Contractor dossier
356 projects on file, including joint ventures this contractor is part of.
Total projects
356
Total budget
₱2.8B
Average progress
97.8%
Completion rate
90.4%
Average risk score
32.5
Medium risk on average, out of 100
Flagged as unusual
19
5.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 317 | ₱2.5B | 31.4 | 18 | 97.9% |
| Region XIII | 18 | ₱195.8M | 30.3 | 0 | 100.0% |
| Region IV-A | 17 | ₱86.5M | 58.4 | 1 | 91.7% |
| Region X | 4 | ₱11.8M | 13.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 216 | ₱1.1B | 24.3 | 2 | 99.0% |
| Roads | 65 | ₱846.2M | 39.5 | 1 | 99.5% |
| Water Provision and Storage | 24 | ₱131.2M | 31.5 | 0 | 99.2% |
| Flood Control and Drainage | 22 | ₱382.9M | 39.4 | 0 | 99.5% |
| OTHER | 13 | ₱166.4M | 74.3 | 7 | 85.8% |
| GAA 2025 SSP | 11 | ₱113.3M | 93.4 | 9 | 69.9% |
| Bridges | 5 | ₱20.4M | 24.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LA0090CONSTRUCTION OF ROAD, MANANGCOL, GOLDEN VALLEY - ANITAPAN, MABINI, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱34.3M | 80% | High risk95 | Flagged0.018 |
| 25LJ0036CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY NEW PANDAN, PANABO CITY, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱12.9M | 5% | High risk95 | Flagged0.040 |
| 25LJ0136CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY JP LAUREL, PANABO, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱9.9M | 31% | High risk95 | Flagged0.029 |
| 25LJ0141CONSTRUCTION OF MULTI-PURPOSE BUILDING, NANYO, PANABO, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱13.8M | 21% | High risk95 | Flagged0.035 |
| 25LJ0037CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY GREDU, PANABO CITY, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱6.9M | 93% | High risk94 | Flagged0.011 |
| 25LJ0050CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY MABAUS AND BARANGAY LAPAZ, CARMEN, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱6.9M | 78% | High risk94 | Flagged0.019 |
| 25LJ0052CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY ESPERANZA AND BARANGAY NEW VISAYAS, SANTO TOMAS, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱6.9M | 95% | High risk94 | Flagged0.010 |
| 25LJ0048CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYM), BARANGAY BALET, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱6.9M | 66% | High risk94 | Flagged0.022 |
| 25LD0113REHABILITATION OF MPB, BURI, MATANAO, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱5M | 100% | High risk94 | Flagged0.004 |
| 25LJ0042CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAY CARE CENTER), BARANGAY LA LIBERTAD, SANTO TOMAS, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | Completed | ₱4.9M | 100% | High risk89 | —-0.023 |
| 25LJ0139CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT WITH STAGE AND BLEACHERS) IN BARANGAY SOUTHERN DAVAO, PANABO, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | Completed | ₱4.9M | 100% | High risk88 | —-0.022 |
| 25LI0047CONCRETING OF BRGY. MAGANGIT FMR (PHASE II), BRGY. MAGANGIT, NEW BATAAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱14.9M | 0% | High risk86 | Flagged0.089 |
| 25LI0046CONCRETING OF BRGY. TANDIK FMR (PHASE II), BRGY. TANDIK, MARAGUSAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱14.9M | 77% | High risk86 | Flagged0.066 |
| 25LI0049CONCRETING OF BRGY. PANANSALAN FMR (PHASE III), BRGY. PANANSALAN, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱14.9M | 92% | High risk86 | Flagged0.060 |
| 24L00300CONSTRUCTION OF 2STY4CL SCHOOL BUILDING IN MAGSAYSAY ELEMENTARY SCHOOL, BRGY. MAGSAYSAY, CARMEN, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱13.8M | 93% | High risk85 | Flagged0.055 |
| 25DF0193CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI PURPOSE BLDG. AT BRGY. ALAPAN 1C, CITY OF IMUS, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.8M | 81% | High risk76 | —-0.038 |
| 24DF0063CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY WAWA II, ROSARIO, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱4.9M | 100% | High risk75 | —-0.073 |
| 24DF0009CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAYWAWA III, ROSARIO, | Region IV-A | Cavite 1st DEO | Completed | ₱4.9M | 100% | High risk75 | —-0.074 |
| 24DF0198CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. 48M, CAVITE CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.9M | 0% | High risk75 | Flagged0.003 |
