Opening the dossier…
Opening the dossier…
Contractor dossier
497 projects on file, including joint ventures this contractor is part of.
Total projects
497
Total budget
₱101.8B
Average progress
92.2%
Completion rate
64.2%
Below 70%
Average risk score
60.4
High risk on average, out of 100
Flagged as unusual
89
17.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 272 | ₱39.4B | 59.9 | 28 | 93.4% |
| Region XI | 174 | ₱43.3B | 63.2 | 54 | 92.5% |
| Region XIII | 49 | ₱8.9B | 52.8 | 6 | 85.9% |
| Central Office | 2 | ₱10.2B | 67.8 | 1 | 51.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 356 | ₱58.6B | 57.5 | 22 | 93.8% |
| Bridges, Roads | 59 | ₱14.4B | 64.0 | 21 | 93.1% |
| OTHER | 37 | ₱16.5B | 75.7 | 23 | 92.4% |
| Bridges | 36 | ₱10.6B | 59.2 | 14 | 89.6% |
| GAA 2025 OO-1 | 5 | ₱610M | 93.3 | 5 | 47.0% |
| GAA 2025 SSP | 3 | ₱874M | 95.3 | 3 | 12.2% |
| Flood Control and Drainage | 1 | ₱141.8M | 64.7 | 1 | 2.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25K00406CONSTRUCTION OF CONRETE ROAD, MAT-I - LUBILAN, NAAWAN TO MISAMIS ORIENTAL WEST DIVERSION ROAD, (OPOL TO LUGAIT), PACKAGE 8, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱238.3M | 21% | High risk96 | Flagged0.046 |
| 25N00234CONSTRUCTION OF SAN LUIS-BINICALAN-ZAMBOANGUITA ROAD, BRGY. MAHAYAHAY, SAN LUIS, AGUSAN DEL SUR (PACKAGE 3) | Region XIII | Region XIII | On-Going | ₱342.3M | 8% | High risk95 | Flagged0.061 |
| 25N00235CONSTRUCTION OF SAN LUIS-BINICALAN-ZAMBOANGUITA ROAD, BRGY. MAHAYAHAY, SAN LUIS, AGUSAN DEL SUR (PACKAGE 4) | Region XIII | Region XIII | On-Going | ₱293.4M | 8% | High risk95 | Flagged0.060 |
| 25K00163CONST. OF MISSING LINKS/NEW ROADS PUNTIAN-ARAKAN ROAD, PACKAGE 14, BUKIDNON | Region X | Region X | On-Going | ₱95.3M | 30% | High risk93 | Flagged0.016 |
| 25K00179CONSTRUCTION OF MISSING LINKS/NEW ROADS,BUKIDNON-COMPOSTELA VALLEY ROAD (BARANGAY NAMNAM, SAN FERNANDO BUKIDNON- LAAK COMPOSTELA VALLEY), PACKAGE 8, BUKIDNON | Region X | Region X | On-Going | ₱57.2M | 37% | High risk93 | Flagged0.009 |
| 25K00306CONST. OF BY-PASS AND DIVERSION ROADS, JCT. MARAMAG-MARADUGAO ROAD-JCT. LAMPANUSAN ROAD EXT. (JCT. SAYRE HIGHWAY (DAMULOG)-KIBAWE-JCT. BUDA, KITAOTAO BY-PASS/ALTERNATE ROAD, PACKAGE 30, BUKIDNON | Region X | Region X | On-Going | ₱190.6M | 43% | High risk93 | Flagged0.031 |
| 25K00122CONSTRUCTION OF MISSING LINKS/NEW ROADS BUKIDNON-DAVAO CONNECTOR ROAD (JCT. PANGANAN-KIULOM), PACKAGE 8, BUKIDNON | Region X | Region X | On-Going | ₱76.3M | 75% | High risk93 | Flagged0.005 |
| 25K00360CONSTRUCTION OF MISSING LINKS/ NEW ROADS BUKIDNON-DAVAO (JCT. SINUDA-KALAGANGAN, SAN FERNANDO), PACKAGE 39, BUKIDNON | Region X | Region X | On-Going | ₱190.6M | 50% | High risk93 | Flagged0.033 |
| 24K00519ACCESS ROAD LEADING TO BUKIDNON AIRPORT (JCT. KKK ROAD/LANGCATAON PANGANTUCAN-JCT DON CARLOS-KADINGILAN ROAD/SAN NICOLAS (LANGCATAON, PANGANTUCAN-KAWILIHAN-MAHAYAHAY-PUALAS, DON CARLOS SECTION), PACKAGE 9, BUKIDNON | Region X | Region X | On-Going | ₱190.6M | 80% | High risk89 | Flagged0.076 |
| 24KB0139CONCRETING OF MALOOS TO SITIO SINAYAWAN, BRGY SINUDA FMR, BRGY. SINUDA, KITAOTAO, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱98.8M | 79% | High risk89 | Flagged0.067 |
