Contractor dossier
81 projects on file, including joint ventures this contractor is part of.
Total projects
81
Total budget
₱2.2B
Average progress
82.5%
Completion rate
67.9%
Below 70%
Average risk score
44.9
Medium risk on average, out of 100
Flagged as unusual
6
7.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 79 | ₱2.2B | 45.1 | 6 | 84.6% |
| Region III | 2 | ₱45.1M | 36.2 | 0 | 2.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 48 | ₱1.4B | 46.9 | 2 | 86.4% |
| Buildings and Facilities | 20 | ₱499.7M | 39.0 | 3 | 74.0% |
| Flood Control and Drainage | 7 | ₱206.4M | 42.7 | 0 | 86.4% |
| Water Provision and Storage | 3 | ₱13.6M | 39.7 | 1 | 66.7% |
| Bridges | 2 | ₱62.8M | 48.0 | 0 | 87.8% |
| GAA 2025 OO-2 | 1 | ₱47.5M | 91.1 | 0 | 77.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DQ0030CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CARMONA RIVER (UPSTREAM) AT BARANGAY LANTIC, CARMONA, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱47.5M | 77% | High risk91 | —-0.027 |
| 25DF0014ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE & RELIABLE NAT'L RD SYSTEM ASSET PRESERVATION PROG REHAB/ RECONST/ UPGRADING OF DAMAGED PAVED RDS - SECONDARY RDS CAVITE-BATANGAS RD - K0025 + 000 - K0025 + 195, K0025 + 220 - K0025 + 715, K0025 + 780 - K0026 + 162 | Region IV-A | Cavite 1st DEO | On-Going | ₱50.4M | 29% | High risk70 | —-0.027 |
| 24DE0255CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF TINGLOY CIRCUMFERENTIAL ROA | Region IV-A | Batangas 2nd DEO | On-Going | ₱95.5M | 0% | High risk65 | Flagged0.025 |
| 24DE0254CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF TINGLOY CIRCUMFERENTIAL RO | Region IV-A | Batangas 2nd DEO | On-Going | ₱95.5M | 0% | High risk65 | Flagged0.024 |
| 23D00153CONSTRUCTION OF MULTI - PURPOSE BUILDING (CITY HALL), LIPA CITY, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱198M | 26% | High risk65 | Flagged0.002 |
| 24DE0109ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL AT BRGY. SIMLONG, BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 25DE0158CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, MALIMATOC I - MALIMAT | Region IV-A | Batangas 2nd DEO | On-Going | ₱112.3M | 3% | High risk60 | —-0.032 |
| 23DE0109CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD SLOPE PROTECTION STRUC | Region IV-A | Batangas 2nd DEO | Completed | ₱111M | 100% | High risk60 | —-0.093 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DE0255CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF TINGLOY CIRCUMFERENTIAL ROA | Region IV-A | Batangas 2nd DEO | On-Going | ₱95.5M | 0% | High risk65 | Flagged0.025 |
| 24DE0254CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF TINGLOY CIRCUMFERENTIAL RO | Region IV-A | Batangas 2nd DEO | On-Going | ₱95.5M | 0% | High risk65 | Flagged0.024 |
| 24DE0192CY 2024 BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 4STY20CL, BAUAN TECHNICAL INTEGRATED HIGH SCHOOL, BAUAN, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱57.8M | 38% | Medium risk54 | Flagged0.015 |
| 24DE0248CLUSTER - CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: 1. CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY ALALUM, SAN PASCUAL, BATANGAS (PHASE | Region IV-A | Batangas 2nd DEO | On-Going | ₱3.8M | 0% | Low risk22 | Flagged0.013 |
| 23D00153CONSTRUCTION OF MULTI - PURPOSE BUILDING (CITY HALL), LIPA CITY, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱198M | 26% | High risk65 | Flagged0.002 |
| 24DE0115CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS, WATER SUPPLY SYSTEM, CONSTRUCTION OF WATER SUPPLY SYSTEM, SAN TEODORO, MABINI, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱6.9M | 0% | Medium risk48 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25DQ0030CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CARMONA RIVER (UPSTREAM) AT BARANGAY LANTIC, CARMONA, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱47.5M | 77% | High risk91 | —-0.027 |
| 2 | 25DF0014ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE & RELIABLE NAT'L RD SYSTEM ASSET PRESERVATION PROG REHAB/ RECONST/ UPGRADING OF DAMAGED PAVED RDS - SECONDARY RDS CAVITE-BATANGAS RD - K0025 + 000 - K0025 + 195, K0025 + 220 - K0025 + 715, K0025 + 780 - K0026 + 162 | Region IV-A | Cavite 1st DEO | On-Going | ₱50.4M | 29% | High risk70 | —-0.027 |
| 3 | 24DE0255CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF TINGLOY CIRCUMFERENTIAL ROA | Region IV-A | Batangas 2nd DEO | On-Going | ₱95.5M | 0% | High risk65 | Flagged0.025 |
