28 projects on file, including joint ventures this contractor is part of.
Total projects
28
Total budget
₱757.4M
Average progress
100.0%
Completion rate
96.4%
Average risk score
46.8
Medium risk on average, out of 100
Flagged as unusual
2
7.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 14 | ₱321M | 44.0 | 0 | 100.0% |
| Cordillera Administrative Region | 11 | ₱311.3M | 50.2 | 2 | 100.0% |
| Region VIII | 1 | ₱108.1M | 59.3 | 0 | 100.0% |
| Region II | 1 | ₱15.9M | 51.8 | 0 | 100.0% |
| Region VI | 1 | ₱1M | 29.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Bridges | 10 | ₱212.2M | 51.2 | 0 | 100.0% |
| Flood Control and Drainage | 8 | ₱190.2M | 49.7 | 2 | 100.0% |
| Roads | 7 | ₱343M | 52.0 | 0 | 100.0% |
| Buildings and Facilities | 3 | ₱12.1M | 11.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18A00090CONSTRUCTION OF MISSING LINKS/ NEW ROADS - PIDDIG-CARASI-CALANASAN ROAD INCL. ROW, ILOCOS NORTE | Region I | Region I | Completed | ₱86.6M | 100% | High risk69 | —-0.070 |
| 17AD0026ASSET PRESERVATION OF NATIONAL ROADS: CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS: PRIMARY ROADS, MANILA NORTH ROAD, K0362+415-K0364+000 (L & R) AND K0369+200-K0370+060 (L & R) | Region I | Ilocos Sur 2nd DEO | Completed | ₱37M | 100% | High risk64 | —-0.038 |
| 18PL0087CONSTRUCTION OF NEW PERMANENT BRIDGES (TANUDAN BRIDGE) ALONG TABUK BANAWE RD VIA TANUDAN-BARLIG RD | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱96.2M | 100% | High risk61 | —-0.014 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17PL0204PACKAGE 2: A) BALONG FLOOD CONTROL ALONG BALIGATAN CREEK, BRGY. BALONG, TABUK CITY, B) CANAL LINING (MEGA CANAL), PUROK 5, BULANAO CENTRO, TABUK CITY, C) BULANAO CEMETERY FLOOD CONTROL, BULANAO, TABUK CITY, D) APPAS FLOOD CONTROL (AGLAWA, BAG-AY & AGNAYA) | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱76.8M | 100% | Medium risk58 | Flagged0.016 |
| 17PL0216NAMBUCAYAN NATIONAL HIGH SCHOOL FLOOD CONTROL ALONG MANANIG RIVER | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱16.9M | 100% | Medium risk51 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 18A00090CONSTRUCTION OF MISSING LINKS/ NEW ROADS - PIDDIG-CARASI-CALANASAN ROAD INCL. ROW, ILOCOS NORTE | Region I | Region I | Completed | ₱86.6M | 100% | High risk69 | —-0.070 |
| 2 | 17AD0026ASSET PRESERVATION OF NATIONAL ROADS: CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS: PRIMARY ROADS, MANILA NORTH ROAD, K0362+415-K0364+000 (L & R) AND K0369+200-K0370+060 (L & R) | Region I | Ilocos Sur 2nd DEO | Completed | ₱37M | 100% | High risk64 | —-0.038 |
| 3 | 18PL0087CONSTRUCTION OF NEW PERMANENT BRIDGES (TANUDAN BRIDGE) ALONG TABUK BANAWE RD VIA TANUDAN-BARLIG RD | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱96.2M | 100% | High risk61 | —-0.014 |
| 4 | 17IC0060NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-OTHER PRIMARY ALONG PALO-CARIGARA-ORMOC ROAD, K0916+(-107) - K0916+795, K0916+809 - K0916+(-107), K0926+407 - K0927+221, K0927+233 - K0928+673, PALO-ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱108.1M | 100% | Medium risk59 | —-0.047 |
| 5 | 17PL0204PACKAGE 2: A) BALONG FLOOD CONTROL ALONG BALIGATAN CREEK, BRGY. BALONG, TABUK CITY, B) CANAL LINING (MEGA CANAL), PUROK 5, BULANAO CENTRO, TABUK CITY, C) BULANAO CEMETERY FLOOD CONTROL, BULANAO, TABUK CITY, D) APPAS FLOOD CONTROL (AGLAWA, BAG-AY & AGNAYA) | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱76.8M | 100% | Medium risk58 | Flagged0.016 |
| 6 | 16AD0153CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS: REPLACEMENT OF BRIDGES (TEMPORARY TO PERMANENT), PATAC BRIDGE (B0241LZ)ALONG JCT. CANDON-SALCEDO-DEL PILAR ROAD | Region I | Ilocos Sur 2nd DEO | Completed | ₱18.6M | 100% | Medium risk54 | —-0.018 |
| 7 | 16AD0135CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS: REPLACEMENT OF BRIDGES (FROM TEMPORARY TO PERMANENT), ATABAY BRIDGE (B00641LZ) ALONG STA. LUCIA-SALCEDO ROAD | Region I | Ilocos Sur 2nd DEO | Completed | ₱17.5M | 100% | Medium risk54 | —-0.022 |
