Opening the dossier…
Opening the dossier…
Contractor dossier
255 projects on file, including joint ventures this contractor is part of.
Total projects
255
Total budget
₱15.6B
Average progress
87.8%
Completion rate
73.3%
Average risk score
56.0
Medium risk on average, out of 100
Flagged as unusual
29
11.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 193 | ₱12.2B | 56.4 | 23 | 86.9% |
| National Capital Region | 58 | ₱2.9B | 54.4 | 5 | 92.1% |
| Region IV-A | 3 | ₱249.9M | 59.8 | 1 | 66.6% |
| Region IV-B | 1 | ₱186M | 67.7 | 0 | 82.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 153 | ₱11.6B | 61.8 | 18 | 87.5% |
| Buildings and Facilities | 54 | ₱1.7B | 42.9 | 1 | 94.5% |
| Roads | 29 | ₱961.7M | 42.4 | 1 | 86.2% |
| GAA 2025 SSP | 9 | ₱818.6M | 95.3 | 9 | 55.0% |
| Bridges | 5 | ₱163.2M | 35.0 | 0 | 100.0% |
| GAA 2025 OO-2 | 2 | ₱188.1M | 85.7 | 0 | 59.5% |
| Bridges, Roads | 1 | ₱28.4M | 35.6 | 0 | 100.0% |
| OTHER | 1 | ₱9.6M | 30.3 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱4.4M | 14.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CB0093CONSTRUCTION OF DIKE (PHASE 4) ALONG NABASAG RIVER, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 55% | High risk96 | Flagged0.021 |
| 25CB0095CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 6) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 25CB0094CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 5) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 25CB0098CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 2) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 61% | High risk96 | Flagged0.020 |
| 25CB0099CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 3) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 59% | High risk96 | Flagged0.020 |
| 25CP0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,SITIO DUPLAS,BRGY. KALAWAK | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 13% | High risk96 | Flagged0.036 |
| 25OG0097REHABILITATION OF ROAD, BARANGAY SAN ROQUE, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱94.5M | 67% | High risk95 | Flagged0.018 |
| 25OB0352CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY HARAPIN ANG BUKAS, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱58.2M | 62% | High risk95 | Flagged0.015 |
| 25OB0346CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY DAANG BAKAL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱38.7M | 68% | High risk94 | Flagged0.011 |
| 25OB0453IMPROVEMENT OF LAGUNA LAKESHORE AREA, BARANGAY LOWER BICUTAN, TAGUIG CITY (PHASE I) | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94M | 70% | High risk86 | —-0.009 |
| 25OB0454IMPROVEMENT OF LAGUNA LAKESHORE AREA, BARANGAY LOWER BICUTAN, TAGUIG CITY (PHASE II) | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94.1M | 49% | High risk85 | —-0.004 |
| 24CC0577CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE E, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0575CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE C, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0576CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE D, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0574CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE B, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0573CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE A, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 24CB0138CONSTRUCTION OF FLOOD CONTROL DIKE AT TANATO, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱94.3M | 90% | High risk83 | Flagged0.039 |
| 24CC0597CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, PACKAGE B, PUROK 4, BARANGAY PULONG GUBAT, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 85% | High risk83 | Flagged0.035 |
| 24CC0599CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GUIGUINTO RIVER (TRIBUTARY), PACKAGE G, PUROK 4, BARANGAY BAGONG SILANG, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk83 | Flagged0.008 |
| 24CC0598CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER (TRIBUTARY), PACKAGE D), PUROK 5, BARANGAY BULIHAN, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk82 | Flagged0.008 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23O00068CONSTRUCTION OF THE NBI MAIN BUILDING (PHASE I) | National Capital Region | National Capital Region | On-Going | ₱447.7M | 0% | Medium risk58 | Flagged0.071 |
| 24CC0574CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE B, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0575CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE C, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0576CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE D, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0577CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE E, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0573CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE A, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 24C00677CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCT. ALONG, MADLUM RIVER(PHASE 1),BACK OF BIAK-NA-BATO- ELEM. SCHOOL SECTION, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱95.1M | 0% | High risk81 | Flagged0.056 |
| 24D00309CONSTRUCTION OF DRAINAGE ALONG BACOOR DIVERSION ROAD, CAVITE | Region IV-A | Region IV-A | On-Going | ₱112.3M | 10% | High risk72 | Flagged0.050 |
| 24CB0138CONSTRUCTION OF FLOOD CONTROL DIKE AT TANATO, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱94.3M | 90% | High risk83 | Flagged0.039 |
| 24CB0139CONSTRUCTION OF FLOOD CONTROL DIKE AT NABASAG RIVER (PHASE 1), PILAR, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱141.5M | 63% | High risk74 | Flagged0.039 |
| 25CP0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,SITIO DUPLAS,BRGY. KALAWAK | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 13% | High risk96 | Flagged0.036 |