| 21Z00008DAVAO CITY BYPASS CONSTRUCTION PROJECT (II), PACKAGE I-3 STA. 23+500 - STA. 29+700 | Central Office | Roads Management Cluster I (Bilateral) | On-Going | ₱9.7B | 3% | High risk81 | Flagged0.048 |
| 24K00332CONST./IMPRVT OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN) ACCESS ROAD LEADING TO BUKIDNON AIRPORT (JCT. MARAMAG-JCT. DON CARLOS-KADINGILAN ROAD/SAN NICOLAS SECTION), DON CARLOS, BUK, PACKAGE VIII | Region X | Region X | On-Going | ₱190.5M | 70% | High risk80 | Flagged0.030 |
| 24K00191CONSTRUCTION OF JCT. MARAMAG-MARADUGAO RD., BRGY. SAN MIGUEL-BRGY. MARAYMARAY ROAD, MARAMAG, BUKIDNON, MARAMAG, BUKIDNON (PACKAGE I) | Region X | Region X | On-Going | ₱190.6M | 90% | High risk80 | Flagged0.025 |
| 24K00355CONST. OF MISSING LINKS/NEW ROADS, BUKIDNON - DAVAO (JCT. SINUDA - KALAGANGAN, SAN FERNANDO), PACKAGE 37, BUKIDNON | Region X | Region X | On-Going | ₱185.8M | 85% | High risk80 | Flagged0.026 |
| 24K00324CONST. OF MISSING LINKS/NEW ROADS BUKIDNON - DAVAO (JCT. SINUDA - KALAGANGAN, SAN FERNANDO), PACKAGE 36, BUKIDNON | Region X | Region X | On-Going | ₱185.7M | 85% | High risk80 | Flagged0.026 |
| 19L00085CONSTRUCTION OF CONCRETE ROAD-MONKAYO-COMPOSTELA ROAD, PACKAGE E, COMPOSTELA VALLEY | Region XI | Region XI | Completed | ₱140.2M | 100% | High risk80 | Flagged0.015 |
| 17L00141CONC./WIDENING/IMPVT. OF BYPASS RD @ BUHANGIN-TIGATTO-MANDUG-CALLAWA-FATIMA RD INCL. CONST. OF UDION | Region XI | Region XI | Completed | ₱228.2M | 100% | High risk79 | Flagged0.013 |
| 17L00139CONC./WIDENING/IMPVT. OF BYPASS RD AT BUHANGIN-TIGATTO-MANDUG-CALLAWA-FATIMA RD INCL. CONST. OF SUAD | Region XI | Region XI | Completed | ₱213.2M | 100% | High risk79 | Flagged0.012 |
| 24K00224CONSTRUCTION OF ROAD, MALAYBALAY-GINGOOG ROAD (GINGOOG CITY-KALHAAN, CLAVERIA-BULONAY-MALAYBALAY CITY), MISAMIS ORIENTAL (PACKAGE 27) | Region X | Region X | On-Going | ₱146.2M | 98% | High risk79 | Flagged0.013 |
| 24K00152CONST. OF MISSING LINKS/NEW ROAD MALAYBALAY-GINGOOG ROAD (GINGOOG CITY-KALHAAN, CLAVERIA-BULONAY-MALAYBALAY CITY), PACKAGE 27, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱166.8M | 95% | High risk79 | Flagged0.016 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24K00519ACCESS ROAD LEADING TO BUKIDNON AIRPORT (JCT. KKK ROAD/LANGCATAON PANGANTUCAN-JCT DON CARLOS-KADINGILAN ROAD/SAN NICOLAS (LANGCATAON, PANGANTUCAN-KAWILIHAN-MAHAYAHAY-PUALAS, DON CARLOS SECTION), PACKAGE 9, BUKIDNON | Region X | Region X | On-Going | ₱190.6M | 80% | High risk89 | Flagged0.076 |
| 24KB0139CONCRETING OF MALOOS TO SITIO SINAYAWAN, BRGY SINUDA FMR, BRGY. SINUDA, KITAOTAO, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱98.8M | 79% | High risk89 | Flagged0.067 |
| 19L00193CONSTRUCTION OF CONCRETE BRIDGE - NEW BATAAN - BAGANGA ROAD (TAYTAYAN - MANURIGAO), NEW BATAAN, DAVAO DE ORO 1ST LD | Region XI | Region XI | On-Going | ₱90.2M | 89% | High risk64 | Flagged0.062 |
| 25N00234CONSTRUCTION OF SAN LUIS-BINICALAN-ZAMBOANGUITA ROAD, BRGY. MAHAYAHAY, SAN LUIS, AGUSAN DEL SUR (PACKAGE 3) | Region XIII | Region XIII | On-Going | ₱342.3M | 8% | High risk95 | Flagged0.061 |
