Opening the dossier…
Opening the dossier…
Contractor dossier
341 projects on file, including joint ventures this contractor is part of.
Total projects
341
Total budget
₱18.4B
Average progress
91.1%
Completion rate
78.6%
Average risk score
54.4
Medium risk on average, out of 100
Flagged as unusual
9
2.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 336 | ₱17.8B | 54.4 | 7 | 91.3% |
| Region III | 3 | ₱228.4M | 58.4 | 1 | 83.1% |
| Region V | 1 | ₱273.7M | 69.9 | 1 | 41.2% |
| Cordillera Administrative Region | 1 | ₱71.8M | 55.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 130 | ₱6.2B | 51.0 | 0 | 94.9% |
| Buildings and Facilities | 86 | ₱2.5B | 52.4 | 1 | 82.9% |
| Flood Control and Drainage | 51 | ₱3.6B | 55.3 | 1 | 95.4% |
| Bridges | 39 | ₱2.6B | 54.7 | 1 | 93.9% |
| OTHER | 18 | ₱1.4B | 70.0 | 2 | 96.4% |
| Bridges, Roads | 14 | ₱1.9B | 66.7 | 3 | 78.8% |
| GAA 2025 SSP | 1 | ₱14.4M | 94.3 | 1 | 78.0% |
| GAA 2025 OO-2 | 1 | ₱93.6M | 93.4 | 0 | 68.9% |
| GAA 2025 OO-1 | 1 | ₱34M | 92.6 | 0 | 81.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DB0149CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SLOPE PROTECTION AT DIVERSION ROAD, BARANGAY CARSUCHE, TAAL, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱14.4M | 78% | High risk94 | Flagged0.002 |
| 25DB0034ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJ FLOODS-FLOOD MANAGEMENT PROG-CONST/REHAB OF FLOOD MITIGATION FAC W/ IN MAJ RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG PANSIPIT RIVER,LEMERY,BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱93.6M | 69% | High risk93 | —-0.016 |
| 25D00099CONSTRUCTION OF MISSING LINKS/ NEW ROADS GENERAL AGUINALDO-MAGALLANES-NASUGBU ROAD (EAST-WEST ROAD), NASUGBU SECTION, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱34M | 81% | High risk93 | —-0.008 |
| 24CC0646CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY MANATAL (SITIO DAUNGAN TO PUROK 2), PANDI, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 49% | High risk79 | Flagged0.036 |
| 17D00036LOCALLY FUNDED PROJECT - BUILDING & OTHER STRUCTURES, MULTI-PURPOSE/FACILITIES, NAT'L. BUILDING PROGRAMS, CONSTRUCTION OF DPWH REGIONAL OFFICE IV-A BUILDING INCL. FENCE (PHASE I), BRGY. MAYAPA, CALAMBA CITY, LAGUNA | Region IV-A | Region IV-A | Completed | ₱210.4M | 100% | High risk78 | —-0.027 |
| 21D00034FY 2021 DPWH INFRASTRUCTURE PROGRAM LOCAL PROGRAMBUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - NATIONAL BUILDING PROGRAM CONSTRUCTION OF DPWH REGIONAL OFFICE IV-A BUILDING INCLUDING SITE DEVELOPMENT, BARANGAY MAYAPA, CALAMBA CITY, LAGUNA | Region IV-A | Region IV-A | On-Going | ₱183.3M | 35% | High risk76 | Flagged0.048 |
| 25DC0135CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY BALETE, SAN NICOLAS, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱4.8M | 52% | High risk74 | —-0.027 |
| 17D00058MFO-3 MAINT. & CONST. SERVICES OF OTHER INFRA. CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS, & DECLARED TOURISM DESTINATIONS TO DECLARED TOURISM DESTINATIONS LOBO-MALABRIGO-LAIYA-SAN JUAN ROAD, INCL. BRIDGE, LOBO, BATANGAS | Region IV-A | Region IV-A | Completed | ₱96.5M | 100% | High risk74 | —-0.049 |
| 19D00009FY 2019 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS LIPA CITY - PADRE GARCIA DIVERSION ROAD, PACKAGE A, BATANGAS | Region IV-A | Region IV-A | Completed | ₱96.5M | 100% | High risk74 | —-0.016 |