| 24DF0176CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. 49M, CAVITE CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.9M | 78% | High risk75 | —-0.025 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LI0047CONCRETING OF BRGY. MAGANGIT FMR (PHASE II), BRGY. MAGANGIT, NEW BATAAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱14.9M | 0% | High risk86 | Flagged0.089 |
| 25LI0046CONCRETING OF BRGY. TANDIK FMR (PHASE II), BRGY. TANDIK, MARAGUSAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱14.9M | 77% | High risk86 | Flagged0.066 |
| 25LI0049CONCRETING OF BRGY. PANANSALAN FMR (PHASE III), BRGY. PANANSALAN, COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱14.9M | 92% | High risk86 | Flagged0.060 |
| 24L00300CONSTRUCTION OF 2STY4CL SCHOOL BUILDING IN MAGSAYSAY ELEMENTARY SCHOOL, BRGY. MAGSAYSAY, CARMEN, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱13.8M | 93% | High risk85 | Flagged0.055 |
| 25LJ0036CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY NEW PANDAN, PANABO CITY, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱12.9M | 5% | High risk95 | Flagged0.040 |
| 25LJ0141CONSTRUCTION OF MULTI-PURPOSE BUILDING, NANYO, PANABO, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱13.8M | 21% | High risk95 | Flagged0.035 |
| 24LI0129CONSTRUCTION OF ROAD, PUROK MARANGIG SITIO NEW LEYTE- PUROK HIGH LANDER SITIO SAPAWAN, BARANGAY NEW ALBAY, MARAGUSAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱96.4M | 72% | High risk65 | Flagged0.030 |
| 25LJ0136CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY JP LAUREL, PANABO, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱9.9M | 31% | High risk95 | Flagged0.029 |
| 25LJ0048CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYM), BARANGAY BALET, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱6.9M | 66% | High risk94 | Flagged0.022 |
| 25LJ0050CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY MABAUS AND BARANGAY LAPAZ, CARMEN, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱6.9M | 78% | High risk94 | Flagged0.019 |
| 25LA0090CONSTRUCTION OF ROAD, MANANGCOL, GOLDEN VALLEY - ANITAPAN, MABINI, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱34.3M | 80% | High risk95 | Flagged0.018 |
| 25LJ0020SITIO PASOG- LICUP - TAGBITAN-AG - SITIO TAGLUNO ROAD LEADING TO PUTING BATO AND CANIBAD RESORT, BRGY. AUNDANAO, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱7.2M | 79% | High risk73 | Flagged0.012 |
| 25LJ0037CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY GREDU, PANABO CITY, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱6.9M | 93% | High risk94 | Flagged0.011 |
| 24LI0134REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY CAMANLANGAN, NEW BATAAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱6.9M | 68% | Medium risk39 | Flagged0.011 |
| 25LJ0052CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY ESPERANZA AND BARANGAY NEW VISAYAS, SANTO TOMAS, DAVAO DEL NORTE | Region XI | Davao del Norte 2nd DEO | On-Going | ₱6.9M | 95% | High risk94 | Flagged0.010 |
| 24L00258CONSTRUCTION OF MULTI-PURPOSE BUILDING AT THE MUNICIPAL CENTER, CARMEN, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱4.9M | 90% | High risk73 | Flagged0.009 |
| 24L00008OFF- CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF SIDEWALK - DAVAO-COTABATO RD (DAVAO CITY - JCT. DIGOS SECT) - K1511+(-235) - K1511+(-127), K1511+(-125)-K1511+(-085), K1511+(-061)-K1511+047,K1511+177-1511+205,K1511+213-K1511+243, K1511+287-K1511+332, K1511+5 | Region XI | Region XI | On-Going | ₱11.4M | 85% | High risk72 | Flagged0.007 |
| 25LD0113REHABILITATION OF MPB, BURI, MATANAO, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱5M | 100% | High risk94 | Flagged0.004 |
| 24DF0198CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. 48M, CAVITE CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱4.9M | 0% | High risk75 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 326 | 19LC0194IMPROVEMENT OF MULTI-PURPOSE BUILDING, SAN JOSE, SAMAL DISTRICT, ISLAND GARDEN CITY OF SAMAL,DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱1.9M | 100% | Low risk10 | —-0.087 |
