298 projects on file, including joint ventures this contractor is part of.
Total projects
298
Total budget
₱17.3B
Average progress
92.6%
Completion rate
80.5%
Average risk score
54.4
Medium risk on average, out of 100
Flagged as unusual
11
3.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 124 | ₱7.3B | 52.4 | 6 | 92.9% |
| Region IV-A | 121 | ₱6.8B | 56.2 | 2 | 95.4% |
| National Capital Region | 49 | ₱2.7B | 53.5 | 1 | 88.1% |
| Central Office | 3 | ₱422.5M | 73.4 | 1 | 66.7% |
| Region II | 1 | ₱71.3M | 70.1 | 1 | 2.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 187 | ₱11.2B | 53.0 | 6 | 95.9% |
| Roads | 67 | ₱3.8B | 55.3 | 2 | 84.7% |
| Buildings and Facilities | 20 | ₱949.1M | 51.1 | 0 | 93.7% |
| OTHER | 16 | ₱1B | 70.0 | 3 | 89.8% |
| Bridges | 5 | ₱159.5M | 47.4 | 0 | 80.0% |
| GAA 2025 OO-2 | 1 | ₱93.6M | 93.1 | 0 | 91.2% |
| GAA 2025 OO-1 | 1 | ₱30.7M | 89.3 | 0 | 69.7% |
| Water Provision and Storage | 1 | ₱9.6M | 36.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CD0197CONSTRUCTION OF VALENZUELA - OBANDO - MEYCAUAYAN (VOM) FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER, STA. 5+750 - STA. 6+100, BARANGAY SALUYSOY, MEYCAUAYAN CITY, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 91% | High risk93 | —-0.017 |
| 25OH0066ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION- RECONSTRUCTION- UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS-PRES. DIOSDADO MACAPAGAL BLVD. - (S04019LZ) CHAINAGE 000 - CHAINAGE 278 | National Capital Region | South Manila DEO | On-Going | ₱30.7M | 70% | High risk89 | —-0.011 |
| 24CC0027CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BOCAUE RIVER, BARANGAY BAMBANG, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 24CC0026CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BOCAUE RIVER (PHASE II), BARANGAY BAMBANG, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.051 |
| 25CD0223CONCRETING OF BRGY. STO. CRISTO FMR, BRGY. STO. CRISTO, SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱28.9M | 0% | High risk79 | Flagged0.060 |
| 25DF0117ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROG CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS & PRINCIPAL RIVERS CONST OF REVETMENT ALONG ILANG-ILANG RIVER BRGY. SAN FRANCISCO, GEN. | Region IV-A | Cavite 1st DEO | On-Going | ₱93.6M | 45% | High risk79 | —-0.008 |
| 24CD0251CONSTRUCTION OF MULTI - PURPOSE BUILDING (GAD BUILDING), BARANGAY POBLACION, SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱96M | 100% | High risk79 | —-0.030 |
| 24CC0659CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, BARANGAY MALIBONG BATA (PUROK 3), PANDI, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 7% | High risk78 | Flagged0.048 |
| 23CC0564CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. TIKAY, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 86% | High risk77 | Flagged0.033 |
| 24CC0663CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG HALANG RIVER AT PARONG PARONG, BARANGAY SAN PEDRO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.4M | 92% | High risk77 | Flagged0.026 |
| 23CC0517CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. NAMAYAN, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 73% | High risk77 | Flagged0.035 |
| 21O00087CONSTRUCTION OF REVETMENT ALONG MARIBLO CREEK, STA. 0+010.000 TO STA. 0+524.458 (LEFT AND RIGHT RIVER BANK), QUEZON CITY | Central Office | Flood Control Management Cluster | Completed | ₱195M | 100% | High risk76 | —-0.025 |
| 25CD0048CONSTRUCTION OF MUZON - GAYA-GAYA BY-PASS ROAD, PHASE VI, CITY OF SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱93.6M | 0% | High risk76 | —-0.008 |
| 24CD0151CONSTRUCTION OF BYPASS (ALTERNATE) ROAD, BARANGAY GAYA-GAYA (PHASE IV), SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱95M | 100% | High risk76 | —-0.056 |
| 25CC0051CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY DAUNGAN (PUROK 2), GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱78.7M | 78% | High risk76 | —-0.022 |
| 24CC0191CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE, BARANGAY SAN MIGUEL (PUROK 7 TO PUROK 8), HAGONOY, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.058 |
| 23CC0522CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. SANTO ROSARIO, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱64.8M | 65% | High risk76 | Flagged0.041 |
| 25CC0312CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY SAN AGUSTIN (PARONG PARONG), HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.3M | 92% | High risk76 | —-0.028 |