| 25N00235CONSTRUCTION OF SAN LUIS-BINICALAN-ZAMBOANGUITA ROAD, BRGY. MAHAYAHAY, SAN LUIS, AGUSAN DEL SUR (PACKAGE 4) | Region XIII | Region XIII | On-Going | ₱293.4M | 8% | High risk95 | Flagged0.060 |
| 21Z00008DAVAO CITY BYPASS CONSTRUCTION PROJECT (II), PACKAGE I-3 STA. 23+500 - STA. 29+700 | Central Office | Roads Management Cluster I (Bilateral) | On-Going | ₱9.7B | 3% | High risk81 | Flagged0.048 |
| 25K00406CONSTRUCTION OF CONRETE ROAD, MAT-I - LUBILAN, NAAWAN TO MISAMIS ORIENTAL WEST DIVERSION ROAD, (OPOL TO LUGAIT), PACKAGE 8, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱238.3M | 21% | High risk96 | Flagged0.046 |
| 23L00066DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE - STA. ANA. WHARF - R. CASTILLO), TIMES BEACH - ROXAS AVE. SEGMENT, DAVAO CITY | Region XI | Region XI | On-Going | ₱989.1M | 89% | High risk69 | Flagged0.038 |
| 24L00122DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE - STA. ANA WHARF - R. CASTILLO), PACKAGE 6, DAVAO CITY | Region XI | Region XI | On-Going | ₱719.8M | 0% | High risk66 | Flagged0.036 |
| 19L00124CONSTRUCTION OF GRAVEL ROAD-MAWAB-MARAGUSAN-CARAGA ROAD, PACKAGE D, DAVAO ORIENTAL | Region XI | Region XI | On-Going | ₱161.8M | 45% | High risk69 | Flagged0.035 |
| 18L00159MAWAB-MARAGUSAN-CARAGA ROAD,PACKAGES A & B, INCL. ROW, DAVAO ORIENTAL,A)MAWAB-MARAGUSAN-CARAGA RD., | Region XI | Region XI | On-Going | ₱378.4M | 79% | High risk65 | Flagged0.035 |
| 20L00007CONSTRUCTION OF CONCRETE ROAD-MAWAB-MARAGUSAN-CARAGA ROAD, SECTION 1, PACKAGE I, COMPOSTELA VALLEY | Region XI | Region XI | On-Going | ₱238.8M | 95% | High risk68 | Flagged0.034 |
| 25K00360CONSTRUCTION OF MISSING LINKS/ NEW ROADS BUKIDNON-DAVAO (JCT. SINUDA-KALAGANGAN, SAN FERNANDO), PACKAGE 39, BUKIDNON | Region X | Region X | On-Going | ₱190.6M | 50% | High risk93 | Flagged0.033 |
| 25K00306CONST. OF BY-PASS AND DIVERSION ROADS, JCT. MARAMAG-MARADUGAO ROAD-JCT. LAMPANUSAN ROAD EXT. (JCT. SAYRE HIGHWAY (DAMULOG)-KIBAWE-JCT. BUDA, KITAOTAO BY-PASS/ALTERNATE ROAD, PACKAGE 30, BUKIDNON | Region X | Region X | On-Going | ₱190.6M | 43% | High risk93 | Flagged0.031 |
| 18L00160MARAGUSAN-PANTUKAN ROAD (PANTUKAN SECTION),PACKAGE A & B, INCLUDING ROW, COMPOSTELA VALLEY,A)CONST./ | Region XI | Region XI | On-Going | ₱549.9M | 80% | High risk65 | Flagged0.031 |
| 23K00122CONST. OF MISSING LINKS/ NEW ROADS, MALAYBALAY - GINGOOG ROAD (GINGOOG CITY - KALHAAN, CLAVERIA-BULONAY-MALAYBALAY CITY) PACKAGE 22, BUKIDNON | Region X | Region X | On-Going | ₱237.4M | 100% | High risk78 | Flagged0.030 |
| 17L00191CONCRETING OF SITIO TAWNGATOK, BRGY. GUPITAN-LORETO BOUNDARY, DAVAO DEL NORTE | Region XI | Region XI | Completed | ₱149.6M | 100% | Medium risk46 | Flagged0.030 |
| 24K00332CONST./IMPRVT OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN) ACCESS ROAD LEADING TO BUKIDNON AIRPORT (JCT. MARAMAG-JCT. DON CARLOS-KADINGILAN ROAD/SAN NICOLAS SECTION), DON CARLOS, BUK, PACKAGE VIII | Region X | Region X | On-Going | ₱190.5M | 70% | High risk80 | Flagged0.030 |
