Contractor dossier
341 projects on file, including joint ventures this contractor is part of.
Total projects
341
Total budget
₱18.4B
Average progress
91.1%
Completion rate
78.6%
Average risk score
54.4
Medium risk on average, out of 100
Flagged as unusual
9
2.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 336 | ₱17.8B | 54.4 | 7 | 91.3% |
| Region III | 3 | ₱228.4M | 58.4 | 1 | 83.1% |
| Region V | 1 | ₱273.7M | 69.9 | 1 | 41.2% |
| Cordillera Administrative Region | 1 | ₱71.8M | 55.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 130 | ₱6.2B | 51.0 | 0 | 94.9% |
| Buildings and Facilities | 86 | ₱2.5B | 52.4 | 1 | 82.9% |
| Flood Control and Drainage | 51 | ₱3.6B | 55.3 | 1 | 95.4% |
| Bridges | 39 | ₱2.6B | 54.7 | 1 | 93.9% |
| OTHER | 18 | ₱1.4B | 70.0 | 2 | 96.4% |
| Bridges, Roads | 14 | ₱1.9B | 66.7 | 3 | 78.8% |
| GAA 2025 SSP | 1 | ₱14.4M | 94.3 | 1 | 78.0% |
| GAA 2025 OO-2 | 1 | ₱93.6M | 93.4 | 0 | 68.9% |
| GAA 2025 OO-1 | 1 | ₱34M | 92.6 | 0 | 81.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DB0149CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SLOPE PROTECTION AT DIVERSION ROAD, BARANGAY CARSUCHE, TAAL, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱14.4M | 78% | High risk94 | Flagged0.002 |
| 25DB0034ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJ FLOODS-FLOOD MANAGEMENT PROG-CONST/REHAB OF FLOOD MITIGATION FAC W/ IN MAJ RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG PANSIPIT RIVER,LEMERY,BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱93.6M | 69% | High risk93 | —-0.016 |
| 25D00099CONSTRUCTION OF MISSING LINKS/ NEW ROADS GENERAL AGUINALDO-MAGALLANES-NASUGBU ROAD (EAST-WEST ROAD), NASUGBU SECTION, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱34M | 81% | High risk93 | —-0.008 |
| 24CC0646CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY MANATAL (SITIO DAUNGAN TO PUROK 2), PANDI, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 49% | High risk79 | Flagged0.036 |
| 17D00036LOCALLY FUNDED PROJECT - BUILDING & OTHER STRUCTURES, MULTI-PURPOSE/FACILITIES, NAT'L. BUILDING PROGRAMS, CONSTRUCTION OF DPWH REGIONAL OFFICE IV-A BUILDING INCL. FENCE (PHASE I), BRGY. MAYAPA, CALAMBA CITY, LAGUNA | Region IV-A | Region IV-A | Completed | ₱210.4M | 100% | High risk78 | —-0.027 |
| 21D00034FY 2021 DPWH INFRASTRUCTURE PROGRAM LOCAL PROGRAMBUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - NATIONAL BUILDING PROGRAM CONSTRUCTION OF DPWH REGIONAL OFFICE IV-A BUILDING INCLUDING SITE DEVELOPMENT, BARANGAY MAYAPA, CALAMBA CITY, LAGUNA | Region IV-A | Region IV-A | On-Going | ₱183.3M | 35% | High risk76 | Flagged0.048 |
| 25DC0135CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY BALETE, SAN NICOLAS, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 52% | High risk74 | —-0.027 |
| 17D00058MFO-3 MAINT. & CONST. SERVICES OF OTHER INFRA. CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS, & DECLARED TOURISM DESTINATIONS TO DECLARED TOURISM DESTINATIONS LOBO-MALABRIGO-LAIYA-SAN JUAN ROAD, INCL. BRIDGE, LOBO, BATANGAS | Region IV-A | Region IV-A | Completed | ₱96.5M | 100% | High risk74 | —-0.049 |
| 19D00009FY 2019 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS LIPA CITY - PADRE GARCIA DIVERSION ROAD, PACKAGE A, BATANGAS | Region IV-A | Region IV-A | Completed | ₱96.5M | 100% | High risk74 | —-0.016 |
| 17DD0020IMPROVEMENT/WIDENING OF NATIONAL ROADS, SECONDARY ROADS, BATANGAS-QUEZON ROAD, PADRE GARCIA, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱82.9M | 100% | High risk73 | —-0.036 |
| 17D00002ASSET PRESERVATION OF NATIONAL ROADS PREVENTIVE MAINT. BASED ON PAVEMENT MNGMT. SYSTEM/HIGHWAY DEV;T. & MANAGEMENT-4 (HDM-4) SECONDARY ROADS TERNATE-NASUGBU ROAD (S01859LZ) K0075+(-338) - K0082+000, K0083+000-K0084+500, NET LENGTH=8838.00 L.M., BATANGAS | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk73 | —-0.046 |
| 18DD0013ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT, ROAD WIDENING, SECONDARY ROADS, BATANGAS - QUEZON ROAD, K0110+060 - K0112+135, PADRE GARCIA, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱88.3M | 100% | High risk73 | —-0.034 |
| 19DF0152LOCAL PROGRAM-CONST./REPAIR/REHAB./IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS- WIDENING OF ARNALDO HI-WAY ROAD PHASE I GEN. TRIAS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱96.5M | 100% | High risk72 | —-0.029 |
