ROAD-NRJ LEADING TO SOONG ECOPARK, DIGOS CITY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱1M | 100% | Low risk19 | —-0.084 |
| 123 | 22LD0011CONSTRUCTION OF CONCRETE ROAD-PADADA-PIAPE-PALILI CIRCUMFERENTIAL ROAD LEADING TO SCUBA DIVING, BEACH RESORTS, MANGROVE PLANTATIONS, BRGY. PIAPE, PADADA, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱1M | 100% | Low risk19 | —-0.084 |
| 124 | 17LD0055CONSTRUCTION OF SMALL MULTIPURPOSE BUILDING, POBLACION MATANAO, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱1.9M | 100% | Low risk11 | —-0.058 |