| 17DD0020IMPROVEMENT/WIDENING OF NATIONAL ROADS, SECONDARY ROADS, BATANGAS-QUEZON ROAD, PADRE GARCIA, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱82.9M | 100% | High risk73 | —-0.036 |
| 17D00002ASSET PRESERVATION OF NATIONAL ROADS PREVENTIVE MAINT. BASED ON PAVEMENT MNGMT. SYSTEM/HIGHWAY DEV;T. & MANAGEMENT-4 (HDM-4) SECONDARY ROADS TERNATE-NASUGBU ROAD (S01859LZ) K0075+(-338) - K0082+000, K0083+000-K0084+500, NET LENGTH=8838.00 L.M., BATANGAS | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk73 | —-0.046 |
| 18DD0013ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT, ROAD WIDENING, SECONDARY ROADS, BATANGAS - QUEZON ROAD, K0110+060 - K0112+135, PADRE GARCIA, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱88.3M | 100% | High risk73 | —-0.034 |
| 19DF0152LOCAL PROGRAM-CONST./REPAIR/REHAB./IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS- WIDENING OF ARNALDO HI-WAY ROAD PHASE I GEN. TRIAS, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱96.5M | 100% | High risk72 | —-0.029 |
| 18DC0126CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARE | Region IV-A | Batangas 3rd DEO | Completed | ₱193M | 100% | High risk72 | Flagged0.003 |
| 20DB0007ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - TERNATE-NASUGBU RD - K0085+288 - K0085+433 | Region IV-A | Batangas 1st DEO | Completed | ₱96.5M | 100% | High risk72 | —-0.062 |
| 25DC0184CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY IV, MATAAS NA KAHOY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱9.7M | 17% | High risk72 | —-0.017 |
| 25DC0146CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING AT BRGY. BANJO EAST, TANAUAN CITY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱9.7M | 49% | High risk72 | —-0.027 |
| 25DC0162CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI PURPOSE BUILDING AT BRGY. BALELE, TANAUAN CITY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱9.7M | 48% | High risk72 | —-0.028 |
| 25DC0147CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY ULANGO, TANAUAN CITY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱7.8M | 34% | High risk72 | —-0.024 |
| 25DC0143CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI PURPOSE BUILDING AT BRGY. PAGASPAS, TANAUAN CITY, BATANGAS | Region IV-A | Batangas 3rd DEO | On-Going | ₱9.7M | 36% | High risk72 | —-0.024 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21D00034FY 2021 DPWH INFRASTRUCTURE PROGRAM LOCAL PROGRAMBUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES - NATIONAL BUILDING PROGRAM CONSTRUCTION OF DPWH REGIONAL OFFICE IV-A BUILDING INCLUDING SITE DEVELOPMENT, BARANGAY MAYAPA, CALAMBA CITY, LAGUNA | Region IV-A | Region IV-A | On-Going | ₱183.3M | 35% | High risk76 | Flagged0.048 |
| 24CC0646CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY MANATAL (SITIO DAUNGAN TO PUROK 2), PANDI, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱74.1M | 49% | High risk79 | Flagged0.036 |
| 24F00057ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-NAGA-JCT. MAGARAO-CANAMAN-LIBMANAN JCT. PPH ROAD (SKYBRIDGE), CAMARINES SUR PACKAGE 2, MAGARAO, CAMARINES SUR ( | Region V | Region V | On-Going | ₱273.7M | 41% | High risk70 | Flagged0.014 |
| 22D00020CONSTRUCTION OF MISSING LINKS/ NEW ROADSGENERAL AGUINALDO - MAGALLANES - NASUGBU ROAD (EAST-WEST ROAD), INDANG-EAST SECTION, PACKAGE 2, CAVITE | Region IV-A | Region IV-A | On-Going | ₱142.8M | 0% | High risk68 | Flagged0.013 |
