Contractor dossier
112 projects on file, including joint ventures this contractor is part of.
Total projects
112
Total budget
₱5.6B
Average progress
92.1%
Completion rate
78.6%
Average risk score
51.1
Medium risk on average, out of 100
Flagged as unusual
1
0.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 106 | ₱5B | 50.3 | 0 | 91.8% |
| Negros Island Region | 4 | ₱393.5M | 62.0 | 0 | 95.3% |
| Region III | 2 | ₱193M | 74.4 | 1 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 64 | ₱4.7B | 55.9 | 1 | 87.8% |
| Roads | 32 | ₱357.4M | 44.6 | 0 | 100.0% |
| Buildings and Facilities | 13 | ₱316.6M | 39.5 | 0 | 92.2% |
| GAA 2025 OO-2 | 2 | ₱152.1M | 79.3 | 0 | 97.5% |
| OTHER | 1 | ₱27.4M | 50.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OD0035CONSTRUCTION OF REINFORCED CONCRETE BOX CULVERT ALONG D. AQUINO STREET, BARANGAY 67, 66, 61, 60, 57, 55, 54 & 53, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱57.6M | 95% | High risk90 | —-0.022 |
| 23CC0547CONSTRUCTION OF RIVER CONTROL SYSTEM AND REHABILITATION OF WATERWAYS ALONG BOCAUE RIVER BRGY. BAMBANG BOCAUE, BULACAN (STA. 13+041 TO STA. 13+245) | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk83 | Flagged0.006 |
| 25OB0128CONSTRUCTION OF SLOPE PROTECTION ALONG C-6 OPEN CHANNEL (PHASE 18), TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱94.6M | 100% | High risk68 | —-0.042 |
| 25OD0169CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG POLO RIVER (PHASE 20), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 71% | High risk68 | —-0.031 |
| 25OD0146CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG POLO RIVER (PHASE 17), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 74% | High risk68 | —-0.033 |
| 25OD0170CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 17), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 53% | High risk68 | —-0.026 |
| 25OD0171CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 18), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 50% | High risk68 | —-0.026 |
| 25OD0217INSTALLATION OF NEW UNIT PUMPS WITH FLOOD GATE AT WAWANG PULO PUMPING STATION WITH CONSTRUCTION OF PUMP HOUSE, BARANGAY WAWANG PULO, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱190.5M | 49% | High risk68 | —-0.017 |
| 22OD0122CONSTRUCTION OF PUMPING STATION ALONG VEINTE REALES, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱234M | 100% | High risk67 | —-0.039 |
| 25OD0168CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG POLO RIVER (PHASE 19), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 74% | High risk67 | —-0.033 |
| 25OD0167CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG POLO RIVER (PHASE 18), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 74% | High risk67 | —-0.033 |
| 22OD0123CONSTRUCTION OF FLOOD CONTROL RIVER WALL (ROAD DIKE) ALONG VEINTE REALES CREEK (RIGHT SIDE BANK), BRGY. VEINTE REALES, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱199.7M | 100% | High risk67 | —-0.050 |
| 23CC0545CONSTRUCTION OF RIVER CONTROL SYSTEM AND REHABILITATION OF WATERWAYS ALONG BALAGTAS RIVER BRGY. SAN JUAN BALAGTAS, BULACAN (STA. 14+577 TO STA. 14+781) | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk66 | —-0.017 |
| 25OD0172CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 21), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱94.9M | 50% | High risk65 | —-0.035 |
| 25OD0205CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALIGAYA CREEK, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱94.5M | 30% | High risk65 | —-0.033 |
| 24OD0082CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 9), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱94.1M | 100% | High risk65 | —-0.072 |
| 23OD0095CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 2), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱94.4M | 100% | High risk65 | —-0.073 |
| 23OD0094CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 1), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱94.3M | 100% | High risk65 | —-0.072 |
| 25OB0130CONSTRUCTION OF SLOPE PROTECTION ALONG TAGUIG RIVER LAKESHORE AREA (PHASE 2), TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94.6M | 100% | High risk65 | —-0.051 |
| 24OB0191CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG C-6 OPEN CHANNEL, (PHASE 5), TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱94.6M | 100% | High risk65 | —-0.076 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23CC0547CONSTRUCTION OF RIVER CONTROL SYSTEM AND REHABILITATION OF WATERWAYS ALONG BOCAUE RIVER BRGY. BAMBANG BOCAUE, BULACAN (STA. 13+041 TO STA. 13+245) | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk83 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25OD0035CONSTRUCTION OF REINFORCED CONCRETE BOX CULVERT ALONG D. AQUINO STREET, BARANGAY 67, 66, 61, 60, 57, 55, 54 & 53, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱57.6M | 95% | High risk90 | —-0.022 |
