Contractor dossier
24 projects on file, including joint ventures this contractor is part of.
Total projects
24
Total budget
₱1.7B
Average progress
99.5%
Completion rate
87.5%
Average risk score
54.8
Medium risk on average, out of 100
Flagged as unusual
1
4.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 24 | ₱1.7B | 54.8 | 1 | 99.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 17 | ₱1.3B | 55.9 | 0 | 99.3% |
| Flood Control and Drainage | 3 | ₱121.9M | 53.0 | 0 | 100.0% |
| OTHER | 1 | ₱144.7M | 72.9 | 1 | 100.0% |
| Bridges, Roads | 1 | ₱99.3M | 62.0 | 0 | 100.0% |
| Bridges | 1 | ₱57.9M | 56.1 | 0 | 100.0% |
| Buildings and Facilities | 1 | ₱3.1M | 14.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17P00003ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) APAYAO - ILOCOS NORTE ROAD, K0728+504-K0728+756, K0730+376-K0731+109, K0731+589-K0734+354 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.7M | 100% | High risk73 | Flagged0.003 |
| 17P00029ASSET PRESERVATION OF NATIONAL ROAD - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, BAGUIO - BONTOC ROAD, K0281+700-K0281+750, K0282+850-K0282+900, K0292+200-K0292+275, K0281+600-K0281+622, K0306+000-K0306+02 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱107.2M | 100% | High risk63 | —-0.040 |
| 18P00038CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, TIMBAK CAVES ROAD LEADING TO TIMBAK CAVES AND MUMMY OF APO ANNO, INCL. BRIDGE, ATOK/KABAYAN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱99.3M | 100% | High risk62 | —-0.040 |
| 21P00063LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES / FACILITIES - CONSTRUCTION OF AMPUSONGAN FLOOD CONTROLBAKUN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | High risk61 | —-0.049 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17P00003ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) APAYAO - ILOCOS NORTE ROAD, K0728+504-K0728+756, K0730+376-K0731+109, K0731+589-K0734+354 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.7M | 100% | High risk73 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 17P00003ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) APAYAO - ILOCOS NORTE ROAD, K0728+504-K0728+756, K0730+376-K0731+109, K0731+589-K0734+354 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱144.7M | 100% | High risk73 | Flagged0.003 |
| 2 | 17P00029ASSET PRESERVATION OF NATIONAL ROAD - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, BAGUIO - BONTOC ROAD, K0281+700-K0281+750, K0282+850-K0282+900, K0292+200-K0292+275, K0281+600-K0281+622, K0306+000-K0306+02 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱107.2M | 100% | High risk63 | —-0.040 |
| 3 | 18P00038CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS, TIMBAK CAVES ROAD LEADING TO TIMBAK CAVES AND MUMMY OF APO ANNO, INCL. BRIDGE, ATOK/KABAYAN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱99.3M | 100% | High risk62 | —-0.040 |
| 4 | 21P00063LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES / FACILITIES - CONSTRUCTION OF AMPUSONGAN FLOOD CONTROLBAKUN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | High risk61 | —-0.049 |
| 5 | 24PC0002ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - PIDDIG-CARASI-CALANASAN ROAD (CALANASAN SIDE), PACKAGE 2, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱102.4M | 96% | Medium risk60 | —-0.033 |
| 6 | 24PC0023OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - PIDDIG-CARASI-CALANASAN ROAD (CALANASAN SIDE), PACKAGE 1, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱56.2M | 96% | Medium risk59 | —-0.038 |
| 7 | 18P00030ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT- SECONDARY ROADS CONNER-KABUGAO RD K0566+411 - K0570+000, K0570+360 - K0571+004, K0576+720 - K0579+000, K0580+600 - K0581+562, K0583+ | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱115.9M | 100% | Medium risk59 | —-0.062 |
