Contractor dossier
80 projects on file, including joint ventures this contractor is part of.
Total projects
80
Total budget
₱2.4B
Average progress
96.6%
Completion rate
78.8%
Average risk score
46.1
Medium risk on average, out of 100
Flagged as unusual
8
10.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 41 | ₱1.4B | 47.8 | 4 | 98.1% |
| Region III | 29 | ₱721.7M | 44.4 | 4 | 93.4% |
| National Capital Region | 7 | ₱49.6M | 40.0 | 0 | 100.0% |
| Region IV-A | 3 | ₱221.2M | 54.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 46 | ₱1.5B | 43.4 | 1 | 99.7% |
| Buildings and Facilities | 17 | ₱170.9M | 34.3 | 0 | 99.4% |
| GAA 2025 SSP | 5 | ₱96M | 94.1 | 3 | 84.3% |
| OTHER | 3 | ₱150.7M | 71.3 | 2 | 66.5% |
| Flood Control and Drainage | 3 | ₱48.6M | 34.5 | 0 | 100.0% |
| Bridges | 3 | ₱15.8M | 33.4 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱379.6M | 93.5 | 2 | 66.1% |
| Water Provision and Storage | 1 | ₱9.7M | 33.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25L00052PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K1403+897 - K1405+713, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱43.4M | 99% | High risk95 | Flagged0.008 |
| 25CF0101SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SCHOOL BUILDING), IMBUNIA ELEMENTARY SCHOOL, BARANGAY IMBUNIA, JAEN, NUE | Region III | Nueva Ecija 2nd DEO | On-Going | ₱16.6M | 77% | High risk94 | Flagged0.002 |
| 25LD0202PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT.)-K1579+093-K1580+625, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱95.5M | 36% | High risk94 | Flagged0.025 |
| 25CF0127BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD AT CARANGLAAN, BRGY. CARLOS, PEÑARANDA, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱21.7M | 59% | High risk94 | Flagged0.010 |
| 25CF0114BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAY CARE CENTER), BARANGAY KAPALANGAN, GAPAN CITY, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱6.4M | 86% | High risk94 | —-0.003 |
| 25CF0126BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY MARAWA, JAEN, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱7.9M | 100% | High risk94 | —-0.006 |
| 25C00476ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱284.1M | 97% | High risk93 | Flagged0.018 |
| 23CF0097CONCRETING OF BRGY. STO. CRISTO FMR, BRGY. STO. CRISTO, SAN ISIDRO, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱11.7M | 0% | High risk83 | Flagged0.069 |
| 24LA0100CONSTRUCTION OF ROAD, BARANGAY ELIZALDE - BARANGAY NEW BARILI - BARANGAY GOLDEN VALLEY, MABINI, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱66.8M | 99% | High risk77 | Flagged0.013 |
| 24LI0128PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-MONTEVISTA-COMPOSTELA-MATI-BDRY. RD-K1480+000-K1483+905, K1484+940-K1486+017 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱95.5M | 100% | High risk65 | Flagged0.023 |
| 19L00023CONSTRUCTION OF CONCRETE ROAD-FATIMA-MALABOG ROAD (MALABOG-GUMITAN), PACKAGE A, DAVAO CITY | Region XI | Region XI | Completed | ₱99.8M | 100% | High risk62 | —-0.077 |
| 19LA0356REPAIR/REHABILITATION/IMPROVEMENT OF ROAD (ASPHALT OVERLAY) ALONG NABUNTURAN-MARAGUSAN ROAD, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.068 |
| 19L00089CONSTRUCTION OF CONCRETE ROAD-MONTEVISTA-DNAS ROAD (DNAS-LAAK), SECTION 1, COMPOSTELA VALLEY | Region XI | Region XI | Completed | ₱118.9M | 100% | High risk60 | —-0.068 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23CF0097CONCRETING OF BRGY. STO. CRISTO FMR, BRGY. STO. CRISTO, SAN ISIDRO, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱11.7M | 0% | High risk83 | Flagged0.069 |
| 25LD0202PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT.)-K1579+093-K1580+625, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱95.5M | 36% | High risk94 | Flagged0.025 |
| 24LI0128PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-MONTEVISTA-COMPOSTELA-MATI-BDRY. RD-K1480+000-K1483+905, K1484+940-K1486+017 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱95.5M | 100% | High risk65 | Flagged0.023 |
| 25C00476ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱284.1M | 97% | High risk93 | Flagged0.018 |
| 24LA0100CONSTRUCTION OF ROAD, BARANGAY ELIZALDE - BARANGAY NEW BARILI - BARANGAY GOLDEN VALLEY, MABINI, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱66.8M | 99% | High risk77 | Flagged0.013 |
| 25CF0127BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD AT CARANGLAAN, BRGY. CARLOS, PEÑARANDA, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱21.7M | 59% | High risk94 | Flagged0.010 |
| 25L00052PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K1403+897 - K1405+713, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱43.4M | 99% | High risk95 | Flagged0.008 |
| 25CF0101SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SCHOOL BUILDING), IMBUNIA ELEMENTARY SCHOOL, BARANGAY IMBUNIA, JAEN, NUE | Region III | Nueva Ecija 2nd DEO | On-Going | ₱16.6M | 77% | High risk94 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25L00052PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY - K1403+897 - K1405+713, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱43.4M | 99% | High risk95 | Flagged0.008 |
