Contractor dossier
29 projects on file, including joint ventures this contractor is part of.
Total projects
29
Total budget
₱396.5M
Average progress
94.2%
Completion rate
86.2%
Average risk score
37.3
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 26 | ₱377.2M | 38.1 | 0 | 93.5% |
| Region III | 3 | ₱19.3M | 30.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 18 | ₱106.1M | 31.1 | 0 | 100.0% |
| Flood Control and Drainage | 8 | ₱259.7M | 47.1 | 0 | 79.0% |
| Buildings and Facilities | 2 | ₱21.1M | 48.0 | 0 | 100.0% |
| OTHER | 1 | ₱9.6M | 50.3 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Nothing to report.
No high-risk projects here.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 23OE0089REHABILITATION OF DRAINAGE SYSTEM AT ZONE 41 - 57 (PHASE 2), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱67.5M | 100% | Medium risk53 | —-0.081 |
| 2 | 19OE0028LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - REHABILITATION / RECONSTRUCTION / UPGRADING OF ROAD INCLUDING DRAINAGE AT G. TUAZON ST., MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱9.6M | 100% | Medium risk50 | —-0.044 |
| 3 | 22OE0032REHABILITATION OF BLUMENTRITT INTERCEPTOR, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱50.7M | 100% | Medium risk49 | —-0.088 |
| 4 | 22OD0247CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. 166, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱9.6M | 100% | Medium risk48 | —-0.100 |
| 5 | 21OE0115CONSTRUCTION / REHABILITATION / IMPROVEMENT OF SCHOOL AT:1.ANTONIO MACEDA ELEMENTARY SCHOOL, BARANGAY 581, MANILA2.GEN. MIGUEL MALVAR ELEMENTARY SCHOOL, BARANGAY 581, MANILA3.ANTONIO MACEDA HIGH SCHOOL, BARANGAY 581, MANILA | National Capital Region | North Manila DEO | Completed | ₱11.5M | 100% | Medium risk48 | —-0.103 |
| 6 | 18OE0122LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS-IMPROVEMENT OF ROADS WITH DRAINAGE INCLUDING PATHWAYS ZONE 41-45, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱28.5M | 100% | Medium risk47 | —-0.099 |
| 7 | 25OE0142REHABILITATION OF DRAINAGE SYSTEM ALONG GALICIA ST., MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱28.5M | 1% | Medium risk46 | —-0.028 |
| 8 | 25OE0139REHABILITATION OF DRAINAGE SYSTEM ALONG MORET ST., MANILA CITY | National Capital Region | North Manila DEO | On-Going | ₱28.5M | 31% | Medium risk46 | —-0.038 |
| 9 | 24OE0117CONSTRUCTION OF REINFORCED CONCRETE BOX CULVERT ALONG CAYCO ST. (ESPAÑA BLVD TO SH LOYOLA ST.), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱28.7M | 100% | Medium risk46 | —-0.088 |
| 10 | 24OE0127CONSTRUCTION OF REINFORCED CONCRETE BOX CULVERT ALONG MF JHOCSON ST. (ESPAÑA BLVD TO SH LOYOLA ST.), MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱28.4M | 100% | Medium risk46 | —-0.089 |
| 11 | 20OE0039ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DRAINAGE ALONG ZONE 50 AND 51, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱13.3M | 100% | Medium risk46 | —-0.090 |
| 12 | 21OE0072REHABILITATION OF FLOOD CONTROL STRUCTURES AND FACILITIES ALONG SOUTH ANTIPOLO DRAINAGE MAIN, STA. 0+000.00 TO STA. 0 + 999.10, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱14M | 100% | Medium risk46 | —-0.090 |
| 13 | 25OH0056ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM/ASSET PRESERVATION PROGRAM/REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - ROXAS BLVD - (S02784LZ) CHAINAGE 000 - CHAINAGE 080 | National Capital Region | South Manila DEO | On-Going | ₱11.2M | 100% | Medium risk46 | —-0.071 |
| 14 | 19OE0084ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS ALGECIRAS ST - K0006 + -602.50 - K0006 + -069 | National Capital Region | North Manila DEO | Completed | ₱6.6M | 100% | Medium risk46 | —-0.100 |
| 15 | 20OE0138REHABILITATION OF ROADS AND DRAINAGE AT CORDILLERA ST. AND EXT., MANILA | National Capital Region | North Manila DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.101 |
| 16 | 19OE0098ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS SANTOL (S02426LZ) CHAINAGE 0 - CHAINAGE 543 | National Capital Region | North Manila DEO | Completed | ₱7.4M | 100% | Medium risk46 | —-0.101 |
| 17 | 20OE0117REHABILITATION / RECONSTRUCTION / UPGRADING OF ROAD AT J. RIZAL AVE - K0004+288.9 TO K0004+509.70 | National Capital Region | North Manila DEO | Completed | ₱4.7M | 100% | Medium risk41 | —-0.098 |
| 18 | 21CC0153CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT) BRGY. BATIA, BOCAUE TO BRGY. MALIBONG MATANDA TO MALIBONG BATA ROAD, PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.5M | 100% | Medium risk32 | —-0.105 |
| 19 | 23CC0035REHABILITATION OF ROAD, PAITAN, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱4.8M | 100% | Medium risk30 | —-0.105 |
| 20 | 22CC0103IMPROVEMENT OF ROAD, PUROK 1, 2 AND 6, BARANGAY STO. NINO, BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱4.9M | 100% | Low risk30 | —-0.107 |
| 21 | 19OE0227ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSETPRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - DIMASALANG ST. K0005 + 356 - K0005 + 927 | National Capital Region | North Manila DEO | Completed | ₱4M | 100% | Low risk25 | —-0.098 |
| 22 | 20OE0060LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM -LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONCRETING / UPGRADING AND DRAINAGE IMPROVEMENT OF ROADS AND PATHWAYS, BARANGAY 210, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱2.9M | 100% | Low risk25 | —-0.099 |
| 23 | 19OE0094ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHABILITATION / RECONSTRUCTION UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - VG CRUZ - K0005 + 361.7 - K0005 + 461.20 | National Capital Region | North Manila DEO | Completed | ₱2.8M | 100% | Low risk25 | —-0.096 |
| 24 | 25OH0053ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION-RECONSTRUCTION-UPGRADING OF DAMAGED PAVED ROADS- SECONDARY ROADS - TAFT AVE - K0002 + (-472)- K0002 + (-414) | National Capital Region | South Manila DEO | On-Going | ₱2.3M | 100% | Low risk24 | —-0.070 |
| 25 | 21OE0032ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - SOLIS CHAINAGE 0 - CHAINAGE 227 | National Capital Region | North Manila DEO | Completed | ₱1.6M | 100% | Low risk20 | —-0.098 |