Contractor dossier
298 projects on file, including joint ventures this contractor is part of.
Total projects
298
Total budget
₱17.3B
Average progress
92.6%
Completion rate
80.5%
Average risk score
54.4
Medium risk on average, out of 100
Flagged as unusual
11
3.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 124 | ₱7.3B | 52.4 | 6 | 92.9% |
| Region IV-A | 121 | ₱6.8B | 56.2 | 2 | 95.4% |
| National Capital Region | 49 | ₱2.7B | 53.5 | 1 | 88.1% |
| Central Office | 3 | ₱422.5M | 73.4 | 1 | 66.7% |
| Region II | 1 | ₱71.3M | 70.1 | 1 | 2.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 187 | ₱11.2B | 53.0 | 6 | 95.9% |
| Roads | 67 | ₱3.8B | 55.3 | 2 | 84.7% |
| Buildings and Facilities | 20 | ₱949.1M | 51.1 | 0 | 93.7% |
| OTHER | 16 | ₱1B | 70.0 | 3 | 89.8% |
| Bridges | 5 | ₱159.5M | 47.4 | 0 | 80.0% |
| GAA 2025 OO-2 | 1 | ₱93.6M | 93.1 | 0 | 91.2% |
| GAA 2025 OO-1 | 1 | ₱30.7M | 89.3 | 0 | 69.7% |
| Water Provision and Storage | 1 | ₱9.6M | 36.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CD0197CONSTRUCTION OF VALENZUELA - OBANDO - MEYCAUAYAN (VOM) FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER, STA. 5+750 - STA. 6+100, BARANGAY SALUYSOY, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 91% | High risk93 | —-0.017 |
| 25OH0066ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION- RECONSTRUCTION- UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS-PRES. DIOSDADO MACAPAGAL BLVD. - (S04019LZ) CHAINAGE 000 - CHAINAGE 278 | National Capital Region | South Manila DEO | On-Going | ₱30.7M | 70% | High risk89 | —-0.011 |
| 24CC0027CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BOCAUE RIVER, BARANGAY BAMBANG, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0026CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BOCAUE RIVER (PHASE II), BARANGAY BAMBANG, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 25CD0223CONCRETING OF BRGY. STO. CRISTO FMR, BRGY. STO. CRISTO, SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱28.9M | 0% | High risk79 | Flagged0.060 |
| 25DF0117ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROG CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS & PRINCIPAL RIVERS CONST OF REVETMENT ALONG ILANG-ILANG RIVER BRGY. SAN FRANCISCO, GEN. | Region IV-A | Cavite 1st DEO | On-Going | ₱93.6M | 45% | High risk79 | —-0.008 |
| 24CD0251CONSTRUCTION OF MULTI - PURPOSE BUILDING (GAD BUILDING), BARANGAY POBLACION, SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96M | 100% | High risk79 | —-0.030 |
| 24CC0659CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, BARANGAY MALIBONG BATA (PUROK 3), PANDI, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 7% | High risk78 | Flagged0.048 |
| 23CC0564CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. TIKAY, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 86% | High risk77 | Flagged0.033 |
| 24CC0663CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG HALANG RIVER AT PARONG PARONG, BARANGAY SAN PEDRO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.4M | 92% | High risk77 | Flagged0.026 |
| 23CC0517CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. NAMAYAN, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 73% | High risk77 | Flagged0.035 |
| 21O00087CONSTRUCTION OF REVETMENT ALONG MARIBLO CREEK, STA. 0+010.000 TO STA. 0+524.458 (LEFT AND RIGHT RIVER BANK), QUEZON CITY | Central Office | Flood Control Management Cluster | Completed | ₱195M | 100% | High risk76 | —-0.025 |
| 25CD0048CONSTRUCTION OF MUZON - GAYA-GAYA BY-PASS ROAD, PHASE VI, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 0% | High risk76 | —-0.008 |
| 24CD0151CONSTRUCTION OF BYPASS (ALTERNATE) ROAD, BARANGAY GAYA-GAYA (PHASE IV), SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱95M | 100% | High risk76 | —-0.056 |
| 25CC0051CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY DAUNGAN (PUROK 2), GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱78.7M | 78% | High risk76 | —-0.022 |