| 23D00136CONSTRUCTION OF MISSING LINKS / NEW ROADSGENERAL AGUINALDO - MAGALLANES - NASUGBU ROAD (EAST - WEST ROAD), INDANG - EAST SECTION, PACKAGE 4, CAVITE | Region IV-A | Region IV-A | On-Going | ₱209.4M | 28% | High risk68 | Flagged0.010 |
| 24DF0280CONSTRUCTION OF 4-STOREY 12-CLASSROOM SCHOOL BUILDING IN MALAGASANG I ELEMENTARY SCHOOL, IMUS CITY, CAVITE | Region IV-A | Cavite 1st DEO | On-Going | ₱45.9M | 70% | Medium risk49 | Flagged0.003 |
| 18DC0126CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARE | Region IV-A | Batangas 3rd DEO | Completed | ₱193M | 100% | High risk72 | Flagged0.003 |
| 25DB0149CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SLOPE PROTECTION AT DIVERSION ROAD, BARANGAY CARSUCHE, TAAL, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱14.4M | 78% | High risk94 | Flagged0.002 |
| 21D00020FY 2021 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEV'T. PROGRAM CONSTRUCTION OF MISSING LINKS/NEW ROADS GEN. AGUINALDO- MAGALLANES -NASUGBU ROAD (EAST-WEST ROAD), INDANG SECT., CAVITE | Region IV-A | Region IV-A | On-Going | ₱120.6M | 60% | High risk67 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 25DC0002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE-TERTIARY ROADS, MANILA SOUTH RD VIA STO. TOMAS POB | Region IV-A | Batangas 3rd DEO | On-Going | ₱46M | 97% | High risk66 | —-0.050 |
| 52 | 24D00042CONSTRUCTION OF BY-PASS AND DIVERSION ROADSMANILA - CAVITE BYPASS ROAD, PACKAGE B, CAVITE | Region IV-A | Region IV-A | On-Going | ₱138.5M | 55% | High risk66 | —-0.001 |
| 53 | 20D00024FY 2020 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS LIPA CITY PADRE GARCIA DIVERSION ROAD PACKAGE F, BATANGAS | Region IV-A | Region IV-A | Completed | ₱130.2M | 100% | High risk66 | —-0.051 |
| 54 | 19D00031FY 2019 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS / NEW ROADS ATIMONAN-MAUBAN ROAD, MAUBAN SECTION, PACKAGE A, QUEZON | Region IV-A | Region IV-A | Completed | ₱139.9M | 100% | High risk66 | —-0.029 |
| 55 | 17DB0048ASSET PRESERVATION OF NATIONAL ROADS - REHAB./RECONST./UPGRADING OF DAMAGED PAVED NATIONAL RDS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGAMENT-4 (HDM-4)-SECONDARY, P00102098LZ, BALAYAN-BALIBAGO ROAD, S05016LZ, K0107 | Region IV-A | Batangas 1st DEO | Completed | ₱17.6M | 100% | High risk66 | —-0.072 |
| 56 | 24D00079CONSTRUCTION OF BY-PASS AND DIVERSION ROADSLIPA CITY-PADRE GARCIA DIVERSION ROAD, PACKAGE O, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱143.2M | 65% | High risk65 | —-0.039 |
| 57 | 20D00025FY 2020 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS LIPA CITY- PADRE GARCIA DIVERSION ROAD, PACKAGE G, BATANGAS | Region IV-A | Region IV-A | Completed | ₱135.1M | 100% | High risk65 | —-0.036 |
| 58 | 25DB0106ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AT LIAN, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱93.6M | 39% | High risk65 | —-0.026 |
| 59 | 22DD0044ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF REVETMENT ALONG LAWAYE RIVER | Region IV-A | Batangas 4th DEO | Completed | ₱93.6M | 100% | High risk65 | —-0.077 |
| 60 | 18D00088FY 2018 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS/NEW ROADS GEN. AGUINALDO-MAGALLANES-NASUGBU ROAD (EAST-WEST RD. AMADEO SECT., CAVITE | Region IV-A | Region IV-A | Completed | ₱193M | 100% | High risk65 | —-0.060 |