| 8 | 18P00009ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - PAVING OF UNPAVED ROADS (TERTIARY ROADS) APAYAO-ILOCOS NORTE RD, K0739+044 - K0742+620 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱150.5M | 100% | Medium risk58 | —-0.057 |
| 9 | 21P00061ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS BAGUIO - ITOGON ROADKO260+800 - KO260+954ITOGON, | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱193M | 100% | Medium risk58 | —-0.046 |
| 10 | 20P00005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, TALOY NORTE JCT.-SAN PASCUAL BRGY. HALL (SECTION 7) | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱142M | 100% | Medium risk58 | —-0.058 |
| 11 | 19PE0029CONSTRUCTION OF MISSING LINKS / NEW ROADS: CONSTRUCTION OF CONCRETE ROAD - SPECIFIC LOCATIONS ALONG BAGUIO-LA TRINIDAD-ITOGON- SABLAN-TUBA & TUBLAY (BLISTT), TALOY NORTE JCT.- SAN PASCUAL BARANGAY HALL JCT. (SECTION 7 OF BLISTT OUTER RING CIRCUMFERENTIAL | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱93.8M | 100% | Medium risk57 | —-0.071 |
| 12 | 20P00013ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROADS CLAVERIA - CALANASAN - KABUGAO ROADKO703+100 - KO704+260KO704+910 - KO706+564 | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱107.7M | 100% | Medium risk57 | —-0.062 |
| 13 | 22PC0023NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS PIDDIG-CARASI-CALANASAN ROAD (CALANASAN SIDE), MALUNGOG BRIDGE, APAYAO-CONSTRUCTION OF STEEL BRIDGE | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱57.9M | 100% | Medium risk56 | —-0.033 |
| 14 | 24PC0053OO 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS - PIDDIG-CARASI-CALANASAN ROAD (CALANASAN SIDE), PACKAGE 4, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱10.3M | 96% | Medium risk56 | —-0.042 |
| 15 | 22PC0016NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS PIDDIG-CARASI-CALANASAN ROAD (CALANASAN SIDE), PACKAGE 1, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱47M | 100% | Medium risk55 | —-0.066 |
| 16 | 21PC0012NETWORK DEVELOPMENT PROGRAM-PAVING OF UNPAVED ROADS-CLAVERIA-CALANASAN KABUGAO ROAD K0706+564-K0707+288 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱25.8M | 100% | Medium risk54 | —-0.077 |
| 17 | 22PC0035ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS-PIDDIG CARASI-CALANASAN ROAD (CALANASAN SIDE), PACKAGE 2, APAYAO-CONSTRUCTION OF CONCRETE ROAD | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱19.6M | 100% | Medium risk54 | —-0.074 |
| 18 | 19PC0032CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS, CONSTRUCTION OF ABBIL FLOOD CONTROL, APAYAO, NAMALTUGAN, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱16.2M | 100% | Medium risk53 | —-0.059 |
| 19 | 23PC0002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/NEW ROADS - PIDDIG - CARASI - CALANASAN ROAD (CALANASAN SIDE), PACKAGE 2, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱46.4M | 100% | Medium risk53 | —-0.073 |
| 20 | 19PC0090NETWORK DEVELOPMENT:PAVING OF UNPAVED ROADS ALONG APAYAO-ILOCOS NORTE ROAD, STA.742+620-STA.743+130, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱22.2M | 100% | Medium risk51 | —-0.075 |
| 21 | 19PC0089CONSTRUCTION OF MISSING LINKS/NEW ROADS: APAYAO-ILOCOS NORTE ROAD, CHAINAGE 0-CHAINAGE 540, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱23.5M | 100% | Medium risk51 | —-0.075 |
| 22 | 21PC0021ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILTATION/RECONSTRUCTION OF ROAD WITH SLIPS, SLOPES COLLAPSE AND LANDSLIDES-TERTIARY ROADS CLAVERIA-CALANASAN KABUGAO ROAD K0628+406-K0628+556 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱49.5M | 100% | Medium risk48 | —-0.072 |
| 23 | 18PE0039CONSTRUCTION OF FLOOD MITIGATION STRUCTURE -CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGNO RIVER BASIN EDDET - ADAOAY SECTION, STA. 018+820 - STA. 019+011, KABAYAN, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱9.2M | 100% | Medium risk44 | —-0.067 |
| 24 | 17PC0050CONSTRUCTION OF STANDARD VOCHTECH MULTI-PURPSE WORKSHOP BUILDING, EVA, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱3.1M | 100% | Low risk14 | —-0.021 |