Opening the dossier…
Opening the dossier…
Contractor dossier
49 projects on file, including joint ventures this contractor is part of.
Total projects
49
Total budget
₱9.7B
Average progress
94.8%
Completion rate
79.6%
Average risk score
55.8
Medium risk on average, out of 100
Flagged as unusual
7
14.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 28 | ₱2B | 46.1 | 0 | 100.0% |
| Central Office | 13 | ₱6.9B | 74.4 | 5 | 97.0% |
| National Capital Region | 4 | ₱549.9M | 63.8 | 2 | 46.5% |
| Region IV-A | 2 | ₱142.3M | 55.0 | 0 | 99.2% |
| Region IV-B | 2 | ₱136.3M | 54.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 27 | ₱6.6B | 59.2 | 3 | 99.1% |
| Roads | 10 | ₱844.7M | 46.0 | 0 | 95.1% |
| Bridges | 5 | ₱542M | 47.7 | 1 | 96.9% |
| Buildings and Facilities | 3 | ₱396.2M | 57.0 | 1 | 66.1% |
| OTHER | 2 | ₱959.3M | 71.0 | 2 | 67.8% |
| Bridges, Roads | 2 | ₱342.2M | 61.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19Z00008CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER AT IGUIG, CAGAYAN AND AGGUNETAN, LASAM, CAGAYAN | Central Office | Flood Control Management Cluster | On-Going | ₱945.5M | 100% | High risk78 | Flagged0.023 |
| 17Z00019PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 6 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 17+450 TO STA. 18+130, LEFT AND RIGHT BANKS, MARIKINA CITY | Central Office | Flood Control Management Cluster | Completed | ₱689.3M | 100% | High risk77 | —-0.001 |
| 19Z00034PILOT CHANNELING AT LAGUNA LAKE FROM NAPINDAN RIVER TO MANGGAHAN FLOODWAY CHANNEL - PHASE I | Central Office | Flood Control Management Cluster | Completed | ₱271M | 100% | High risk77 | —-0.039 |
| 18A00116CONSTRUCTION/REHABILITATION OF BOLO RIVER DAM, BRGY. SAN ISIDRO, DUMALNEG, ILOCOS NORTE | Central Office | Flood Control Management Cluster | On-Going | ₱366.6M | 100% | High risk76 | Flagged0.024 |
| 19Z00036CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTE | Central Office | Flood Control Management Cluster | On-Going | ₱533.8M | 94% | High risk76 | Flagged0.027 |
| 18Z00030METRO MANILA FLOOD MANAGEMENT PROJECT, PHASE I, REHABILITATION WORKS FOR BALUT PUMPING STATION | Central Office | Flood Control Management Cluster | Completed | ₱390.9M | 100% | High risk76 | —-0.026 |
| 17Z00005REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Central Office | Flood Control Management Cluster | Completed | ₱862M | 100% | High risk76 | —-0.004 |
| 17C00054CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF PAMPANGA RIVER BASIN, BARANGAY STA. CRUZ, SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱144.6M | 100% | High risk76 | —-0.057 |
| 18C00051CONSTRUCTION OF FLOOD CONTROL WORKS ALONG SAPANG BAYU AND SAPANG MARAGUL, LUBAO AND STA. RITA, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱94M | 100% | High risk75 | —-0.052 |
| 17Z00004REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Central Office | Flood Control Management Cluster | Completed | ₱862.9M | 100% | High risk73 | Flagged0.017 |
| 19Z00040CONTRACT PACKAGE 2A, BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM I, DESIGN AND BUILD BRIDGES IN LUZON (REGION III - NUEVA ECIJA, AURORA, PAMPANGA, ZAMBALES AND BATAAN) | Central Office | Bridges Management Cluster | On-Going | ₱222.8M | 85% | High risk73 | Flagged0.025 |
| 17CH0090CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM - CONSTRUCTION/IMPROVEMENT | Region III | Pampanga 2nd DEO | Completed | ₱46.8M | 100% | High risk69 | —-0.061 |
| 24O00160CONSTRUCTION OF MULTI-PURPOSE BUILDING,EAST AVENUE MEDICAL CENTER, EAST AVENUE, DILIMAN, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱96.5M | 36% | High risk69 | Flagged0.015 |
| 23Z00026CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) ANDDRAINAGE SYSTEMS ALONG THE FOLLOWING RIVERS;A.) CADCADIR RIVER, BRGY. BACSAY CATARAOAN SUR, CLAVERIA, CAGAYANB.) CADCADIR RIVER, BRGYS. UNION AND CADCADIR, CLAVERIA, CAGAYANC.) CABICUNGAN RI | Central Office | Flood Control Management Cluster | On-Going | ₱1.4B | 100% | High risk68 | —-0.025 |
