Opening the dossier…
Opening the dossier…
Contractor dossier
99 projects on file, including joint ventures this contractor is part of.
Total projects
99
Total budget
₱7.2B
Average progress
88.4%
Completion rate
63.6%
Below 70%
Average risk score
56.7
Medium risk on average, out of 100
Flagged as unusual
6
6.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 55 | ₱3.5B | 53.7 | 5 | 95.2% |
| Region I | 25 | ₱2B | 57.0 | 0 | 94.5% |
| Region IV-A | 10 | ₱965M | 63.4 | 0 | 96.1% |
| Region IV-B | 9 | ₱656.3M | 67.2 | 1 | 21.7% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 43 | ₱3.1B | 53.2 | 1 | 82.2% |
| Flood Control and Drainage | 42 | ₱3.3B | 56.2 | 0 | 94.8% |
| GAA 2025 OO-2 | 4 | ₱291.6M | 91.6 | 1 | 79.4% |
| OTHER | 4 | ₱313.6M | 78.3 | 4 | 85.4% |
| Bridges | 4 | ₱109M | 47.0 | 0 | 100.0% |
| Buildings and Facilities | 1 | ₱49M | 53.1 | 0 | 74.1% |
| Water Provision and Storage | 1 | ₱5.9M | 44.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PE0005CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN AGNO RIVER BASIN: ALONG AGNO RIVER, SECTION 11 (AMBALANGA RIVER SECTION), ITOGON, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱96.5M | 67% | High risk92 | Flagged0.006 |
| 25PE0001CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN BAUANG RIVER BASIN: ALONG BAUANG RIVER, SECTION 2 (BOLO CREEK SECTION), LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱77.2M | 96% | High risk92 | —-0.002 |
| 25PE0018CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN AGNO RIVER BASIN: ALONG AGNO RIVER MAIN STREAM (TABU SECTION), ITOGON, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱53M | 56% | High risk91 | —-0.002 |
| 25AF0009CONST/REHAB. OF FLOOD MITIGATION FACILITIES W/.IN MAJOR RIVER BASINS & PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL STRUCTURES ALONG ARINGAY RIVER BASIN, PACKAGE 14, TUBAO, LU | Region I | La Union 2nd DEO | On-Going | ₱65M | 99% | High risk91 | —-0.009 |
| 24PE0091CONSTRUCTION OF ROAD ALONG CAMP 1- TABAAN SUR - TABAAN NORTE - TALOY SUR TO MARCOS HIGHWAY, PHASE 3, TUBA, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱96.4M | 81% | High risk90 | Flagged0.060 |
| 24P00014CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL ALONG AGNO RIVER, SITIO BANAO AND SITIO ADONOT, BARANGAY AMBUKLAO, BOKOD, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱147.6M | 65% | High risk78 | Flagged0.028 |
| 24PE0058RESTORATION OF ROAD SLOPE PROTECTION STRUCTURE ALONG KENNON RD - K0216+029-K0216+110, TUBA, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱30.9M | 100% | High risk73 | Flagged0.001 |
| 24P00013CONSTRUCTION OF MISSING LINKS/NEW ROADS - BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, ASIN - NANGALISAN JCT. - BAYABAS - MONGLO JCT. (SECTION 1 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD), BENGUETSABLAN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱38.6M | 96% | High risk72 | Flagged0.006 |
| 25EB0092PREVENTIVE MAINTENANCE - SECONDARY ROADS - MINDORO WEST COASTAL ROAD (SECTION 3) (S00117MR) - K0335+255 - K0336+749, SAN FRANCISCO, SABLAYAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱74.6M | 14% | High risk70 | —-0.004 |
| 25EB0096PREVENTIVE MAINTENANCE - SECONDARY ROADS - MINDORO WEST COASTAL RD (SECTION 3) (S00117MR) - K0298+000-K0300+775 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱68.6M | 24% | High risk70 | —-0.009 |
| 25EB0095PREVENTIVE MAINTENANCE - SECONDARY ROADS - MINDORO WEST COASTAL RD (SECTION 3) (S00117MR) - K0291+000-K0294+173 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱68.6M | 61% | High risk70 | —-0.019 |
| 25EB0097PREVENTIVE MAINTENANCE - SECONDARY ROADS - MINDORO WEST COASTAL RD (SECTION 3) (S00117MR) - K0315+243-K0317+1021 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱66.5M | 25% | High risk70 | —-0.010 |
| 25EB0094PREVENTIVE MAINTENANCE - SECONDARY ROADS - MINDORO WEST COASTAL RD (SECTION 3) (S00117MR) - K0281+000-K0283+796 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱68.6M | 29% | High risk70 | —-0.012 |
| 25EB0105PREVENTIVE MAINTENANCE - TERTIARY ROADS -CROSSING MWCR (POLA) - CASAGUE - JCT. ALACAAK ROAD (S00162MR) - K0385+983 - K0389+000, CASAGUE, STA. CRUZ, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱83.2M | 0% | High risk70 | —-0.000 |