| 24CC0191CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY SAN MIGUEL (PUROK 7 TO PUROK 8), HAGONOY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.058 |
| 23CC0522CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. SANTO ROSARIO, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱64.8M | 65% | High risk76 | Flagged0.041 |
| 25CC0312CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY SAN AGUSTIN (PARONG PARONG), HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.3M | 92% | High risk76 | —-0.028 |
| 25CC0076CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY IBA-IBAYO (PUROK 1 TO PUROK 2), HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.4M | 90% | High risk76 | —-0.028 |
| 25CC0081CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER AT BARANGAY SANTA LUCIA (PUROK 5 TO PUROK 6), CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱82M | 89% | High risk76 | —-0.026 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CD0223CONCRETING OF BRGY. STO. CRISTO FMR, BRGY. STO. CRISTO, SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱28.9M | 0% | High risk79 | Flagged0.060 |
| 24CC0659CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, BARANGAY MALIBONG BATA (PUROK 3), PANDI, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 7% | High risk78 | Flagged0.048 |
| 23CC0522CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. SANTO ROSARIO, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱64.8M | 65% | High risk76 | Flagged0.041 |
| 23CC0517CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. NAMAYAN, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 73% | High risk77 | Flagged0.035 |
| 23CC0564CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. TIKAY, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 86% | High risk77 | Flagged0.033 |
| 24CC0663CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG HALANG RIVER AT PARONG PARONG, BARANGAY SAN PEDRO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.4M | 92% | High risk77 | Flagged0.026 |
| 24DF0303CONVERGENCE AND SPECIAL SUPPORT PROGRAMSPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239INSTALLATION OF ROADWAY LIGHTING STRUCTURES ALONG TANZA-TMC-INDANG ROAD, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱47.8M | 100% | High risk69 | Flagged0.015 |
| 21O00088CONSTRUCTION OF REVETMENT ALONG DARIO CREEK, STA. 0+020.000 TO STA. 0+351.894 (LEFT AND RIGHT RIVER BANK), QUEZON CITY | Central Office | Flood Control Management Cluster | On-Going | ₱135.7M | 0% | High risk75 | Flagged0.015 |
| 24DF0024ORG OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONST OF REVETMENT ALONG ILANG-ILANG RIVER, BUENAVISTA, PHASE IV, GEN TRIAS,CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱86.9M | 69% | High risk71 | Flagged0.009 |
| 24OH0055ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM-OFF-CARRIAGEWAY IMPROVEMENT-PRIMARY ROADS-CONSTRUCTION OF LOADING AND UNLOADING BAY AT ROXAS BOULEVARD CORNER EDSA, PASAY CITY PHASE II | National Capital Region | South Manila DEO | On-Going | ₱94.5M | 82% | High risk68 | Flagged0.006 |
| 25BH0242SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD, SAN ISIDRO - ECHAGUE ROAD, SAN ISIDRO AND ECHAGUE, ISABE | Region II | Isabela 4th DEO | On-Going | ₱71.3M | 3% | High risk70 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 276 | 23CC0238CONSTRUCTION OF REVETMENT ALONG HAGONOY RIVER AT BARANGAY SAGRADA FAMILIA, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | Medium risk35 | —-0.086 |
| 277 | 23CC0227CONSTRUCTION OF REVETMENT ALONG LABANGAN CHANNEL AT SITIO BUGA, BARANGAY SANTA ELENA, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱72.4M | 100% | Medium risk35 | —-0.087 |
| 278 | 23CC0231CONSTRUCTION OF REVETMENT ALONG LABANGAN CHANNEL AND ITS TRIBUTARIES AT BARANGAY SANTA ELENA, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱67.5M | 100% | Medium risk35 | —-0.089 |