| 24CC0597CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, PACKAGE B, PUROK 4, BARANGAY PULONG GUBAT, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 85% | High risk83 | Flagged0.035 |
| 24CC0643CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY PRITIL (KABILANG BAKOOD TO PUROK 4) GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱70.4M | 60% | High risk77 | Flagged0.035 |
| 23CC0521CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. SAN VICENTE, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.5M | 84% | High risk77 | Flagged0.034 |
| 24OF0263CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT FILINVEST, BARANGAY BAGONGSILANGAN, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱143.3M | 74% | High risk74 | Flagged0.029 |
| 23CC0519CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. LOOK 2ND, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱57.9M | 100% | High risk76 | Flagged0.027 |
| 25CB0093CONSTRUCTION OF DIKE (PHASE 4) ALONG NABASAG RIVER, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 55% | High risk96 | Flagged0.021 |
| 25CB0095CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 6) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 25CB0094CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 5) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 25CB0098CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 2) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 61% | High risk96 | Flagged0.020 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25CB0093CONSTRUCTION OF DIKE (PHASE 4) ALONG NABASAG RIVER, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 55% | High risk96 | Flagged0.021 |
| 2 | 25CB0095CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 6) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 3 | 25CB0094CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 5) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 4 | 25CB0098CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 2) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 61% | High risk96 | Flagged0.020 |
| 5 | 25CB0099CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 3) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 59% | High risk96 | Flagged0.020 |
| 6 | 25CP0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,SITIO DUPLAS,BRGY. KALAWAK | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 13% | High risk96 | Flagged0.036 |
| 7 | 25OG0097REHABILITATION OF ROAD, BARANGAY SAN ROQUE, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱94.5M | 67% | High risk95 | Flagged0.018 |
| 8 | 25OB0352CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY HARAPIN ANG BUKAS, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱58.2M | 62% | High risk95 | Flagged0.015 |
| 9 | 25OB0346CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY DAANG BAKAL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱38.7M | 68% | High risk94 | Flagged0.011 |
| 10 | 25OB0453IMPROVEMENT OF LAGUNA LAKESHORE AREA, BARANGAY LOWER BICUTAN, TAGUIG CITY (PHASE I) | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94M | 70% | High risk86 | —-0.009 |
| 11 | 25OB0454IMPROVEMENT OF LAGUNA LAKESHORE AREA, BARANGAY LOWER BICUTAN, TAGUIG CITY (PHASE II) | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94.1M | 49% | High risk85 | —-0.004 |
| 12 | 24CC0577CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE E, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 13 | 24CC0575CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE C, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 14 | 24CC0576CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE D, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 15 | 24CC0574CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE B, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 16 | 24CC0573CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE A, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 17 | 24CB0138CONSTRUCTION OF FLOOD CONTROL DIKE AT TANATO, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱94.3M | 90% | High risk83 | Flagged0.039 |
| 18 | 24CC0597CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, PACKAGE B, PUROK 4, BARANGAY PULONG GUBAT, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 85% | High risk83 | Flagged0.035 |
| 19 | 24CC0599CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GUIGUINTO RIVER (TRIBUTARY), PACKAGE G, PUROK 4, BARANGAY BAGONG SILANG, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk83 | Flagged0.008 |
| 20 | 24CC0598CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER (TRIBUTARY), PACKAGE D), PUROK 5, BARANGAY BULIHAN, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk82 | Flagged0.008 |
| 21 | 24CC0600CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER (TRIBUTARY), PACKAGE G, PUROK 4, BARANGAY SAN JOSE, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk82 | Flagged0.009 |
| 22 | 24C00677CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCT. ALONG, MADLUM RIVER(PHASE 1),BACK OF BIAK-NA-BATO- ELEM. SCHOOL SECTION, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱95.1M | 0% | High risk81 | Flagged0.056 |
| 23 | 24CC0289CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AND WATERWAYS, BARANGAY IGULOT, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱99M | 100% | High risk80 | —-0.021 |
| 24 | 24CC0151CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AND WATERWAYS ALONG BOCAUE RIVER, BARANGAY BAMBANG (KAKULISAN), BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱99M | 98% | High risk80 | —-0.020 |
| 25 | 24CC0149CONSTRUCTION/IMPROVEMENT OF SLOPE PROTECTION STRUCTURE AND WATERWAYS, BRGY. BAMBANG, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱99M | 100% | High risk80 | —-0.050 |