| 18DC0126CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARE | Region IV-A | Batangas 3rd DEO | Completed | ₱193M | 100% | High risk72 | Flagged0.003 |
| 20DB0007ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - TERNATE-NASUGBU RD - K0085+288 - K0085+433 | Region IV-A | Batangas 1st DEO | Completed | ₱96.5M | 100% | High risk72 | —-0.062 |
| 25DC0184CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY IV, MATAAS NA KAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱9.7M | 17% | High risk72 | —-0.017 |
| 25DC0146CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING AT BRGY. BANJO EAST, TANAUAN CITY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱9.7M | 49% | High risk72 | —-0.027 |
| 25DC0162CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI PURPOSE BUILDING AT BRGY. BALELE, TANAUAN CITY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱9.7M | 48% | High risk72 | —-0.028 |
| 25DC0147CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY ULANGO, TANAUAN CITY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱7.8M | 34% | High risk72 | —-0.024 |
| 25DC0143CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI PURPOSE BUILDING AT BRGY. PAGASPAS, TANAUAN CITY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱9.7M | 36% | High risk72 | —-0.024 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21D00034FY 2021 DPWH INFRASTRUCTURE PROGRAM LOCAL PROGRAMBUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - NATIONAL BUILDING PROGRAM CONSTRUCTION OF DPWH REGIONAL OFFICE IV-A BUILDING INCLUDING SITE DEVELOPMENT, BARANGAY MAYAPA, CALAMBA CITY, LAGUNA | Region IV-A | Region IV-A | On-Going | ₱183.3M | 35% | High risk76 | Flagged0.048 |
| 24CC0646CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY MANATAL (SITIO DAUNGAN TO PUROK 2), PANDI, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 49% | High risk79 | Flagged0.036 |
| 24F00057ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-NAGA-JCT. MAGARAO-CANAMAN-LIBMANAN JCT. PPH ROAD (SKYBRIDGE), CAMARINES SUR PACKAGE 2, MAGARAO, CAMARINES SUR ( | Region V | Region V | On-Going | ₱273.7M | 41% | High risk70 | Flagged0.014 |
| 22D00020CONSTRUCTION OF MISSING LINKS/ NEW ROADSGENERAL AGUINALDO - MAGALLANES - NASUGBU ROAD (EAST-WEST ROAD), INDANG-EAST SECTION, PACKAGE 2, CAVITE | Region IV-A | Region IV-A | On-Going | ₱142.8M | 0% | High risk68 | Flagged0.013 |
| 23D00136CONSTRUCTION OF MISSING LINKS / NEW ROADSGENERAL AGUINALDO - MAGALLANES - NASUGBU ROAD (EAST - WEST ROAD), INDANG - EAST SECTION, PACKAGE 4, CAVITE | Region IV-A | Region IV-A | On-Going | ₱209.4M | 28% | High risk68 | Flagged0.010 |
| 24DF0280CONSTRUCTION OF 4-STOREY 12-CLASSROOM SCHOOL BUILDING IN MALAGASANG I ELEMENTARY SCHOOL, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱45.9M | 70% | Medium risk49 | Flagged0.003 |
| 18DC0126CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARE | Region IV-A | Batangas 3rd DEO | Completed | ₱193M | 100% | High risk72 | Flagged0.003 |
| 25DB0149CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SLOPE PROTECTION AT DIVERSION ROAD, BARANGAY CARSUCHE, TAAL, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱14.4M | 78% | High risk94 | Flagged0.002 |
| 21D00020FY 2021 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEV'T. PROGRAM CONSTRUCTION OF MISSING LINKS/NEW ROADS GEN. AGUINALDO- MAGALLANES -NASUGBU ROAD (EAST-WEST ROAD), INDANG SECT., CAVITE | Region IV-A | Region IV-A | On-Going | ₱120.6M | 60% | High risk67 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 251 | 22DB0172CONCRETING OF FARM-TO-MARKET ROAD IN BRGY. CARRETONAN, CALATAGAN, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱14.7M | 100% | Medium risk48 | —-0.049 |
| 252 | 23DD0122CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ROAD, BRGY. PALANCA-BRGY. BALAGTASIN-BRGY. PINAGTUNG | Region IV-A | Batangas 4th DEO | Completed | ₱44.2M | 100% | Medium risk48 | —-0.104 |
| 253 | 22DB0143CONCRETING OF BRGY. KAPITO FMR, BRGY. KAPITO, LIAN, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱25.9M | 100% | Medium risk48 | —-0.048 |
| 254 | 21D00040CONVERGENCE & SPECIAL SUPPORT PROGRAM CONST. /IMPVMT. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES SILANGAN RD. (C.A. YULO AVE.) CONNECTING SOUTH LUZON EXPRESSWAY LEADING TO THE INDUSTRIAL PARKS, CANLUBANG, CALAMBA CITY, LAGUNA, PKG.II | Region IV-A | Region IV-A | Completed | ₱42.2M | 100% | Medium risk48 | —-0.107 |