| 2 | 25CF0101SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM - CONSTRUCTION OF MULTI-PURPOSE BUILDING (SCHOOL BUILDING), IMBUNIA ELEMENTARY SCHOOL, BARANGAY IMBUNIA, JAEN, NUE | Region III | Nueva Ecija 2nd DEO | On-Going | ₱16.6M | 77% | High risk94 | Flagged0.002 |
| 3 | 25LD0202PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT.)-K1579+093-K1580+625, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱95.5M | 36% | High risk94 | Flagged0.025 |
| 4 | 25CF0127BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD AT CARANGLAAN, BRGY. CARLOS, PEÑARANDA, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱21.7M | 59% | High risk94 | Flagged0.010 |
| 5 | 25CF0114BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAY CARE CENTER), BARANGAY KAPALANGAN, GAPAN CITY, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱6.4M | 86% | High risk94 | —-0.003 |
| 6 | 25CF0126BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY MARAWA, JAEN, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱7.9M | 100% | High risk94 | —-0.006 |
| 7 | 25C00476ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MAHARLIKA HIGHWAY, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱284.1M | 97% | High risk93 | Flagged0.018 |
| 8 | 23CF0097CONCRETING OF BRGY. STO. CRISTO FMR, BRGY. STO. CRISTO, SAN ISIDRO, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱11.7M | 0% | High risk83 | Flagged0.069 |
| 9 | 24LA0100CONSTRUCTION OF ROAD, BARANGAY ELIZALDE - BARANGAY NEW BARILI - BARANGAY GOLDEN VALLEY, MABINI, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱66.8M | 99% | High risk77 | Flagged0.013 |
| 10 | 24LI0128PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-MONTEVISTA-COMPOSTELA-MATI-BDRY. RD-K1480+000-K1483+905, K1484+940-K1486+017 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱95.5M | 100% | High risk65 | Flagged0.023 |
| 11 | 19L00023CONSTRUCTION OF CONCRETE ROAD-FATIMA-MALABOG ROAD (MALABOG-GUMITAN), PACKAGE A, DAVAO CITY | Region XI | Region XI | Completed | ₱99.8M | 100% | High risk62 | —-0.077 |
| 12 | 19LA0356REPAIR/REHABILITATION/IMPROVEMENT OF ROAD (ASPHALT OVERLAY) ALONG NABUNTURAN-MARAGUSAN ROAD, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.068 |
| 13 | 19L00089CONSTRUCTION OF CONCRETE ROAD-MONTEVISTA-DNAS ROAD (DNAS-LAAK), SECTION 1, COMPOSTELA VALLEY | Region XI | Region XI | Completed | ₱118.9M | 100% | High risk60 | —-0.068 |
| 14 | 19D00001FY 2019 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM ROAD WIDENING/ SECONDARY ROADS DIOKNO HIGHWAY RD K0072+(-658) - K0072+020 - K0072+760 - K0073+44, BATANGAS | Region IV-A | Region IV-A | Completed | ₱110.8M | 100% | Medium risk60 | —-0.090 |
| 15 | 25LJ0001TAGUM - PANABO CIRCUM RD. - K1498+075 - K1499+615 | Region XI | Davao del Norte 2nd DEO | On-Going | ₱86.1M | 96% | Medium risk55 | —-0.048 |
| 16 | 19DN0008NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ANGONO-ANTIPOLO DIVERSION ROAD (ANGONO SECTTION) PACKAGE A, RIZAL, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱61.4M | 100% | Medium risk54 | —-0.101 |
| 17 | 19LA0159CONSTRUCTION OF REVETMENT ALONG MANAT RIVER LEADING TO AGUSAN RIVER, BRGY. OLAYCON, MONKAYO, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱72.2M | 100% | Medium risk54 | —-0.038 |
| 18 | 20L00072CONSTRUCTION OF GRAVEL ROAD - CARMEN - TAGUM CITY COASTAL ROAD (CARMEN SECTION), DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱54.9M | 100% | Medium risk53 | —-0.085 |
| 19 | 24LG0117PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - PRES. DIOSDADO P.MACAPAGAL NAT'L HI-WAY - K1732 + 150 - K1733 + 000 | Region XI | Davao Oriental 2nd DEO | Completed | ₱47.7M | 100% | Medium risk53 | —-0.015 |
| 20 | 24LG0025PREVENTIVE MAINTENANCE OF ROAD:ASPHALT OVERLAY PRES DIOSDADO P. MACAPAGAL NATL HI-WAY-K1750+142-K1751+000, LUPON, DAVAO ORIENTAL | Region XI | Davao Oriental 2nd DEO | Completed | ₱47.8M | 100% | Medium risk52 | —-0.079 |
| 21 | 19DF0123LOCALPROGRAM -CONSTRUCTION/REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS - ROAD WIDENING/CONCRETING OF TANZA, TRECE MARTIRES CITY ROAD, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.103 |
| 22 | 24L00036PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAANG MAHARLIKA (MN) (S00126MN) - K1420+567-K1420+987, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱47.7M | 99% | Medium risk50 | —-0.050 |
| 23 | 20LC0008SURIGAO-DAVAO COASTAL ROAD K1826+683.72 | Region XI | Davao del Norte DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.085 |
| 24 | 20LA0180ROAD CONCRETING PROJECT FROM TIBAGON-DIAT IN PANTUKAN TO MASCAREG IN MABINI, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱39.1M | 100% | Medium risk47 | —-0.088 |
| 25 | 21O00082RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES QUEZON BR. (B03195LZ) ALONG QUEZON BLVD EXTN | National Capital Region | National Capital Region | Completed | ₱8.7M | 100% | Medium risk47 | —-0.066 |