| 25CC0076CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY IBA-IBAYO (PUROK 1 TO PUROK 2), HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.4M | 90% | High risk76 | —-0.028 |
| 25CC0081CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER AT BARANGAY SANTA LUCIA (PUROK 5 TO PUROK 6), CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱82M | 89% | High risk76 | —-0.026 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CD0223CONCRETING OF BRGY. STO. CRISTO FMR, BRGY. STO. CRISTO, SAN JOSE DEL MONTE, BULACAN | Region III | Bulacan 2nd DEO | On-Going | ₱28.9M | 0% | High risk79 | Flagged0.060 |
| 24CC0659CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, BARANGAY MALIBONG BATA (PUROK 3), PANDI, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 7% | High risk78 | Flagged0.048 |
| 23CC0522CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. SANTO ROSARIO, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱64.8M | 65% | High risk76 | Flagged0.041 |
| 23CC0517CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. NAMAYAN, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 73% | High risk77 | Flagged0.035 |
| 23CC0564CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. TIKAY, MALOLOS CITY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱72.4M | 86% | High risk77 | Flagged0.033 |
| 24CC0663CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG HALANG RIVER AT PARONG PARONG, BARANGAY SAN PEDRO, HAGONOY, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱69.4M | 92% | High risk77 | Flagged0.026 |
| 24DF0303CONVERGENCE AND SPECIAL SUPPORT PROGRAMSPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239INSTALLATION OF ROADWAY LIGHTING STRUCTURES ALONG TANZA-TMC-INDANG ROAD, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱47.8M | 100% | High risk69 | Flagged0.015 |
| 21O00088CONSTRUCTION OF REVETMENT ALONG DARIO CREEK, STA. 0+020.000 TO STA. 0+351.894 (LEFT AND RIGHT RIVER BANK), QUEZON CITY | Central Office | Flood Control Management Cluster | On-Going | ₱135.7M | 0% | High risk75 | Flagged0.015 |
| 24DF0024ORG OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMSCONST OF REVETMENT ALONG ILANG-ILANG RIVER, BUENAVISTA, PHASE IV, GEN TRIAS,CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱86.9M | 69% | High risk71 | Flagged0.009 |
| 24OH0055ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM-OFF-CARRIAGEWAY IMPROVEMENT-PRIMARY ROADS-CONSTRUCTION OF LOADING AND UNLOADING BAY AT ROXAS BOULEVARD CORNER EDSA, PASAY CITY PHASE II | National Capital Region | South Manila DEO | On-Going | ₱94.5M | 82% | High risk68 | Flagged0.006 |
| 25BH0242SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD, SAN ISIDRO - ECHAGUE ROAD, SAN ISIDRO AND ECHAGUE, ISABE | Region II | Isabela 4th DEO | On-Going | ₱71.3M | 3% | High risk70 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 17CD0007CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MARILAO RIVER, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱37.6M | 100% | High risk69 | —-0.062 |
| 52 | 17CD0006CONSTRUCTION OF FLOOD CONTROL STRUCTURES STO. CRISTO RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱46.4M | 100% | High risk69 | —-0.062 |
| 53 | 17CD0003CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG NCR/BULACAN BDRY.-BIGTE - IPO DAM ROAD, STO CRISTO RIVER, SAN JOSE DEL MONTE CITY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱46.4M | 100% | High risk69 | —-0.062 |
| 54 | 24DF0287REPAIR OF DAMAGED REVETMENT ALONG SAN JUAN RIVER, BRGY. SAN JUAN II, NOVELETA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱45.8M | 100% | High risk68 | —-0.058 |
| 55 | 17DF0021MFO2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OFFLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OFREVETMENT ALONG CAÑAS RIVER, BRGY. PINAGTIPUNAN SECTION ANDILANG-ILANG RIVER, BRGY. TAPIA SECTION, CAVITE 6TH LD | Region IV-A | Cavite 1st DEO | Completed | ₱39.2M | 100% | High risk68 | —-0.060 |
| 56 | 24DF0289REHABILITATION/REPAIR OF DAMAGED REVETMENT ALONG IMUS RIVER, BRGY. ALAPAN II-B, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱33.8M | 100% | High risk68 | —-0.060 |
| 57 | 24DF0290REHABILITATION/REPAIR OF DAMAGED SLOPE PROTECTION, BRGY. HUGO PEREZ, TRECE MARTIRES CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱38.2M | 77% | High risk68 | —-0.017 |
| 58 | 24DF0284CAPITAL OUTLAY -REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIESREPAIR OF DAMAGED REVETMENT ALONG CANAS RIVER, BRGY, BUNGA, TANZA, CAVITE WHICH WAS DAMAGED BY TYPHOON 'AGHON' | Region IV-A | Cavite 1st DEO | Completed | ₱41.7M | 100% | High risk68 | —-0.059 |
