Contractor dossier
29 projects on file, including joint ventures this contractor is part of.
Total projects
29
Total budget
₱327.8M
Average progress
86.9%
Completion rate
72.4%
Average risk score
57.9
Medium risk on average, out of 100
Flagged as unusual
7
24.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 29 | ₱327.8M | 57.9 | 7 | 86.9% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 20 | ₱217.5M | 57.5 | 3 | 89.5% |
| Flood Control and Drainage | 5 | ₱75M | 53.8 | 2 | 100.0% |
| Buildings and Facilities | 2 | ₱6.4M | 37.3 | 0 | 98.6% |
| GAA 2025 SSP | 1 | ₱9.6M | 95.9 | 1 | 31.4% |
| OTHER | 1 | ₱19.3M | 89.7 | 1 | 0.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AB0095SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, SITIO BUGA-GUIMOD-SULKOK, SANTA RITA, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱9.6M | 31% | High risk96 | Flagged0.036 |
| 25AA0633CONCRETING OF BRGY. PASNGAL-BRGY. CADARATAN FMR, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.3M | 0% | High risk90 | Flagged0.078 |
| 25AA0296CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF RD, BARANGAY LIBNAOAN, PIDDIG, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.009 |
| 25AA0298CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF ROAD, BARANGAY 22 BOYBOY, PIDDIG, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 0% | High risk80 | Flagged0.009 |
| 24AA0403CONCRETING OFBRGY. SALET-BULANGON FMR, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 92% | High risk76 | Flagged0.017 |
| 24AA0365BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BRGY. 37 CALAYAB, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 99% | High risk76 | —-0.045 |
| 23AA0230SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF BUTTONG-RARABURAN-DARAYDAY ROAD, BARANGAY RARABURAN, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱29.4M | 100% | High risk71 | —-0.033 |
| 21AB0024CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PAOAY ECO-PARK, BRGY. NANGUYUDAN, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱11.3M | 100% | High risk69 | —-0.084 |
| 20AB0035CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PAOAY ECO-PARK, BRGY. NANGUYUDAN, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱19.6M | 100% | High risk68 | —-0.084 |
| 22AB0042CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PAOAY ECO-PARK, BRGY. NANGUYUDAN, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱4.9M | 100% | High risk67 | —-0.083 |
| 19AB0125CONCRETING OF SITIO LAGIT EXPANSION AREA, BRGY. SUBA FMR, BRGY. SUBA, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱6M | 100% | High risk66 | —-0.031 |
| 20AB0140CONCRETING OF RAGUS-BATO, BRGY. NANGUYUDAN FMR, BRGY. NANGUYUDAN, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱12.5M | 100% | High risk65 | —-0.032 |
| 17AB0236REPAIR/REHABILITATION OF DAMAGED EXISTING DIKE ALONG CURA RIVER AT BRGY. SAGPATAN, DINGRAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱13.1M | 100% | High risk64 | Flagged0.004 |
| 24AB0014CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY PASIL, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 97% | High risk61 | —-0.037 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AA0633CONCRETING OF BRGY. PASNGAL-BRGY. CADARATAN FMR, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.3M | 0% | High risk90 | Flagged0.078 |
| 25AB0095SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, SITIO BUGA-GUIMOD-SULKOK, SANTA RITA, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱9.6M | 31% | High risk96 | Flagged0.036 |
| 24AA0403CONCRETING OFBRGY. SALET-BULANGON FMR, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 92% | High risk76 | Flagged0.017 |
| 25AA0296CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF RD, BARANGAY LIBNAOAN, PIDDIG, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.009 |
| 25AA0298CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF ROAD, BARANGAY 22 BOYBOY, PIDDIG, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 0% | High risk80 | Flagged0.009 |
| 16AB0172REHABILITATION OF PUTTAO-BAGBAGO RIVER CONTROL SOLSONA RIVER, BRGY. PUTTAO BAGBAGO, SOLSONA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱13.6M | 100% | Medium risk59 | Flagged0.005 |
| 17AB0236REPAIR/REHABILITATION OF DAMAGED EXISTING DIKE ALONG CURA RIVER AT BRGY. SAGPATAN, DINGRAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱13.1M | 100% | High risk64 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25AB0095SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, SITIO BUGA-GUIMOD-SULKOK, SANTA RITA, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱9.6M | 31% | High risk96 | Flagged0.036 |