| 279 | 19CD0050CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG KAYTUTONG BRIDGE, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱49M | 100% | Medium risk35 | —-0.092 |
| 280 | 23CD0162CONSTRUCTION OF 3STY9CL, SALUYSOY INTEGRATED SCHOOL, MEYCAUAYAN, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱30M | 100% | Medium risk35 | —-0.048 |
| 281 | 24CD0174CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY TUNGKONG MANGGA, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱29.4M | 100% | Medium risk34 | —-0.093 |
| 282 | 23CC0122CONSTRUCTION OF RIVER CONTROL PROJECT ALONG ANGAT RIVER, TIBAGAN SECTION, STA. 00+615 - STA. 00+845, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk33 | —-0.093 |
| 283 | 22CC0289CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, STA. 0+413 TO STA. 0+738, TIBAGAN SECTION, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | Medium risk33 | —-0.094 |
| 284 | 20CD0017CONSTRUCTION OF FLOOD CONTROL STRUCTURES, KAYBANBAN, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱32.6M | 100% | Medium risk32 | —-0.093 |
| 285 | 18CD0214PREVENTIVE MAINTENANCE ASPHALT OVERLAY ALONG BOCAUE SAN JOSE ROAD ROAD, K0030 + (-771) - K0030+101 | Region III | Bulacan 2nd DEO | Completed | ₱11M | 100% | Medium risk32 | —-0.101 |
| 286 | 20CD0018CONSTRUCTION OF FLOOD CONTROL STRUCTURES, KAYPIAN, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱46.5M | 100% | Medium risk32 | —-0.093 |
| 287 | 20CD0019CONSTRUCTION OF FLOOD CONTROL STRUCTURES, ALONG KAYTUTONG BRIDGE, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱30.5M | 100% | Medium risk32 | —-0.093 |
| 288 | 20CD0047CONSTRUCTION OF SLOPE PROTECTION, TOWERVILLE, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱33.9M | 100% | Medium risk32 | —-0.093 |
| 289 | 20CD0016CONSTRUCTION OF FLOOD CONTROL STRUCTURES, DULONG BAYAN, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱27.3M | 100% | Medium risk32 | —-0.093 |
| 290 | 20CD0045CONSTRUCTION OF FLOOD CONTROL STRUCTURES, PARADISE III, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱31.6M | 100% | Medium risk32 | —-0.093 |
| 291 | 18CD0006CONSTRUCTION OF FLOOD CONTROL STRUCTURES, STO. CRISTO RIVER, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱19.6M | 100% | Medium risk32 | —-0.093 |
| 292 | 19CD0213CONSTRUCTION OF FLOOD CONTROL STRUCTURES, STA. MARIA RIVER (RIGHT SIDE), STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱46.5M | 100% | Medium risk31 | —-0.093 |
| 293 | 19CA0042CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF FLOOD CONTROL PROJECT ALONG COLO RIVER BAMBAN SECTION PHASE B, HERMOSA, BATAAN | Region III | Bataan 1st DEO | Completed | ₱24.5M | 100% | Medium risk31 | —-0.090 |
| 294 | 18CD0013CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BULO RIVER (PHASE I), SAN MIGUEL, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱27.9M | 100% | Medium risk30 | —-0.093 |
| 295 | 18CA0040CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-IMPROVEMENT/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG PENTOR-BALSIK RIVER (TORRES SECTION)DINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱27.3M | 100% | Medium risk30 | —-0.090 |
| 296 | 23CC0044CONSTRUCTION OF RIVER CONTROL PROJECT ALONG ANGAT RIVER, SAN JOSE SECTION, STA. 07+950 TO STA. 08+080, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱39.2M | 100% | Low risk30 | —-0.092 |
| 297 | 21CC0191REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG ANGAT RIVER, STA. BARBARA SECTION, BALIUAG, BULACAN, STA. 0+000 TO STA. 0+238.8 | Region III | Bulacan 1st DEO | Completed | ₱18.8M | 100% | Low risk29 | —-0.094 |
| 298 | 18CD0279CONCRETING OF SITIO DALANDANAN - SITIO RICAFORT, BRGY. TUNGKONG MANGGA FMR, BRGY. TUNGKONG MANGGA, SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱6.7M | 100% | Low risk29 | —-0.045 |