Contractor dossier
255 projects on file, including joint ventures this contractor is part of.
Total projects
255
Total budget
₱15.6B
Average progress
87.8%
Completion rate
73.3%
Average risk score
56.0
Medium risk on average, out of 100
Flagged as unusual
29
11.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 193 | ₱12.2B | 56.4 | 23 | 86.9% |
| National Capital Region | 58 | ₱2.9B | 54.4 | 5 | 92.1% |
| Region IV-A | 3 | ₱249.9M | 59.8 | 1 | 66.6% |
| Region IV-B | 1 | ₱186M | 67.7 | 0 | 82.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 153 | ₱11.6B | 61.8 | 18 | 87.5% |
| Buildings and Facilities | 54 | ₱1.7B | 42.9 | 1 | 94.5% |
| Roads | 29 | ₱961.7M | 42.4 | 1 | 86.2% |
| GAA 2025 SSP | 9 | ₱818.6M | 95.3 | 9 | 55.0% |
| Bridges | 5 | ₱163.2M | 35.0 | 0 | 100.0% |
| GAA 2025 OO-2 | 2 | ₱188.1M | 85.7 | 0 | 59.5% |
| Bridges, Roads | 1 | ₱28.4M | 35.6 | 0 | 100.0% |
| OTHER | 1 | ₱9.6M | 30.3 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱4.4M | 14.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CB0093CONSTRUCTION OF DIKE (PHASE 4) ALONG NABASAG RIVER, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 55% | High risk96 | Flagged0.021 |
| 25CB0095CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 6) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 25CB0094CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 5) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 25CB0098CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 2) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 61% | High risk96 | Flagged0.020 |
| 25CB0099CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 3) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 59% | High risk96 | Flagged0.020 |
| 25CP0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,SITIO DUPLAS,BRGY. KALAWAK | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 13% | High risk96 | Flagged0.036 |
| 25OG0097REHABILITATION OF ROAD, BARANGAY SAN ROQUE, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | On-Going | ₱94.5M | 67% | High risk95 | Flagged0.018 |
| 25OB0352CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY HARAPIN ANG BUKAS, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱58.2M | 62% | High risk95 | Flagged0.015 |
| 25OB0346CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY DAANG BAKAL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱38.7M | 68% | High risk94 | Flagged0.011 |
| 25OB0453IMPROVEMENT OF LAGUNA LAKESHORE AREA, BARANGAY LOWER BICUTAN, TAGUIG CITY (PHASE I) | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94M | 70% | High risk86 | —-0.009 |
| 25OB0454IMPROVEMENT OF LAGUNA LAKESHORE AREA, BARANGAY LOWER BICUTAN, TAGUIG CITY (PHASE II) | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94.1M | 49% | High risk85 | —-0.004 |
| 24CC0577CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE E, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0575CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE C, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0576CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE D, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0574CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE B, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0573CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE A, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 24CB0138CONSTRUCTION OF FLOOD CONTROL DIKE AT TANATO, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱94.3M | 90% | High risk83 | Flagged0.039 |
| 24CC0597CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, PACKAGE B, PUROK 4, BARANGAY PULONG GUBAT, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 85% | High risk83 | Flagged0.035 |
| 24CC0599CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GUIGUINTO RIVER (TRIBUTARY), PACKAGE G, PUROK 4, BARANGAY BAGONG SILANG, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk83 | Flagged0.008 |
| 24CC0598CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER (TRIBUTARY), PACKAGE D), PUROK 5, BARANGAY BULIHAN, PLARIDEL, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk82 | Flagged0.008 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23O00068CONSTRUCTION OF THE NBI MAIN BUILDING (PHASE I) | National Capital Region | National Capital Region | On-Going | ₱447.7M | 0% | Medium risk58 | Flagged0.071 |