| 24K00175ACCESS ROADS AND/OR BRIDGE FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- MALAYBALAY - GINGOOG ROAD (GINGOOG CITY-KALHAAN-CLAVERIA-BULONAY-MALAYBALAY CITY), MISAMIS ORIENTAL, (PACKAGE 26) | Region X | Region X | On-Going | ₱244.3M | 71% | High risk79 | Flagged0.029 |
| 25N00239CONSTRUCTION OF SURIGAO DEL NORTE NAUTICAL HIGHWAY (HAYANGGABON-BUCAS GRANDE ISLAND-DAPA ROAD), SURIGAO DEL NORTE (PACKAGE 2) | Region XIII | Region XIII | On-Going | ₱342.3M | 0% | Medium risk52 | Flagged0.028 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 451 | 19N00103CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS- LOCAL ROADS- CONSTRUCTION-JCT. TO BRGY. TAHINA PROPER ESPERANZA, PACKAGE 2, ESPERANZA, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱144.7M | 100% | Medium risk50 | —-0.062 |
| 452 | 19N00070CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS-CONSTRUCTION OF BRGY. TAHINA-BRGY.OROMICA, ESPERANZA PACKAGE 3, ESPERANZA, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱144.7M | 100% | Medium risk50 | —-0.061 |
| 453 | 21L00018CONSTRUCTION OF CONCRETE BRIDGE - BUKIDNON - COMPOSTELA VALLEY ROAD (BRGY. NAMNAM, SAN FERNANDO, BUKIDNON - LAAK, COMPOSTELA VALLEY) PACKAGE 5, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱49.1M | 100% | Medium risk50 | —-0.010 |
| 454 | 21N00107CONSTRUCTION OF BUNAWAN- VERUELA ROAD (PHASE 2), BUNAWAN, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱125.4M | 100% | Medium risk50 | —-0.011 |
| 455 | 17L00013WIDENING (2 INTO 4-6 LANES) OF DIGOS-MAKAR ROAD INCLUDING RROW (GUIHING-PALILI SECT.),DAVAO DEL SUR | Region XI | Region XI | Completed | ₱171.6M | 100% | Medium risk50 | —-0.029 |
| 456 | 22K00268CONST./IMPRVT. OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES AND ECONOMIC ZONES(ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) SOUTHERN BUKIDNON AGRI-INDUSTRIAL ECONOMIC ZONE ROAD NETWORK DEVELOPMENT, PACKAGE 39, BUKIDNON | Region X | Region X | Completed | ₱47.1M | 100% | Medium risk49 | —-0.091 |
| 457 | 22K00250CONST./IMPRVT. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES(ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT) SOUTHERN BUKIDNON AGRI-INDUSTRIAL ECONOMIC ZONE ROAD NETWORK DEVELOPMENT, PACKAGE 38, BUKIDNON | Region X | Region X | Completed | ₱47.1M | 100% | Medium risk49 | —-0.091 |
| 458 | 22K00124CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS(KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN), ACCESS ROAD LEADING TO PROPOSED BUKIDNON AIRPORT (JCT. MARAMAG-JCT. DON CARLOSKADINGILAN ROAD/ SAN NICOLAS SECTION), DON CARLOS, | Region X | Region X | Completed | ₱48.3M | 100% | Medium risk49 | —-0.092 |
| 459 | 23K00288CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, CABANGLASAN-SAN FERNANDO ALTERNATE ROAD, (MANDAHICAN-MACABUKLOD-HALAPITAN), PACKAGE 10, BUKIDNON | Region X | Region X | Completed | ₱47.7M | 100% | Medium risk49 | —-0.087 |
| 460 | 20LC0013TAGUM-PANABO CIRCUM. ROAD K1505+035-K1508+616, K1510+140-K1510+540, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱78.3M | 100% | Medium risk49 | —-0.049 |
| 461 | 25K00203CONST. OF MISSING LINKS/NEW ROADS ,MALAYBALAY-GINGOOG ROAD (GINGOOG CITY-KALHAAN, CLAVERIA-BULONAY-MALAYBALAY CITY), PACKAGE 32, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱47.7M | 45% | Medium risk49 | —-0.046 |
