Contractor dossier
414 projects on file, including joint ventures this contractor is part of.
Total projects
414
Total budget
₱28B
Average progress
95.5%
Completion rate
85.0%
Average risk score
52.2
Medium risk on average, out of 100
Flagged as unusual
11
2.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 248 | ₱17.9B | 51.8 | 5 | 95.4% |
| Region VII | 164 | ₱10B | 52.8 | 6 | 95.7% |
| Negros Island Region | 2 | ₱145.5M | 55.9 | 0 | 83.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 292 | ₱19.1B | 50.0 | 1 | 96.1% |
| Flood Control and Drainage | 65 | ₱3.9B | 51.5 | 0 | 96.6% |
| Bridges | 19 | ₱987.3M | 48.0 | 0 | 95.3% |
| OTHER | 18 | ₱1.4B | 73.2 | 5 | 97.9% |
| Bridges, Roads | 10 | ₱1.6B | 56.6 | 1 | 90.0% |
| GAA 2025 OO-1 | 5 | ₱509M | 93.1 | 3 | 63.4% |
| GAA 2025 SSP | 3 | ₱193.8M | 91.0 | 1 | 73.0% |
| GAA 2025 OO-2 | 1 | ₱124.1M | 92.1 | 0 | 71.8% |
| Water Provision and Storage | 1 | ₱109.6M | 59.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25H00126CSSP PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST OF BRGY BUNGA-LAMAC-POBLACION ROAD LEADING TO RESORT AND CAVE | Region VII | Region VII | On-Going | ₱141.8M | 19% | High risk96 | Flagged0.048 |
| 25H00046ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD (PHASE 6), CEBU | Region VII | Region VII | On-Going | ₱106M | 47% | High risk95 | Flagged0.021 |
| 25K00049CONSTRUCTION OF BY-PASS AND DIVERSION ROADS JCT. CDO - TALAKAG ROAD/ MACAPAGAL DRIVE - UPPER CARMEN - PATAG - JCT. BCIR/ KAUSWAGAN DIVERSION ROAD, PACKAGE 8, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱62.2M | 61% | High risk94 | —-0.000 |
| 25K00088CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY BYPASS ROAD - CARMEN PUERTO SECTION (CLIMBING LANES), PACKAGE 2, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱180.2M | 26% | High risk93 | Flagged0.028 |
| 25HI0006OO1: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - CEBU NORTH HAGNAYA WHARF RD - K0042 + 896 - K0043 + 000, K0045 + 699 - K0047 + 000, K0047 + 000 - K0047 + 500, K0060 + 215 - K0060 + 792, K0060 + 806 - K0062 + 000, K0073 + 205 - | Region VII | Cebu 5th DEO | On-Going | ₱140.1M | 100% | High risk93 | Flagged0.011 |
| 25KC0063CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TICALAAN-ILIGAN RD. (MAMAON-RAGONGON SECTION), (UPSTREAM AND DOWNSTREAM) OF LOWER PIGCUTIN BRIDGE, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱124.1M | 72% | High risk92 | —-0.006 |
| 25KC0034PAVING OF UNPAVED ROADS ALONG JCT. SH - MANOLO FORTICH-LIBONA-INDAHAG ROAD K1476+557-K1476+826, LIBONA, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱20.4M | 83% | High risk91 | —-0.009 |
| 25KC0011INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENTMARKINGS, ROAD SIGNS) ALONG JCT. SH-MANOLO FORTICH-LIBONA-INDAHAG RD. - K1449+042-K1454+062, K1454+832-K1457+000, K1459+320-K1470+000, MANOLO FORTICH & LIBONA, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱19.1M | 100% | High risk89 | —-0.030 |
| 24K00529CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALATUKAN RIVER, PACKAGE 1, BALINGASAG, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱143.9M | 72% | High risk89 | Flagged0.069 |
| 25KC0023INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENT MARKINGS, ROAD SIGNS) ALONG SAYRE HIGHWAY - K1440+000-K1444+800, K1447+650-K1454+000, K1456+800-K1458+200, K1459+000-K1463+000, K1463+850-K1466+000, K1467+200-K1468+000, K1471+000-K1472+000, MA | Region X | Bukidnon 3rd DEO | Completed | ₱32.8M | 100% | High risk88 | —-0.031 |