| 2 | 23CC0547CONSTRUCTION OF RIVER CONTROL SYSTEM AND REHABILITATION OF WATERWAYS ALONG BOCAUE RIVER BRGY. BAMBANG BOCAUE, BULACAN (STA. 13+041 TO STA. 13+245) | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk83 | Flagged0.006 |
| 3 | 25OB0128CONSTRUCTION OF SLOPE PROTECTION ALONG C-6 OPEN CHANNEL (PHASE 18), TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱94.6M | 100% | High risk68 | —-0.042 |
| 4 | 25OD0169CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG POLO RIVER (PHASE 20), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 71% | High risk68 | —-0.031 |
| 5 | 25OD0146CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG POLO RIVER (PHASE 17), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 74% | High risk68 | —-0.033 |
| 6 | 25OD0170CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 17), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 53% | High risk68 | —-0.026 |
| 7 | 25OD0171CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 18), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 50% | High risk68 | —-0.026 |
| 8 | 25OD0217INSTALLATION OF NEW UNIT PUMPS WITH FLOOD GATE AT WAWANG PULO PUMPING STATION WITH CONSTRUCTION OF PUMP HOUSE, BARANGAY WAWANG PULO, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱190.5M | 49% | High risk68 | —-0.017 |
| 9 | 22OD0122CONSTRUCTION OF PUMPING STATION ALONG VEINTE REALES, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱234M | 100% | High risk67 | —-0.039 |
| 10 | 25OD0168CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG POLO RIVER (PHASE 19), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 74% | High risk67 | —-0.033 |
| 11 | 25OD0167CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG POLO RIVER (PHASE 18), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱142.1M | 74% | High risk67 | —-0.033 |
| 12 | 22OD0123CONSTRUCTION OF FLOOD CONTROL RIVER WALL (ROAD DIKE) ALONG VEINTE REALES CREEK (RIGHT SIDE BANK), BRGY. VEINTE REALES, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱199.7M | 100% | High risk67 | —-0.050 |
| 13 | 23CC0545CONSTRUCTION OF RIVER CONTROL SYSTEM AND REHABILITATION OF WATERWAYS ALONG BALAGTAS RIVER BRGY. SAN JUAN BALAGTAS, BULACAN (STA. 14+577 TO STA. 14+781) | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk66 | —-0.017 |
| 14 | 25OD0172CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 21), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱94.9M | 50% | High risk65 | —-0.035 |
| 15 | 25OD0205CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALIGAYA CREEK, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱94.5M | 30% | High risk65 | —-0.033 |
| 16 | 24OD0082CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 9), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱94.1M | 100% | High risk65 | —-0.072 |
| 17 | 23OD0095CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 2), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱94.4M | 100% | High risk65 | —-0.073 |
| 18 | 23OD0094CONSTRUCTION OF FLOOD CONTROL WALL ALONG POLO RIVER (PHASE 1), VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱94.3M | 100% | High risk65 | —-0.072 |
| 19 | 25OB0130CONSTRUCTION OF SLOPE PROTECTION ALONG TAGUIG RIVER LAKESHORE AREA (PHASE 2), TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94.6M | 100% | High risk65 | —-0.051 |
| 20 | 24OB0191CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG C-6 OPEN CHANNEL, (PHASE 5), TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱94.6M | 100% | High risk65 | —-0.076 |
| 21 | 24OB0190CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG C-6 OPEN CHANNEL, (PHASE 4), TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱94.6M | 100% | High risk65 | —-0.077 |
| 22 | 24OB0192CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG C-6 OPEN CHANNEL, (PHASE 6), TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱94.6M | 100% | High risk65 | —-0.077 |
| 23 | 25OB0131CONSTRUCTION OF SLOPE PROTECTION ALONG TAGUIG RIVER LAKESHORE AREA (PHASE 3), TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94.6M | 100% | High risk64 | —-0.051 |
| 24 | 24OB0197CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG LABASAN RIVER (WEST BANK) PACKAGE 3, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱94.6M | 100% | High risk64 | —-0.077 |
| 25 | 24OB0170CONSTRUCTION OF SLOPE PROTECTION ALONG C-6 OPEN CHANNEL (PHASE 10), TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱94.5M | 100% | High risk64 | —-0.077 |