| 462 | 20N00005EAST- WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/ AGUSAN DEL NORTE TO BUKIDNON, SAMPAGUITA- MAKILOS (AGUSAN DEL SUR/ BUKIDNON BOUNDARY) PACKAGE 12, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱115.8M | 100% | Medium risk49 | —-0.067 |
| 463 | 17K00353CLUSTER C CONST. OF MISSING GAPS CONNECTING NATL RDS INCL. ROW IN BUKIDNON | Region X | Region X | Completed | ₱244M | 100% | Medium risk48 | —-0.028 |
| 464 | 22N00007EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/AGUSAN DEL NORTE TO BUKIDNON, SAMPAGUITA-MAKILOS (AGUSAN DEL SUR/ BUKIDNON BOUNDARY) PACKAGE 11-A, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱96.5M | 100% | Medium risk48 | —-0.067 |
| 465 | 17K00191COMPL. OF THE EAST WEST LATERAL RD CONNECTING AGUSAN DEL SUR/AGUSAN DEL NORTE TO BUK.,DAMAY CALABUGA | Region X | Region X | Completed | ₱188M | 100% | Medium risk48 | —-0.033 |
| 466 | 17K00395CONST. OF MISSING GAPS MALAYBALAY-GINGOOG ROAD, INCL.ROW,PACKAGE 7,BUKIDNON | Region X | Region X | Completed | ₱227.8M | 100% | Medium risk48 | —-0.027 |
| 467 | 17K00222CONST. OF MISSING GAPS CONNECTING NATL RDS MALAYBALAY GINGOOG RD(GINGOOG CITY-MINALWANG),MIS.OR 1ST, | Region X | Region X | Completed | ₱180.3M | 100% | Medium risk47 | —-0.039 |
| 468 | 17K00206CONST. OF MISSING GAPS CONNECTING NATL RDS PUNTIAN ARAKAN RD BUK 3RD LD PACKAGE 1 | Region X | Region X | Completed | ₱177.1M | 100% | Medium risk47 | —-0.033 |
| 469 | 17K00199CONST. OF BY PASSES/DIVERSION ROADS INCL. ROW,JCT. BUDA,QUEZON-JCT.VALENCIA-TALAINGOD RD KALAGANGAN, | Region X | Region X | Completed | ₱182.2M | 100% | Medium risk47 | —-0.037 |
| 470 | 17K00200CONST. OF BY-PASSES/DIVERSION ROADS,INCL. ROW JCT. BUDA,QUEZON-JCT.VALENCIA-TALAINGOD RD-KALAGANGAN, | Region X | Region X | Completed | ₱182.3M | 100% | Medium risk47 | —-0.037 |
| 471 | 24K00013CONST./IMPRVT. OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM-KATUPARAN, ACCESS ROAD LEADING TO BUKIDNON AIRPORT(JCT. KKK ROAD/LANGCATAON, PANGANTUCAN-JCT. DON CARLOS-KADINGILAN ROAD/SAN NICOLAS (LANGCATAON,PANGA | Region X | Region X | On-Going | ₱42.9M | 100% | Medium risk47 | —-0.028 |
| 472 | 21N00127EAST- WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON, SAMPAGUITA- MAKILOS (AGUSAN DEL SUR/ BUKIDNON BOUNDARY), PACKAGE 10, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱106M | 100% | Medium risk47 | —-0.069 |
| 473 | 25K00043CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) ACCESS ROAD LEADING TO BUKIDNON AIRPORT (JCT. KKK ROAD/LANGCATAON, PANGANTUCAN - JCT. DON CARLOS-KADINGILAN ROAD/SAN NICOLAS | Region X | Region X | On-Going | ₱28.6M | 96% | Medium risk47 | —-0.031 |
| 474 | 17K00354CLUSTER D CONST. OF MISSING GAPS CONNECTING NATL ROADS INCL. BR AND ROW IN BUKIDNON 2ND LD | Region X | Region X | Completed | ₱224.4M | 100% | Medium risk47 | —-0.023 |
| 475 | 21L00017CONSTRUCTION OF CONCRETE ROAD - BUKIDNON - COMPOSTELA VALLEY ROAD (BRGY. NAMNAM, SAN FERNANDO, BUKIDNON - LAAK, COMPOSTELA VALLEY) PACKAGE 4, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱45.7M | 93% | Medium risk47 | —-0.018 |