| 8 | 16AD0141CONSTRUCTION/MIANTENANCE OF BRIDGES ALONG NATIONAL ROADS: REPLACEMENT OF PERMANENT WEAK BRIDGES, SAN TIBURCIO BRIDGE (1800640LZ) ALONG STA. LUCIA-SALCEDO ROAD | Region I | Ilocos Sur 2nd DEO | Completed | ₱15M | 100% | Medium risk54 | —-0.020 |
| 9 | 17AG0043CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS (HERMOSA BR. B00698LZ) AT PANGASINAN-ZA | Region I | Pangasinan 1st DEO | Completed | ₱5.1M | 100% | Medium risk52 | —-0.023 |
| 10 | 17BB0014CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NAT'L RD-REHAB./MAJOR REPAIR OF PERMANENT BRIDGES-BARACAOIT BRIDGE (B02074LZ) ALONG JGCCSMBPR, GATTARAN, CAGAYAN 1ST LD | Region II | Cagayan 1st DEO | Completed | ₱15.9M | 100% | Medium risk52 | —-0.018 |
| 11 | 17PL0062PACKAGE 9: CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES ALONG MT. PROVINCE BDRY. -CALANAN-PINUKPUK-ABBUT ROAD (CAGALUAN-CALANAN SECTION) A). NGIPEN BR. (B02219LZ) & B). PATIKING BR. (B02210L | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱9.6M | 100% | Medium risk52 | —-0.022 |
| 12 | 18PB0003RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, INI-IN BRIDGE (B02239LZ) ALONG ABBUT-CONNER ROAD | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱21.5M | 100% | Medium risk51 | —-0.045 |
| 13 | 18A00057CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES, AND ECONOMIC ZONES, POBLACION SUR-SORIOAN-LUCBUBAN-UBBOG-BAYBAYADING ROAD CONNECTING CANDON-SALCEDO-SAN EMILIO DEL PILAR NATIONAL ROAD IN SUPPORT OF THE CACAO PROCESSING CENTER AND CA | Region I | Region I | Completed | ₱66.7M | 100% | Medium risk51 | —-0.078 |
| 14 | 17PB0002CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - MABUBUA BRIDGE (B02241LZ ALONG ABBUT-CONNER ROAD | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱9.1M | 100% | Medium risk51 | —-0.018 |
| 15 | 17PL0216NAMBUCAYAN NATIONAL HIGH SCHOOL FLOOD CONTROL ALONG MANANIG RIVER | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱16.9M | 100% | Medium risk51 | Flagged0.006 |
| 16 | 17PL0213SITIO CASABANG NAMBUCAYAN FLOOD CONTROL ALONG MANANIG RIVER | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱8.4M | 100% | Medium risk50 | —-0.001 |
| 17 | 18PL0058CONSTRUCTION OF FLOOD CONTROL ALONG CHICO RIVER, BALAWAG, TABUK CITY, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱19M | 100% | Medium risk49 | —-0.065 |
| 18 | 18PL0059CONSTRUCTION OF FLOOD CONTROL ALONG CHICO RIVER, MALIN-AWA, TABUK CITY, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱14.3M | 100% | Medium risk49 | —-0.067 |
| 19 | 18PB0015CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF NABUANGAN FLOOD CONTROL, BRGY. NABUANGAN, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱35.9M | 100% | Medium risk49 | —-0.052 |
| 20 | 18AD0016CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE CONTROL SYSTEMS-CONSTRUCTION OF BALIDBID F/C,SALCEDO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.4M | 100% | Medium risk46 | —-0.068 |
| 21 | 18AD0015CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE CONTROL SYSTEMS-CONSTRUCTION OF POBLACION SUR F/C, SALCEDO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.4M | 100% | Medium risk46 | —-0.068 |
| 22 | 18AD0048CONSTRUCTION OF SALCEDO - DEL PILAR ROAD LEADING TO TIRAD PASS,SALCEDO AND DEL PILAR, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱37.8M | 100% | Medium risk46 | —-0.061 |
| 23 | 18AD0101CONCRETING OF DINWEDE EAST FMR, BRGY. DINWEDE EAST, CERVANTES, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱5.7M | 100% | Medium risk44 | —-0.036 |
| 24 | 17PL0037CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS-RAHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES-GOBGOB BR.(B02113LZ) ALONG MT. PROVINCE BDRY.-CALANAN-PINUKPUK-ABBUT RD (CALANAN-PINUKPUK SECTION) | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱3.6M | 100% | Medium risk31 | —-0.019 |
| 25 | 17GG0092CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - CABATUAN - NEW LUCENA - BANGA BANTE RD., K0025+159 - K0025+235, CABATUAN, ILOILO | Region VI | Iloilo 2nd DEO | Terminated | ₱1M | 100% | Low risk30 | —-0.034 |