| 59 | 22DF0386REHAB. OF DISASTER-RELATED INFRASTRUCTURE & OTHER FACILITIES- RELEASE OF FUND FOR THE RECONST./ REHAB. OF REVETMENT ALONG ILANG ILANG RIVER BRGY. PRINZA, GEN./ TRIAS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱9.9M | 100% | High risk68 | —-0.056 |
| 60 | 17CA0045CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-IMPROVEMENT OF ABUCAY RIVER, ABUCAY, BATAAN | Region III | Bataan 1st DEO | Completed | ₱18.2M | 100% | High risk68 | —-0.061 |
| 61 | 21DF0067LOCAL PROGRAMCONST. / REPAIR / REHAB. / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTSLOCAL ROADS AND BRIDGESLOCAL ROADSREHABILITATION OF SITIO ELANG ROAD, GENERAL TRIAS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱42.5M | 100% | High risk68 | —-0.041 |
| 62 | 17CA0048CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE-SYSTEMS-CONSTRUCTION/IMPROVEMENT OF PENTOR-BALSIK RIVER (BALSIK SECTION)HERMOSA, BATAAN | Region III | Bataan 1st DEO | Completed | ₱18.2M | 100% | High risk68 | —-0.061 |
| 63 | 24OH0055ORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM-OFF-CARRIAGEWAY IMPROVEMENT-PRIMARY ROADS-CONSTRUCTION OF LOADING AND UNLOADING BAY AT ROXAS BOULEVARD CORNER EDSA, PASAY CITY PHASE II | National Capital Region | South Manila DEO | On-Going | ₱94.5M | 82% | High risk68 | Flagged0.006 |
| 64 | 19DF0023ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES, ALANG-ILANG BRIDGE (B0305LZ) ALONG DASMARIÑAS-TRECE MARTIRES CITY-NAIC ROAD, GEN. TRIAS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱14M | 100% | High risk68 | —-0.042 |
| 65 | 17DF0075MFO2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOODMITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF REVETMENT ALONG IMUS RIVER, BRGY. TANZANG LUMA, PHASE 3, STA. 7+372.00 TO STA. 7+569.20, IMUS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱29M | 100% | High risk68 | —-0.060 |
| 66 | 17DF0002MFO2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINA | Region IV-A | Cavite 1st DEO | Completed | ₱29.4M | 100% | High risk68 | —-0.059 |
| 67 | 20DQ0031ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT ALONG CARMONA RIVER, BRGY. MADUYA, EAST SIDE | Region IV-A | Cavite 3rd DEO | Completed | ₱45.9M | 100% | High risk68 | —-0.059 |
| 68 | 17DQ0001MFO 2 FLOOD MANAGEMENT SERVICES, CONSTRUCTION, MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL ALONG SORO-SORO RIVER, BRGY. CABILANG BAYBAY, CARMONA, CAVITE, 5TH LEGISLATIVE DISTRICT | Region IV-A | Cavite 3rd DEO | Completed | ₱19.5M | 100% | High risk67 | —-0.061 |
| 69 | 17DQ0020MFO 2 - FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL / RETAINING WALL /REVETMENT AT WEST SIDE ALONG SORO-SORO RIVER, BRGY. MADUYA, CARMONA, CAVITE, 5TH LD | Region IV-A | Cavite 3rd DEO | Completed | ₱18.6M | 100% | High risk67 | —-0.061 |
| 70 | 18DF0039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE, SECONDARY ROADS: DASMARIÑASTRECE MARTIRES CITY-NAIC RD - K0051+000 - K0051+602 AND NOVELETA-NAIC-TAGAYTAY RD- K0031+586 - K0032+20 | Region IV-A | Cavite 1st DEO | Completed | ₱24.3M | 100% | High risk67 | —-0.040 |
| 71 | 17DF0039MFO1 NATIONAL ROAD NETWORK SERVICES - NETWORK DEVELOPMENT, IMPROVEMENT/WIDENING OF NATIONAL ROADS - TERTIARY ROADS, NOVELETADIVERSION ROAD, K0025 + -021 - K0025 + 874, K0025+906 - K0026+031 | Region IV-A | Cavite 1st DEO | Completed | ₱21.4M | 100% | High risk67 | —-0.073 |
| 72 | 17DF0043MFO1 NATIONAL ROAD NETWORK SERVICES - ASSETS PRESERVATION OF NATIONAL ROADS - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS, TEJERO-GEN. TRIAS-AMADEO-TAGAYTAYROAD, K0049+110 - K0053+593 | Region IV-A | Cavite 1st DEO | Completed | ₱44.1M | 100% | High risk67 | —-0.072 |
| 73 | 17DF0042MFO1 NATIONAL ROAD NETWORK SERVICES - ASSETS PRESERVATION OF NATIONAL ROADS - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, CAVITE-BATANGAS ROAD K0019+000 - K0021+000, K0023+200 - K0025+709 | Region IV-A | Cavite 1st DEO | Completed | ₱41.9M | 100% | High risk67 | —-0.072 |
| 74 | 23CD0209REHABILITATION OF FLOOD CONTROL STRUCTURE AT PANDAYAN CREEK (MANZANO SECTION), BARANGAY PANDAYAN, MARILAO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱44.4M | 100% | High risk67 | —-0.008 |
| 75 | 17DF0027MFO1 NATIONAL ROAD NETWORK SERVICES - ASSET PRESERVATION OF NATIONAL ROADS, PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM-4), TERTIARY ROADS, CRISANTO M. DE LOS REYES AVE. - K0055+592 - K0056+000; K | Region IV-A | Cavite 1st DEO | Completed | ₱10.4M | 100% | High risk67 | —-0.072 |