| 24K00109CONST. OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO,CDO OLD AIRPORT ROAD DIVERSION ROAD(PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD)PHASE II, PACKAGE 19, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱121.7M | 100% | High risk78 | Flagged0.004 |
| 18H00039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYATEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, PRIMARY ROADS, N. BACALSO AVE. (CEBU SOUTH RD). INCL. ROW K0057+(-815)- K0057+793, K0057+799-K0059+000, K0059+000-K0060+000 | Region VII | Region VII | Completed | ₱150.6M | 100% | High risk77 | Flagged0.010 |
| 24KC0009ROAD WIDENING ALONG SAYRE HIGHWAY - K1445+075-K1445+885, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱70.2M | 100% | High risk75 | —-0.036 |
| 22K00312CONST. OF MISSING LINKS/NEW ROADS, EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON (JCT. CDO CITY - CAMP KIBANTAN - DOMINOROG ROAD TO JCT. MANOLO FORTICH - LIBONA - INDAHAG ROAD) (LIBONA - BAUNGON SECTION), PACKAGE 8, BUKIDNON | Region X | Region X | Completed | ₱65.5M | 100% | High risk75 | —-0.029 |
| 22K00346CONST. OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO, CDO-OLD AIRPORT ROAD DIVERSION ROAD (PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD) PHASE II, PACKAGE 12, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱59.3M | 100% | High risk75 | —-0.026 |
| 22K00311CONST. OF MISSING LINKS/NEW ROADS, TAGOLOAN-MISAMIS ORIENTAL BDRY, PACKAGE 5, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱52.3M | 100% | High risk74 | —-0.032 |
| 17H00019MF0-1 NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT, OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SECONDARY ROADS, CEBU NORTH HAGNAYA WHARF ROAD | Region VII | Region VII | Completed | ₱95M | 100% | High risk73 | —-0.018 |
| 19H00006ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, CEBU NORTH HAGNAYA, WHARF RD-K0063+000-K0064+300, K0074+420- | Region VII | Region VII | Completed | ₱106.1M | 100% | High risk72 | —-0.006 |
| 24KC0121ROAD WIDENING ALONG SAYRE HIGHWAY - K1440+800-K1440+890, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱9.9M | 100% | High risk72 | —-0.040 |
| 24KC0119ROAD WIDENING ALONG SAYRE HIGHWAY - K1441+1063-K1442+100, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱22.1M | 100% | High risk72 | —-0.041 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24K00529CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALATUKAN RIVER, PACKAGE 1, BALINGASAG, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱143.9M | 72% | High risk89 | Flagged0.069 |
| 25H00126CSSP PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST OF BRGY BUNGA-LAMAC-POBLACION ROAD LEADING TO RESORT AND CAVE | Region VII | Region VII | On-Going | ₱141.8M | 19% | High risk96 | Flagged0.048 |
| 24K00549CONSTRUCTION OF SAYRE HIGHWAY - K1441 + 415 - K1441 + 906, K1442 + 015 - K1443 + 220, K01443 + 550 - K1444 + 185, K1451 + 250 - K1451 + 558, K1465 + 073 - K1466 + 000, K1467 + 000 - K1468 + 025, K1469 + 202 - K1470 + 012 | Region X | Region X | On-Going | ₱238M | 100% | High risk64 | Flagged0.034 |
| 25K00088CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY BYPASS ROAD - CARMEN PUERTO SECTION (CLIMBING LANES), PACKAGE 2, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱180.2M | 26% | High risk93 | Flagged0.028 |
