Contractor dossier
3 projects on file, including joint ventures this contractor is part of.
Total projects
3
Total budget
₱294.4M
Average progress
100.0%
Completion rate
100.0%
Average risk score
61.8
High risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 3 | ₱294.4M | 61.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 1 | ₱144.7M | 67.5 | 0 | 100.0% |
| Roads | 1 | ₱144.7M | 62.5 | 0 | 100.0% |
| Buildings and Facilities | 1 | ₱5M | 55.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PA0025OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF POBLACION-DEET FLOOD CONTROL ALONG ABRA RIVER, TAYUM, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱144.7M | 100% | High risk68 | —-0.039 |
| 23PA0202SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING FACILITIES, CONSTRUCTION OF ROAD, ABRA-KALINGA ROAD, K0485+000-K0488+000, MALIBCONG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱144.7M | 100% | High risk63 | —-0.060 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 24PA0025OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF POBLACION-DEET FLOOD CONTROL ALONG ABRA RIVER, TAYUM, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱144.7M | 100% | High risk68 | —-0.039 |
| 2 | 23PA0202SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDING FACILITIES, CONSTRUCTION OF ROAD, ABRA-KALINGA ROAD, K0485+000-K0488+000, MALIBCONG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱144.7M | 100% | High risk63 | —-0.060 |
| 3 | 24PA0136CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZENS CENTER), BRGY. POBLACION, TAYUM, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱5M | 100% | Medium risk55 | —-0.077 |