| 17CH0035CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE | Region III | Pampanga 2nd DEO | Completed | ₱28M | 100% | High risk68 | —-0.061 |
| 17CH0019CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/IMPROVEM | Region III | Pampanga 2nd DEO | Completed | ₱41.9M | 100% | High risk67 | —-0.061 |
| 17CH0005CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF SLOPE | Region III | Pampanga 2nd DEO | Completed | ₱39.7M | 100% | High risk67 | —-0.061 |
| 17CH0001CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF SLOPE | Region III | Pampanga 2nd DEO | Completed | ₱44.5M | 100% | High risk67 | —-0.060 |
| 17CH0033CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD | Region III | Pampanga 2nd DEO | Completed | ₱27.3M | 100% | High risk67 | —-0.061 |
| 17E00008CONCRETING OF ARMY ROAD (BAGUBAG-SORVILLE-GOZAR-BINAKAS) LEADING TO PAF GOZAR RADAR STATION IN MT. AMBULONG, BRGY. SORVILLE, STA. 2+745.80-STA.5+587.20; STA.6+242-STA.6+364, LUBANGISLAND, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱91.9M | 100% | High risk67 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19Z00036CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTE | Central Office | Flood Control Management Cluster | On-Going | ₱533.8M | 94% | High risk76 | Flagged0.027 |
| 19Z00040CONTRACT PACKAGE 2A, BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM I, DESIGN AND BUILD BRIDGES IN LUZON (REGION III - NUEVA ECIJA, AURORA, PAMPANGA, ZAMBALES AND BATAAN) | Central Office | Bridges Management Cluster | On-Going | ₱222.8M | 85% | High risk73 | Flagged0.025 |
| 18A00116CONSTRUCTION/REHABILITATION OF BOLO RIVER DAM, BRGY. SAN ISIDRO, DUMALNEG, ILOCOS NORTE | Central Office | Flood Control Management Cluster | On-Going | ₱366.6M | 100% | High risk76 | Flagged0.024 |
| 19Z00008CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER AT IGUIG, CAGAYAN AND AGGUNETAN, LASAM, CAGAYAN | Central Office | Flood Control Management Cluster | On-Going | ₱945.5M | 100% | High risk78 | Flagged0.023 |
| 17Z00004REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Central Office | Flood Control Management Cluster | Completed | ₱862.9M | 100% | High risk73 | Flagged0.017 |
| 24O00160CONSTRUCTION OF MULTI-PURPOSE BUILDING,EAST AVENUE MEDICAL CENTER, EAST AVENUE, DILIMAN, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱96.5M | 36% | High risk69 | Flagged0.015 |
| 20O00076DESIGN AND BUILD PROJECT FOR THE REPAIR/RENOVATION OF LANDBANK 1 BUILDING AT BUENDIA, GIL PUYAT, MAKATI CITY | National Capital Region | National Capital Region | Completed | ₱289.4M | 100% | High risk64 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 19Z00008CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER AT IGUIG, CAGAYAN AND AGGUNETAN, LASAM, CAGAYAN | Central Office | Flood Control Management Cluster | On-Going | ₱945.5M | 100% | High risk78 | Flagged0.023 |
| 2 | 17Z00019PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 6 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 17+450 TO STA. 18+130, LEFT AND RIGHT BANKS, MARIKINA CITY | Central Office | Flood Control Management Cluster | Completed | ₱689.3M | 100% | High risk77 | —-0.001 |
| 3 | 19Z00034PILOT CHANNELING AT LAGUNA LAKE FROM NAPINDAN RIVER TO MANGGAHAN FLOODWAY CHANNEL - PHASE I | Central Office | Flood Control Management Cluster | Completed | ₱271M | 100% | High risk77 | —-0.039 |
| 4 | 18A00116CONSTRUCTION/REHABILITATION OF BOLO RIVER DAM, BRGY. SAN ISIDRO, DUMALNEG, ILOCOS NORTE | Central Office | Flood Control Management Cluster | On-Going | ₱366.6M | 100% | High risk76 | Flagged0.024 |
| 5 | 19Z00036CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTE | Central Office | Flood Control Management Cluster | On-Going | ₱533.8M | 94% | High risk76 | Flagged0.027 |
| 6 | 18Z00030METRO MANILA FLOOD MANAGEMENT PROJECT, PHASE I, REHABILITATION WORKS FOR BALUT PUMPING STATION | Central Office | Flood Control Management Cluster | Completed | ₱390.9M | 100% | High risk76 | —-0.026 |