| 25EB0106PREVENTIVE MAINTENANCE - TERTIARY ROADS -JCT. MWCR (BAGONG SILANG) - CABACAO DIVERSION ROAD (S00098MR) - K0426+290 - K0428+1043, BULOS, ABRA DE ILOG, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱83M | 0% | High risk68 | Flagged0.001 |
| 25EB0093PREVENTIVE MAINTENANCE - SECONDARY ROADS - MINDORO WEST COASTAL RD (SECTION 3) (S00117MR) - K0264+000-K0266+786 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱68.6M | 29% | High risk67 | —-0.012 |
| 25AF0103CONST/REHAB. OF FLOOD MIT. FACI W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS - CONST. OF FLOOD MIT. STRUCTURE ALONG ARINGAY RIVER BASIN, BRGY. SAN JUAN WEST, ARINGAY, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱93.6M | 42% | High risk66 | —-0.014 |
| 24DJ0124OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL STRUCTURE (PACKAGE 21), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱96.5M | 81% | High risk64 | —-0.031 |
| 24DJ0141OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF MORONG RIVER FLOOD CONTROL STRUCTURE (PACKAGE 21), SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱96.5M | 94% | High risk64 | —-0.034 |
| 24DJ0125OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL STRUCTURE (PACKAGE 16), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PE0091CONSTRUCTION OF ROAD ALONG CAMP 1- TABAAN SUR - TABAAN NORTE - TALOY SUR TO MARCOS HIGHWAY, PHASE 3, TUBA, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱96.4M | 81% | High risk90 | Flagged0.060 |
| 24P00014CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL ALONG AGNO RIVER, SITIO BANAO AND SITIO ADONOT, BARANGAY AMBUKLAO, BOKOD, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱147.6M | 65% | High risk78 | Flagged0.028 |
| 24P00013CONSTRUCTION OF MISSING LINKS/NEW ROADS - BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, ASIN - NANGALISAN JCT. - BAYABAS - MONGLO JCT. (SECTION 1 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD), BENGUETSABLAN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱38.6M | 96% | High risk72 | Flagged0.006 |
| 25PE0005CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN AGNO RIVER BASIN: ALONG AGNO RIVER, SECTION 11 (AMBALANGA RIVER SECTION), ITOGON, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱96.5M | 67% | High risk92 | Flagged0.006 |
| 25EB0106PREVENTIVE MAINTENANCE - TERTIARY ROADS -JCT. MWCR (BAGONG SILANG) - CABACAO DIVERSION ROAD (S00098MR) - K0426+290 - K0428+1043, BULOS, ABRA DE ILOG, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱83M | 0% | High risk68 | Flagged0.001 |
| 24PE0058RESTORATION OF ROAD SLOPE PROTECTION STRUCTURE ALONG KENNON RD - K0216+029-K0216+110, TUBA, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱30.9M | 100% | High risk73 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25PE0005CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN AGNO RIVER BASIN: ALONG AGNO RIVER, SECTION 11 (AMBALANGA RIVER SECTION), ITOGON, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱96.5M | 67% | High risk92 | Flagged0.006 |
| 2 | 25PE0001CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN BAUANG RIVER BASIN: ALONG BAUANG RIVER, SECTION 2 (BOLO CREEK SECTION), LA TRINIDAD, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱77.2M | 96% | High risk92 | —-0.002 |
| 3 | 25PE0018CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN AGNO RIVER BASIN: ALONG AGNO RIVER MAIN STREAM (TABU SECTION), ITOGON, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱53M | 56% | High risk91 | —-0.002 |
| 4 | 25AF0009CONST/REHAB. OF FLOOD MITIGATION FACILITIES W/.IN MAJOR RIVER BASINS & PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL STRUCTURES ALONG ARINGAY RIVER BASIN, PACKAGE 14, TUBAO, LU | Region I | La Union 2nd DEO | On-Going | ₱65M | 99% | High risk91 | —-0.009 |
| 5 | 24PE0091CONSTRUCTION OF ROAD ALONG CAMP 1- TABAAN SUR - TABAAN NORTE - TALOY SUR TO MARCOS HIGHWAY, PHASE 3, TUBA, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱96.4M | 81% | High risk90 | Flagged0.060 |