| 25H00046ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD (PHASE 6), CEBU | Region VII | Region VII | On-Going | ₱106M | 47% | High risk95 | Flagged0.021 |
| 24H00034ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD LEADING TO INTERNATIONAL CONTAINER PORT, CEBU | Region VII | Region VII | On-Going | ₱250.6M | 0% | High risk66 | Flagged0.011 |
| 25HI0006OO1: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - CEBU NORTH HAGNAYA WHARF RD - K0042 + 896 - K0043 + 000, K0045 + 699 - K0047 + 000, K0047 + 000 - K0047 + 500, K0060 + 215 - K0060 + 792, K0060 + 806 - K0062 + 000, K0073 + 205 - | Region VII | Cebu 5th DEO | On-Going | ₱140.1M | 100% | High risk93 | Flagged0.011 |
| 18H00039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYATEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, PRIMARY ROADS, N. BACALSO AVE. (CEBU SOUTH RD). INCL. ROW K0057+(-815)- K0057+793, K0057+799-K0059+000, K0059+000-K0060+000 | Region VII | Region VII | Completed | ₱150.6M | 100% | High risk77 | Flagged0.010 |
| 23K00081CONST. OF BY_PASS AND DIVERSION ROADS ,CDO-NEW EASTERN DIVERSION ROAD (JCT. SOUTH DIVERSION ROAD/ MANDUMOL-NAZARETH- CAMAMAN-AN-JUSTO RAMONAL-JCT. J.R BORJA-LKKS-BCIR/ LAPASAN), PACKAGE 5, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱38.7M | 90% | High risk71 | Flagged0.007 |
| 18H00042ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, CEBU NORTH HAGNAYA WHARF ROAD - K0034+648-K0035+000, K0052+000-K0055+648, CEBU PROVINCE | Region VII | Region VII | Completed | ₱131.5M | 100% | High risk71 | Flagged0.006 |
| 24K00109CONST. OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO,CDO OLD AIRPORT ROAD DIVERSION ROAD(PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD)PHASE II, PACKAGE 19, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱121.7M | 100% | High risk78 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 226 | 22HF0054CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY ALEGRIA, STA. 5+587 - STA. 6+240, TUBURAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱48.7M | 100% | Medium risk50 | —-0.069 |
| 227 | 20KC0052ROAD WIDENING ALONG JCT. SH-MANOLO FORTICH-LIBONA-INDAHAG ROAD K1449+042-K1451+766, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱54.9M | 100% | Medium risk50 | —-0.090 |
| 228 | 24K00065CONSTRUCTION OF MISSING LINKS/NEW ROADS, ILIGAN CITY-CAGAYAN DE ORO CITY ALTERNATE ROUTE, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱47.7M | 100% | Medium risk50 | —-0.025 |
| 229 | 21K00016CONSTRUCTION OF MISSING LINKS/NEW ROADS, CONSTRUCTION OF EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON (JCT. CDO CITY-CAMP KIBARITAN-DOMINOROG ROAD TO JCT. MANOLO FORTICH-LIBONA-INDAHAG ROAD) (LIBONA-BAUNGON SECTION), BUKIDNON | Region X | Region X | Completed | ₱54.8M | 100% | Medium risk50 | —-0.080 |
| 230 | 22HF0050CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT LANGOYON RIVER, SECTION 1: STA. 0+362 - STA. 0+602, SECTION 2: STA. 2+320 - STA. 2+520, BRGY. MANGGA, TUBURAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱48.9M | 100% | Medium risk50 | —-0.075 |
| 231 | 22HF0095CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AT LANGOYON RIVER, BARANGAY POBLACION 8, UPSTREAM, STA. 2+520 - STA. 2+721, TUBURAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱48.9M | 100% | Medium risk50 | —-0.075 |
| 232 | 24HF0007CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT SAPANGDAKU RIVER, BARANGAY DAANGLUNGSOD - BARANGAY DUMLOG, TOLEDO CITY, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.078 |