| 327 | 19LA0094CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT STAGE), COMPOSTELA VALLEY STATE COLLEGE (CVSC) -MARAGUSAN BRANCH, POBLACION, MARAGUSAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.5M | 100% | Low risk10 | —-0.086 |
| 328 | 20LA0238CONSTRUCTION OF MULTI-PURPOSE BUILDING (ALIVE BUILDING), BRGY. PINDASAN ES, PINDASAN MABINI, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.5M | 100% | Low risk10 | —-0.091 |
| 329 | 20LB0146REHABILITATION OF EXISTING MULTI-PURPOSE BUILDING, BRGY. MATINA PANGI, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱989.6K | 100% | Low risk10 | —-0.089 |
| 330 | 20LB0144REHABILITATION OF EXISTING MULTI-PURPOSE BUILDING, BRGY. MAA, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱989.5K | 100% | Low risk10 | —-0.092 |
| 331 | 21LA0084REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT) BARANGAY LIBUDON, MABINI, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | Completed | ₱978.7K | 100% | Low risk10 | —-0.089 |
| 332 | 21LB0057REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY 7-A, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱1.5M | 100% | Low risk10 | —-0.092 |
| 333 | 20LB0145REHABILITATION OF EXISTING MULTI-PURPOSE BUILDING, BRGY. MATINA CROSSING, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱989.6K | 100% | Low risk10 | —-0.091 |
| 334 | 17LD0042IMPROVEMENT OF GYM, BACLAYON, MALALAG, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱1M | 100% | Low risk9 | —-0.056 |
| 335 | 17LA0131COMPLETION OF BARANGAY HALL IN BRGY. PROSPERIDAD, MUNICIPALITY OF MONTEVISTA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.2M | 100% | Low risk9 | —-0.054 |
| 336 | 17LA0157CONSTRUCTION OF MPB (EVACUATION CENTER) IN BRGY. FATIMA, MUNICIPALITY OF NEW BATAAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.5M | 100% | Low risk8 | —-0.052 |
| 337 | 17LA0161CONSTRUCTION OF BARANGAY HALL IN BRGY. BANGLASAN, MUNICIPALITY OF MONTEVISTA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.7M | 100% | Low risk8 | —-0.054 |
| 338 | 17LA0158CONSTRUCTION OF MULTI-PURPOSE BUILDING (BLEACHER) IN BRGY. CAMANSI, MUNICIPALITY OF MONTEVISTA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.5M | 100% | Low risk8 | —-0.054 |
| 339 | 17LA0100COMPLETION OF MULTI-PURPOSE BUILDING (BLEACHER) IN BRGY. GABI, MUN. OF COMPOSTELA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.5M | 100% | Low risk8 | —-0.049 |
| 340 | 17LA0099CONSTRUCTION OF MPB CONCRETE (BLEACHER) IN SAN JOSE, MUNICIPALITY OF COMPOSTELA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.5M | 100% | Low risk8 | —-0.052 |
| 341 | 17LA0156CONSTRUCTION OF MPB (TRIBAL BUILDING) IN BRGY. TANDAWAN, MUNICIPALITY OF NEW BATAAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.3M | 100% | Low risk8 | —-0.053 |
| 342 | 17LA0103COMPLETION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) IN BRGY. LAGAB, MUNICIPALITY OF COMPOSTELA, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1M | 100% | Low risk8 | —-0.052 |
| 343 | 17LC0067CONSTRUCTION OF MPB (COVERED COURT) PUROK 3C, BRGY. APOKON, TAGUM CITY, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱424.7K | 100% | Low risk8 | —-0.054 |
| 344 | 17LA0172CONSTRUCTION OF 2 (TWO) CLASSROOM CVSC @ POBLACION, LAAK, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.6M | 100% | Low risk8 | —-0.054 |
| 345 | 17LA0067CONSTRUCTION OF MPB, SENIOR CITIZENS BLDG. AT BRGY. MAGNAGA, PANTUKAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.5M | 100% | Low risk8 | —-0.057 |
| 346 | 17LA0070CONSTRUCTION/COMPLETION OF ADMINISTRATIVE BUILDING AT KOLEHIYO NG PANTUKAN, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱1.5M | 100% | Low risk8 | —-0.057 |
| 347 | 17LD0149CONSTRUCTION OF CLASSROOMS, 1STY 2CL JOSE F. LANOZA ES, MALALAG, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱2.8M | 100% | Low risk4 | —-0.017 |
| 348 | 17LH0089CONSTRUCTION OF STANDARD 1 STOREY 3 CLASSROOMS BUILDING AT TAGBAW PRIMARY SCHOOL, MARILOG DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱4.3M | 100% | Low risk4 | —-0.022 |
| 349 | 17LH0087CONSTRUCTION OF STANDARD 1 STOREY 2 CLASSROOMS BUILDING AT MALIKONGKONG ELEMENTARY SCHOOL, MARILOG DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱3M | 100% | Low risk4 | —-0.023 |
| 350 | 17LH0084CONSTRUCTION OF STANDARD 1 STOREY 2 CLASSROOMS BUILDING AT MALUAN ELEMENTARY SCHOOL, MARILOG DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱2.9M | 100% | Low risk4 | —-0.023 |