| 24CC0574CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE B, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0575CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE C, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0576CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE D, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0577CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE E, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0573CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE A, BARANGAY TANAWAN, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 24C00677CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SIPAG-FLOOD MITIGATION STRUCT. PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF SLOPE PROTECTION STRUCT. ALONG, MADLUM RIVER(PHASE 1),BACK OF BIAK-NA-BATO- ELEM. SCHOOL SECTION, SAN MIGUEL, BULACAN | Region III | Region III | On-Going | ₱95.1M | 0% | High risk81 | Flagged0.056 |
| 24D00309CONSTRUCTION OF DRAINAGE ALONG BACOOR DIVERSION ROAD, CAVITE | Region IV-A | Region IV-A | On-Going | ₱112.3M | 10% | High risk72 | Flagged0.050 |
| 24CB0138CONSTRUCTION OF FLOOD CONTROL DIKE AT TANATO, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱94.3M | 90% | High risk83 | Flagged0.039 |
| 24CB0139CONSTRUCTION OF FLOOD CONTROL DIKE AT NABASAG RIVER (PHASE 1), PILAR, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱141.5M | 63% | High risk74 | Flagged0.039 |
| 25CP0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,SITIO DUPLAS,BRGY. KALAWAK | Region III | Bulacan 3rd DEO | On-Going | ₱142.5M | 13% | High risk96 | Flagged0.036 |
| 24CC0597CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, PACKAGE B, PUROK 4, BARANGAY PULONG GUBAT, BALAGTAS, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱96.5M | 85% | High risk83 | Flagged0.035 |
| 24CC0643CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY PRITIL (KABILANG BAKOOD TO PUROK 4) GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱70.4M | 60% | High risk77 | Flagged0.035 |
| 23CC0521CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. SAN VICENTE, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.5M | 84% | High risk77 | Flagged0.034 |
| 24OF0263CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT FILINVEST, BARANGAY BAGONGSILANGAN, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱143.3M | 74% | High risk74 | Flagged0.029 |
| 23CC0519CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. LOOK 2ND, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱57.9M | 100% | High risk76 | Flagged0.027 |
| 25CB0093CONSTRUCTION OF DIKE (PHASE 4) ALONG NABASAG RIVER, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 55% | High risk96 | Flagged0.021 |
| 25CB0095CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 6) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 25CB0094CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 5) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 25CB0098CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 2) | Region III | Bataan 2nd DEO | On-Going | ₱96.9M | 61% | High risk96 | Flagged0.020 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 23OE0178REHABILITATION OF SCHOOL BUILDING AT GRACEANO LOPEZ JAENA ELEMENTARY SCHOOL, BARANGAY 537, MANILA | National Capital Region | North Manila DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.104 |
| 152 | 25OG0112REHABILITATION OF ROAD, BARANGAY MASAGANA, PACKAGE 2, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Completed | ₱19.2M | 100% | Medium risk46 | —-0.099 |
| 153 | 22OE0064REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS- SECONDARY ROADS - DIMASALANG ST -K0005 + (-348) - K0005 + (-229), K0005 + (-431) - K0005 + (-348), K0005+ (-474) - K0005 + (-431), K0005+(-931) - K0005+(-474) | National Capital Region | North Manila DEO | Completed | ₱18.9M | 100% | Medium risk46 | —-0.101 |