| 255 | 21DC0002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS, MANILA-BATANGAS RD | Region IV-A | Batangas 3rd DEO | Completed | ₱40M | 100% | Medium risk47 | —-0.102 |
| 256 | 23DC0009ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, LIPA-BALETE RD | Region IV-A | Batangas 3rd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.104 |
| 257 | 25DC0006ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - PRIMARY ROADS, MANILA-BATANGAS RD | Region IV-A | Batangas 3rd DEO | Completed | ₱40.7M | 100% | Medium risk47 | —-0.105 |
| 258 | 23DC0011ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, LAKE TAAL-TAGAYTAY RD | Region IV-A | Batangas 3rd DEO | Completed | ₱34.3M | 100% | Medium risk47 | —-0.106 |
| 259 | 24DC0007ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS, DAANG MAHARLIKA (LZ) | Region IV-A | Batangas 3rd DEO | Completed | ₱30.4M | 100% | Medium risk47 | —-0.106 |
| 260 | 24DC0008ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, MANILA SOUTH RD VIA STO. TOMAS POB | Region IV-A | Batangas 3rd DEO | Completed | ₱28.7M | 100% | Medium risk47 | —-0.106 |
| 261 | 23DD0123CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ROAD, BRGY. GALAMAY-AMO-BRGY. PINAGTUNG-ULAN, SAN JO | Region IV-A | Batangas 4th DEO | Completed | ₱32.7M | 100% | Medium risk47 | —-0.108 |
| 262 | 19DE0087ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, PALLOCAN BR. (B03027LZ) ALONG BATANGAS-LOBO RD | Region IV-A | Batangas 2nd DEO | Completed | ₱22.2M | 100% | Medium risk47 | —-0.065 |
| 263 | 24DE0089CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BRIDGE, SAN TEODORO-CUPANG, BAUAN, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱19.8M | 100% | Medium risk47 | —-0.069 |
| 264 | 25DC0132CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS /FACILITIES, REHABILITATION OF BIHIS, TAAL -POBLACION, SAN NICOLAS ROAD INCL | Region IV-A | Batangas 3rd DEO | On-Going | ₱42.5M | 53% | Medium risk47 | —-0.061 |
| 265 | 22DC0104CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF ROAD AT BIHIS, TAAL-POBLACION, SAN NICOLAS ROAD, SAN N | Region IV-A | Batangas 3rd DEO | Completed | ₱39.6M | 100% | Medium risk47 | —-0.107 |
| 266 | 24DD0158CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF ROAD, BRGY. TUGTUG-BRGY. NATUNUAN (PROVINCIAL ROAD), | Region IV-A | Batangas 4th DEO | On-Going | ₱28.8M | 100% | Medium risk47 | —-0.070 |
| 267 | 22DB0017BRIDGE PROGRAM - REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - PALICO BR. (B00050LZ) ALONG TAGAYTAY-NASUGBU RD | Region IV-A | Batangas 1st DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.067 |
| 268 | 22DB0116CONSTRUCTION OF DELIQUENTE BRIDGE ALONG NAVOTAS - SAN PIRO ROAD IN BRGY. SAN PIRO, BALAYAN, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱29.7M | 100% | Medium risk47 | —-0.063 |
| 269 | 18DB0182CONSTRUCTION OF CONCRETE BRIDGE AT PARAISO, CALATAGAN, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.059 |
| 270 | 21DF0044LOCAL PROGRAMCONST. / REPAIR / REHAB / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTSLOCAL ROADS AND BRIDGESLOCAL ROADSIMPROVEMENT/CONCRETING OF ROAD, DON PLACIDO-ARNALDO, GENERAL TRIAS CITY, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱31.7M | 100% | Medium risk47 | —-0.107 |
| 271 | 22DF0194CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESIMPROVEMENT OF ARNALDO HIGHWAY, G | Region IV-A | Cavite 1st DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.107 |
| 272 | 23DC0012ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, LIPA CITY - ALAMINOS RD | Region IV-A | Batangas 3rd DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.107 |
| 273 | 22DF0368ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMREHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADSTEJERO-GEN TRIAS-AMADEO-TAGAYTAY RD - K0041+409 - K0042+000, K0043+725 | Region IV-A | Cavite 1st DEO | Completed | ₱28.6M | 100% | Medium risk47 | —-0.107 |
| 274 | 24DC0006ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, TALISAY-LAUREL-AGONCILLO RD | Region IV-A | Batangas 3rd DEO | Completed | ₱36.3M | 100% | Medium risk47 | —-0.104 |
| 275 | 22DF0255ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMROAD WIDENING - TERTIARY ROADSTEJERO-GEN TRIAS-AMADEO-TAGAYTAY RD - K0041 + 685 - K0042 + 594, K0042 + 974 - K0043 + 725 | Region IV-A | Cavite 1st DEO | Completed | ₱40M | 100% | Medium risk47 | —-0.106 |