| 7 | 17Z00005REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Central Office | Flood Control Management Cluster | Completed | ₱862M | 100% | High risk76 | —-0.004 |
| 8 | 17C00054CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF PAMPANGA RIVER BASIN, BARANGAY STA. CRUZ, SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱144.6M | 100% | High risk76 | —-0.057 |
| 9 | 18C00051CONSTRUCTION OF FLOOD CONTROL WORKS ALONG SAPANG BAYU AND SAPANG MARAGUL, LUBAO AND STA. RITA, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱94M | 100% | High risk75 | —-0.052 |
| 10 | 17Z00004REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Central Office | Flood Control Management Cluster | Completed | ₱862.9M | 100% | High risk73 | Flagged0.017 |
| 11 | 19Z00040CONTRACT PACKAGE 2A, BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM I, DESIGN AND BUILD BRIDGES IN LUZON (REGION III - NUEVA ECIJA, AURORA, PAMPANGA, ZAMBALES AND BATAAN) | Central Office | Bridges Management Cluster | On-Going | ₱222.8M | 85% | High risk73 | Flagged0.025 |
| 12 | 17CH0090CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM - CONSTRUCTION/IMPROVEMENT | Region III | Pampanga 2nd DEO | Completed | ₱46.8M | 100% | High risk69 | —-0.061 |
| 13 | 24O00160CONSTRUCTION OF MULTI-PURPOSE BUILDING,EAST AVENUE MEDICAL CENTER, EAST AVENUE, DILIMAN, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱96.5M | 36% | High risk69 | Flagged0.015 |
| 14 | 23Z00026CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) ANDDRAINAGE SYSTEMS ALONG THE FOLLOWING RIVERS;A.) CADCADIR RIVER, BRGY. BACSAY CATARAOAN SUR, CLAVERIA, CAGAYANB.) CADCADIR RIVER, BRGYS. UNION AND CADCADIR, CLAVERIA, CAGAYANC.) CABICUNGAN RI | Central Office | Flood Control Management Cluster | On-Going | ₱1.4B | 100% | High risk68 | —-0.025 |
| 15 | 17CH0035CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE | Region III | Pampanga 2nd DEO | Completed | ₱28M | 100% | High risk68 | —-0.061 |
| 16 | 17CH0019CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/IMPROVEM | Region III | Pampanga 2nd DEO | Completed | ₱41.9M | 100% | High risk67 | —-0.061 |
| 17 | 17CH0005CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF SLOPE | Region III | Pampanga 2nd DEO | Completed | ₱39.7M | 100% | High risk67 | —-0.061 |
| 18 | 17CH0001CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF SLOPE | Region III | Pampanga 2nd DEO | Completed | ₱44.5M | 100% | High risk67 | —-0.060 |
| 19 | 17CH0033CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD | Region III | Pampanga 2nd DEO | Completed | ₱27.3M | 100% | High risk67 | —-0.061 |
| 20 | 17E00008CONCRETING OF ARMY ROAD (BAGUBAG-SORVILLE-GOZAR-BINAKAS) LEADING TO PAF GOZAR RADAR STATION IN MT. AMBULONG, BRGY. SORVILLE, STA. 2+745.80-STA.5+587.20; STA.6+242-STA.6+364, LUBANGISLAND, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱91.9M | 100% | High risk67 | —-0.030 |
| 21 | 19C00042FLOOD CONTROL WORKS-IMPROVEMENT/REHABILITATION OF GROUNDSILLS ALONG SACOBIA-BAMBAN RIVER, MABALACAT, PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱46.4M | 82% | High risk67 | —-0.008 |
| 22 | 18D00029CONVERGENCE & SPL. SUPPORT PROG., CONST./IMPVT. OF ACCESS ROADS LDG. TO TRADES, IND. & ECONOMIC ZONES, PULO-DIEZMO RD. CONNECTING BRGY. PULO & BRGY. DIEZMO-NAT'L. ROAD TO SLEX IN SUPPORT OF TRANSPORT & LOGISTICS CO., INCL. BR., CABUYAO CITY, LAGUNA | Region IV-A | Region IV-A | Completed | ₱130.6M | 100% | High risk66 | —-0.051 |
| 23 | 20O00076DESIGN AND BUILD PROJECT FOR THE REPAIR/RENOVATION OF LANDBANK 1 BUILDING AT BUENDIA, GIL PUYAT, MAKATI CITY | National Capital Region | National Capital Region | Completed | ₱289.4M | 100% | High risk64 | Flagged0.003 |
| 24 | 25O00068CONSTRUCTION OF MULTI-PURPOSE BUILDING, EAST AVENUE MEDICAL CENTER, EAST AVENUE, DILIMAN, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱95.1M | 0% | High risk63 | —-0.021 |
| 25 | 18O00005MINDANAO AVENUE EXTENSION SEGMENT 2C, PHASE I AND PHASE II INCLUDING ROW CALOOCAN CITY AND VALENZUELA CITY | National Capital Region | National Capital Region | On-Going | ₱69M | 51% | Medium risk60 | —-0.010 |