| 154 | 16OB0091CONSTRUCTION OF TWO (2) STOREY HOME ECONOMICS BUILDING, SAN JUAN ELEMENTARY SCHOOL, SAN JUAN CITY. | National Capital Region | Metro Manila 1st DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.074 |
| 155 | 24OE0116REHABILITATION OF DRAINAGE SYSTEM AT ZONE 41 - 57 (PHASE 3), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱29.1M | 100% | Medium risk46 | —-0.088 |
| 156 | 24OB0088REHABILITATION OF SAPANG MALAPIT CREEK, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱16.3M | 100% | Medium risk46 | —-0.090 |
| 157 | 21OD0142CONSTRUCTION OF FLOOD CONTROL WALL ALONG THE BANKS OF CREEKS IN BRGY. 160, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.089 |
| 158 | 24OE0114REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - G TUAZON ST - K0009 + 208.70 - K0009 + 437 | National Capital Region | North Manila DEO | Completed | ₱8.8M | 100% | Medium risk46 | —-0.101 |
| 159 | 23OA0059REHABILITATION OF RIVERWALL ALONG TANGOS RIVER (PHASE 9), NAVOTAS CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱19.8M | 100% | Medium risk45 | —-0.087 |
| 160 | 21OD0102PREVENTIVE MAINTNANCE - TERTIARY ROADS DEPARO-CAMARIN RD. - K0021+788 - K0022+126, K0022+142 - K0022+522, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱5.2M | 100% | Medium risk45 | —-0.096 |
| 161 | 23CC0482CONSTRUCTION OF RIVER PROTECTION STRUCTURE ALONG GUIGUINTO RIVER (STA. 05+707 TO STA. 05+907), BARANGAY DAUNGAN, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | Medium risk44 | —-0.026 |
| 162 | 23CC0386CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), LOLOMBOY ELEMENTARY SCHOOL, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱48.1M | 100% | Medium risk43 | —-0.100 |
| 163 | 22CC0327PACKAGE 1 - CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE I), LOLOMBOY ELEMENTARY SCHOOL AND CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZEN BUILDING), AZICATE, LOLOMBOY, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49.5M | 100% | Medium risk43 | —-0.100 |
| 164 | 19CC0287REPLACEMENT OF BAMBANG BRIDGE BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱74.2M | 100% | Medium risk42 | —-0.059 |
| 165 | 23CC0374CONSTRUCTION OF MULTI-PURPOSE BUILDING, TAAL ELEMENTARY SCHOOL, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49.5M | 100% | Medium risk41 | —-0.100 |
| 166 | 23CC0388CONSTRUCTION OF MATERIALS RECOVERY FACILITY (MRF) AT LIKOD GUBAT BATIA PROPER, BATIA, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49.5M | 100% | Medium risk41 | —-0.100 |
| 167 | 22CC0091REHABILITATION OF MAJOR RIVER SYSTEM WITH FLOOD CONTROL STRUCTURE AT BULUSAN, CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱91.5M | 100% | Medium risk41 | —-0.081 |
| 168 | 22CC0114CONSTRUCTION OF MULTI-PURPOSE BUILDING (CENTRAL MATERIALS RECOVERY FACILITY) AT BARANGAY POBLACION, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk40 | —-0.098 |
| 169 | 23CC0348CONSTRUCTION OF LONGOS-IBA ROAD INCLUDING DRAINAGE SYSTEM, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱76.8M | 50% | Medium risk40 | —-0.044 |
| 170 | 21CC0261CONSTRUCTION OF BAMBANG ROAD, BARANGAY BAMBANG, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱24.7M | 100% | Medium risk38 | —-0.104 |
| 171 | 21CC0260CONSTRUCTION OF LOLOMBOY ROAD, BARANGAY LOLOMBOY, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱24.7M | 100% | Medium risk38 | —-0.105 |
| 172 | 22CC0194CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE II), BARANGAY LOLOMBOY, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱4.8M | 100% | Medium risk38 | —-0.105 |
| 173 | 22CC0189CONST./IMP. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - MATUNGAO-GUIGUINTO PROVINCIAL ROAD CONNECTING MCARTHUR HIGHWAY AND BANTAYAN ROAD IN SUPPORT | Region III | Bulacan 1st DEO | Completed | ₱49.7M | 100% | Medium risk37 | —-0.101 |
| 174 | 22CC0112CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY LOLOMBOY, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱8.9M | 100% | Medium risk37 | —-0.107 |
| 175 | 21CC0259NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MALOLOS CITY CIRCUMFERENTIAL ROAD, BULACAN, CITY OF MALOLOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49.9M | 100% | Medium risk37 | —-0.102 |