| 6 | 24P00014CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL ALONG AGNO RIVER, SITIO BANAO AND SITIO ADONOT, BARANGAY AMBUKLAO, BOKOD, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱147.6M | 65% | High risk78 | Flagged0.028 |
| 7 | 24PE0058RESTORATION OF ROAD SLOPE PROTECTION STRUCTURE ALONG KENNON RD - K0216+029-K0216+110, TUBA, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱30.9M | 100% | High risk73 | Flagged0.001 |
| 8 | 24P00013CONSTRUCTION OF MISSING LINKS/NEW ROADS - BAGUIO - LA TRINIDAD - ITOGON - SABLAN - TUBA AND TUBLAY, ASIN - NANGALISAN JCT. - BAYABAS - MONGLO JCT. (SECTION 1 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD), BENGUETSABLAN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱38.6M | 96% | High risk72 | Flagged0.006 |
| 9 | 25EB0092PREVENTIVE MAINTENANCE - SECONDARY ROADS - MINDORO WEST COASTAL ROAD (SECTION 3) (S00117MR) - K0335+255 - K0336+749, SAN FRANCISCO, SABLAYAN, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱74.6M | 14% | High risk70 | —-0.004 |
| 10 | 25EB0096PREVENTIVE MAINTENANCE - SECONDARY ROADS - MINDORO WEST COASTAL RD (SECTION 3) (S00117MR) - K0298+000-K0300+775 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱68.6M | 24% | High risk70 | —-0.009 |
| 11 | 25EB0095PREVENTIVE MAINTENANCE - SECONDARY ROADS - MINDORO WEST COASTAL RD (SECTION 3) (S00117MR) - K0291+000-K0294+173 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱68.6M | 61% | High risk70 | —-0.019 |
| 12 | 25EB0097PREVENTIVE MAINTENANCE - SECONDARY ROADS - MINDORO WEST COASTAL RD (SECTION 3) (S00117MR) - K0315+243-K0317+1021 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱66.5M | 25% | High risk70 | —-0.010 |
| 13 | 25EB0094PREVENTIVE MAINTENANCE - SECONDARY ROADS - MINDORO WEST COASTAL RD (SECTION 3) (S00117MR) - K0281+000-K0283+796 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱68.6M | 29% | High risk70 | —-0.012 |
| 14 | 25EB0105PREVENTIVE MAINTENANCE - TERTIARY ROADS -CROSSING MWCR (POLA) - CASAGUE - JCT. ALACAAK ROAD (S00162MR) - K0385+983 - K0389+000, CASAGUE, STA. CRUZ, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱83.2M | 0% | High risk70 | —-0.000 |
| 15 | 25EB0106PREVENTIVE MAINTENANCE - TERTIARY ROADS -JCT. MWCR (BAGONG SILANG) - CABACAO DIVERSION ROAD (S00098MR) - K0426+290 - K0428+1043, BULOS, ABRA DE ILOG, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | On-Going | ₱83M | 0% | High risk68 | Flagged0.001 |
| 16 | 25EB0093PREVENTIVE MAINTENANCE - SECONDARY ROADS - MINDORO WEST COASTAL RD (SECTION 3) (S00117MR) - K0264+000-K0266+786 | Region IV-B | Mindoro Occidental DEO | On-Going | ₱68.6M | 29% | High risk67 | —-0.012 |
| 17 | 25AF0103CONST/REHAB. OF FLOOD MIT. FACI W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS - CONST. OF FLOOD MIT. STRUCTURE ALONG ARINGAY RIVER BASIN, BRGY. SAN JUAN WEST, ARINGAY, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱93.6M | 42% | High risk66 | —-0.014 |
| 18 | 24DJ0124OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL STRUCTURE (PACKAGE 21), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱96.5M | 81% | High risk64 | —-0.031 |
| 19 | 24DJ0141OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF MORONG RIVER FLOOD CONTROL STRUCTURE (PACKAGE 21), SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱96.5M | 94% | High risk64 | —-0.034 |
| 20 | 24DJ0125OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL STRUCTURE (PACKAGE 16), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 21 | 24DJ0126OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL STRUCTURE (PACKAGE 17), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 22 | 24DJ0130OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL STRUCTURE (PACKAGE 20), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 23 | 24DJ0115OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL STRUCTURE (PACKAGE 22), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 24 | 24DJ0122OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DUMACAA RIVER FLOOD CONTROL STRUCTURE (PACKAGE 19), LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 25 | 24DJ0142OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF MORONG RIVER FLOOD CONTROL STRUCTURE (PACKAGE 18), SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱96.5M | 86% | High risk64 | —-0.033 |