| 61 | 24DD0192CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITIES AT POBLACION BARANGAY I, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱244.9M | 100% | High risk65 | —-0.030 |
| 62 | 20D00060FY 2020 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM NETWORK DEV'T. PROGRAM CONSTRUCTION OF MISSING LINKS/NEW ROADS GEN. AGUINALDO- MAGALLANES- NASUGBU ROAD (EAST- WEST ROAD), AMADEO SECT., CAVITE | Region IV-A | Region IV-A | Completed | ₱125.4M | 100% | High risk65 | —-0.047 |
| 63 | 22D00104CONSTRUCTION OF SEAWALL, BULACAN - CALAMIAS SECTION, MABINI, BATANGAS | Region IV-A | Region IV-A | Completed | ₱115.8M | 100% | High risk65 | —-0.068 |
| 64 | 22D00002CONSTRUCTION OF MISSING LINKS / NEW ROADSGENERAL AGUINALDO - MAGALLANES - NASUGBU ROAD (EAST - WEST ROAD), NASUGBU SECTION, PACKAGE I, BATANGAS | Region IV-A | Region IV-A | Completed | ₱144.6M | 100% | High risk64 | —-0.081 |
| 65 | 21D00001FY 2021 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE & RELIABLE NAT'L. ROAD SYSTEM NETWORK DEV'T. PROGRAM CONSTRUCTION OF MISSING LINKS/NEW ROADS GENERAL AGUINALDO-MAGALLANES-NASUGBU ROAD (EAST - WEST ROAD), NASUGBU SECT.,BATANGAS | Region IV-A | Region IV-A | Completed | ₱183.3M | 100% | High risk64 | —-0.072 |
| 66 | 19DC0049CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, TAAL LAKE CIRCUMFERENTIAL ROAD (STA. TERESITA SECTION), STA. TERESITA, BATANGAS | Region IV-A | Batangas 3rd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 67 | 23DD0068CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF CATANDALA BRIDGE, IBAAN, | Region IV-A | Batangas 4th DEO | Completed | ₱93.6M | 100% | High risk64 | —-0.054 |
| 68 | 23DB0090ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS -FLOOD MANAGEMENT PROGRAM - CONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PANSIPIT RIVER, LEMERY,BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 69 | 20DF0022ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS,FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF REVETMENT ALONG ILANG ILANG RIVER, BRGY. SAN ANTONIO 2, | Region IV-A | Cavite 1st DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 70 | 18DB0016CONSTRUCTION OF SLOPE PROTECTION USING GABION FOR THE HEAVILY DAMAGED LIAN BRIDGE SLOPE PROTECTION, LIAN RIVER AT NASUGBU, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 71 | 18DB0015CONSTRUCTION OF SLOPE PROTECTION USING GABION FOR THE HEAVILY DAMAGED LIAN BRIDGE SLOPE PROTECTION, | Region IV-A | Batangas 1st DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.076 |
| 72 | 19DD0486LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL BRIDGES, CONSTRUCTION OF BRIDGE AND APPROACHES CONNECTING ALTERNATE ROUTE AT BARANGAY KAYUMANGGI AND ANILAO, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱96M | 100% | High risk64 | —-0.054 |
| 73 | 24DD0059ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF REVETMENT ALONG LAWAYE RIV | Region IV-A | Batangas 4th DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 74 | 22DD0001ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF REVETMENT ALONG MALAKING ILO | Region IV-A | Batangas 4th DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 75 | 23DD0066ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF REVETMENT ALONG MALAKING IL | Region IV-A | Batangas 4th DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.078 |