| 2 | 25AA0633CONCRETING OF BRGY. PASNGAL-BRGY. CADARATAN FMR, BACARRA, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.3M | 0% | High risk90 | Flagged0.078 |
| 3 | 25AA0296CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF RD, BARANGAY LIBNAOAN, PIDDIG, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.009 |
| 4 | 25AA0298CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF ROAD, BARANGAY 22 BOYBOY, PIDDIG, I.N. | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 0% | High risk80 | Flagged0.009 |
| 5 | 24AA0403CONCRETING OFBRGY. SALET-BULANGON FMR, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19.1M | 92% | High risk76 | Flagged0.017 |
| 6 | 24AA0365BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BRGY. 37 CALAYAB, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱4.8M | 99% | High risk76 | —-0.045 |
| 7 | 23AA0230SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF BUTTONG-RARABURAN-DARAYDAY ROAD, BARANGAY RARABURAN, LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱29.4M | 100% | High risk71 | —-0.033 |
| 8 | 21AB0024CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PAOAY ECO-PARK, BRGY. NANGUYUDAN, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱11.3M | 100% | High risk69 | —-0.084 |
| 9 | 20AB0035CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PAOAY ECO-PARK, BRGY. NANGUYUDAN, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱19.6M | 100% | High risk68 | —-0.084 |
| 10 | 22AB0042CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PAOAY ECO-PARK, BRGY. NANGUYUDAN, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱4.9M | 100% | High risk67 | —-0.083 |
| 11 | 19AB0125CONCRETING OF SITIO LAGIT EXPANSION AREA, BRGY. SUBA FMR, BRGY. SUBA, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱6M | 100% | High risk66 | —-0.031 |
| 12 | 20AB0140CONCRETING OF RAGUS-BATO, BRGY. NANGUYUDAN FMR, BRGY. NANGUYUDAN, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱12.5M | 100% | High risk65 | —-0.032 |
| 13 | 17AB0236REPAIR/REHABILITATION OF DAMAGED EXISTING DIKE ALONG CURA RIVER AT BRGY. SAGPATAN, DINGRAS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱13.1M | 100% | High risk64 | Flagged0.004 |
| 14 | 24AB0014CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY PASIL, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | On-Going | ₱4.9M | 97% | High risk61 | —-0.037 |
| 15 | 16AB0172REHABILITATION OF PUTTAO-BAGBAGO RIVER CONTROL SOLSONA RIVER, BRGY. PUTTAO BAGBAGO, SOLSONA, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱13.6M | 100% | Medium risk59 | Flagged0.005 |
| 16 | 17AB0070CONCRETING AND REHABILITATION OF PAOAY - SALBANG - SURGUI - SAN AGUSTIN - PASIL - SUNGADAN FMR, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱9.4M | 100% | Medium risk57 | —-0.001 |
| 17 | 20AB0090CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BONGO RIVER, BRGY. ESCODA, MARCOS, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱28.9M | 100% | Medium risk51 | —-0.066 |
| 18 | 20AB0003REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, DINGRAS-MARCOS OLD RD - K0507 + 000 - K0507 + 280 | Region I | Ilocos Norte 2nd DEO | Completed | ₱9.8M | 100% | Medium risk50 | —-0.084 |
| 19 | 21AB0017OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS, PIAS-CURRIMAO-BALACCAD ROAD, K0473+283 - K0473+474, K0475+805 - K0476+073, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱6.4M | 100% | Medium risk48 | —-0.084 |
| 20 | 19AB0031CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS CONSTRUCTION OF CAYUBOG CREEK AT PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.066 |
| 21 | 23AB0152CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG CAYUBOG CREEK, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱9.7M | 100% | Medium risk47 | —-0.068 |
| 22 | 23AB0022OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS, PIAS-CURRIMAO-BALACCAD RD - K0474 + 876 - K0475 + 439 | Region I | Ilocos Norte 2nd DEO | Completed | ₱9.5M | 100% | Medium risk47 | —-0.078 |
| 23 | 22AB0100INSTALLATION OF LED STREETLIGHTS ALONG PROVINCIAL ROAD, CURRIMAO, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.081 |
| 24 | 22AB0114CONSTRUCTION OF PASWE - LAOA - BANNATOC ROAD, BARANGAY CAYUBOG, PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱14.7M | 100% | Medium risk46 | —-0.081 |
| 25 | 21AB0143LOCAL INFRASTRUCTURE PROGRAM, REHABILITATION/IMPROVEMENT OF PAOAY-SIDEG ROAD (KM471.150 - 473.390), PAOAY, ILOCOS NORTE | Region I | Ilocos Norte 2nd DEO | Completed | ₱12.4M | 100% | Medium risk45 | —-0.084 |