| 4 | 24DE0254CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF TINGLOY CIRCUMFERENTIAL RO | Region IV-A | Batangas 2nd DEO | On-Going | ₱95.5M | 0% | High risk65 | Flagged0.024 |
| 5 | 23D00153CONSTRUCTION OF MULTI - PURPOSE BUILDING (CITY HALL), LIPA CITY, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱198M | 26% | High risk65 | Flagged0.002 |
| 6 | 24DE0109ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL AT BRGY. SIMLONG, BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 7 | 25DE0158CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, MALIMATOC I - MALIMAT | Region IV-A | Batangas 2nd DEO | On-Going | ₱112.3M | 3% | High risk60 | —-0.032 |
| 8 | 23DE0109CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD SLOPE PROTECTION STRUC | Region IV-A | Batangas 2nd DEO | Completed | ₱111M | 100% | High risk60 | —-0.093 |
| 9 | 24DE0192CY 2024 BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 4STY20CL, BAUAN TECHNICAL INTEGRATED HIGH SCHOOL, BAUAN, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱57.8M | 38% | Medium risk54 | Flagged0.015 |
| 10 | 24DE0060ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, BATANGAS-TABANGAO-LOBO RD - K0136+492 - K0136+642 | Region IV-A | Batangas 2nd DEO | Completed | ₱53.1M | 100% | Medium risk52 | —-0.104 |
| 11 | 21DD0294LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF ROAD AT MABAYABAS-POBLACION, POBLACION - DAGATAN, STO. NIÑO -PINAGBAYANAN, TAYSAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱48M | 100% | Medium risk51 | —-0.105 |
| 12 | 25DE0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, MALIMATOC II TO NAG-IBA SECTION, MABINI, BATANG | Region IV-A | Batangas 2nd DEO | On-Going | ₱48M | 6% | Medium risk51 | —-0.042 |
| 13 | 25DD0113CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF SAN JOSE - IBAAN ROAD, SAN J | Region IV-A | Batangas 4th DEO | On-Going | ₱46.8M | 68% | Medium risk51 | —-0.064 |
| 14 | 24DE0190ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - TERTIARY ROADS, BAUAN-MABINI RD - K0155+720 - K0156+235 | Region IV-A | Batangas 2nd DEO | On-Going | ₱49M | 85% | Medium risk51 | —-0.063 |
| 15 | 24DE0070ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINK/S NEW ROADS, TINGLOY CIRCUMFERENTIAL ROAD, TINGLOY, BATANGAS SECTION A-7 | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.104 |
| 16 | 23DC0102CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTIPURPOSE BUILDING (COLEGIO DE LAUREL), LAUREL, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱24.8M | 100% | Medium risk50 | —-0.102 |
| 17 | 24DE0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM, CONSTRUCTION OF SOCO BLDG., CAMP GEN MIGUEL MALVAR, KUMINTANG ILAYA, BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱24.8M | 100% | Medium risk50 | —-0.102 |
| 18 | 24DE0116CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COOPERATIVE UNION OF BATANGAS BUILDING), CAPITOL BUILDING, BARANGAY KUMINTA | Region IV-A | Batangas 2nd DEO | On-Going | ₱19.8M | 25% | Medium risk50 | —-0.032 |
| 19 | 22DD0116CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MPB IN BRGY. BUKAL, TAYSAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk50 | —-0.104 |
| 20 | 22DD0206CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III), CONSTRUCTION OF WATER SUPPLY SYSTEM, BARANGAY BANAY-BANAY 1, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱4.8M | 100% | Medium risk48 | —-0.069 |
| 21 | 22DD0322CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MAUGAT WEST, PADRE GARCIA, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱7.2M | 100% | Medium risk48 | —-0.106 |
| 22 | 24DE0071CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF RESPLANDOR - MALAKING POOK | Region IV-A | Batangas 2nd DEO | Completed | ₱34.3M | 100% | Medium risk48 | —-0.064 |
| 23 | 24DE0087CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BRIDGE, BRGY. DUMANTAY, BATANGAS CITY | Region IV-A | Batangas 2nd DEO | On-Going | ₱28.5M | 76% | Medium risk48 | —-0.024 |
| 24 | 24DE0115CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS, WATER SUPPLY SYSTEM, CONSTRUCTION OF WATER SUPPLY SYSTEM, SAN TEODORO, MABINI, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱6.9M | 0% | Medium risk48 | Flagged0.001 |
| 25 | 24DD0243CONSTRUCTION OF 3STY9CL, MARCOS ESPEJO INTEGRATED SCHOOL, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱37.6M | 99% | Medium risk48 | —-0.016 |