| 233 | 24K00174CONST. OF BYPASS AND DIVERSION ROADS-CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO, CDO- OLD AIRPORT ROAD DIVERSION ROAD (PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD) PHASE II, PACKAGE 20, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱47.6M | 100% | Medium risk50 | —-0.030 |
| 234 | 23HF0002CONSTRUCTION OF SHORELINE PROTECTION AT BARANGAY TALAVERA ALONG TOLEDO-TABUELAN-SN REMIGIO RD, TOLEDO CITY, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱48.9M | 100% | Medium risk50 | —-0.078 |
| 235 | 23HI0021CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG CEBU NORTH HAGNAYA WHARF RD - K0023+500 - K0023+580, K0028+740 - K0029+590, K0032+286 - K0032+397 | Region VII | Cebu 5th DEO | Completed | ₱48.9M | 100% | Medium risk50 | —-0.094 |
| 236 | 21HF0011CONSTRUCTION OF SHORELINE PROTECTION (TETRAPOD), BARANGAY PONDOL, BALAMBAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.077 |
| 237 | 21KL0018ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS, BUTUAN CITY - CAGAYAN DE ORO CITY - ILIGAN CITY ROAD - K1405+136 - K1405+427.50, K1453+224 - K1453+870, K1466+563 - K1467+217, K1472+734 - K1473+373, K1473+399 - K1473+466, K1497+302 - K1497+436 | Region X | Misamis Oriental 2nd DEO | Completed | ₱52.1M | 100% | Medium risk50 | —-0.094 |
| 238 | 18KC0034CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAYRE HIGHWAY, ALAE-KISOLON ROAD (DAMAY SECTION) WITH SLOPE PROTECTION, SAN VICENTE, SUMILAO, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱64.1M | 100% | Medium risk50 | —-0.074 |
| 239 | 24KD0041CONSTRUCTION OF ACCESS ROAD LEADING TO GUADALUPE SHRINE, BARANGAY BALUBAL, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱47.5M | 100% | Medium risk49 | —-0.094 |
| 240 | 19KA0044RECONSTRUCTION TO CONCRETE PAVEMENT - ALONG SAYRE HIGHWAY (S00639MN) K1507 + 030 TO K1508 + 290MALAYBALAY CITY, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱47.8M | 100% | Medium risk49 | —-0.091 |
| 241 | 22K00082CONSTRUCTION OF BYPASS AND DIVERSION ROADS, JCT. CDO TALAKAG ROAD/ MACAPAGAL DRIVE-UPPER CARMEN-PATAG-JCT. BCIR/ KAUSWAGAN, PACKAGE 5, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱47.7M | 100% | Medium risk49 | —-0.079 |
| 242 | 18KH0036ASSET PRESERVATION REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIP, SLOPE, COLLAPSE AND LANDSLIDE SECONDARY ROAD: CDO-AIRPORT-BUKIDNON ROAD K1440+909.00 - K1441+125.00, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱48M | 100% | Medium risk49 | —-0.093 |
| 243 | 17K00225IMPRVT./WIDENING OF NATL RDS BCIR-K1375+510-K1375+840-K1381+493,MIS.OR 1ST LD | Region X | Region X | Completed | ₱148.7M | 100% | Medium risk49 | —-0.042 |
| 244 | 23KK0082CONSTRUCTION OF FLOOD CONTROL ALONG MANGISKIS RIVER DOWNSTREAM, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱66M | 100% | Medium risk49 | —-0.073 |
| 245 | 19KH0017ASSET PRESERVATION PREVENTIVE MAINTENANCE - SECONDARY ROADS CDO-AIRPORT-BUKIDNON RD - K1440+478 - K1443+680 | Region X | Cagayan de Oro City 1st DEO | Completed | ₱47.2M | 100% | Medium risk49 | —-0.094 |
| 246 | 21K00036ROAD WIDENING, KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) RD - K1578+500 - K1580+037 | Region X | Region X | Completed | ₱48.4M | 100% | Medium risk49 | —-0.086 |
| 247 | 25KC0106CONSTRUCTION OF JCT. CDO-DOMINOROG-CAMP KIBARITAN RD. TINONTONGAN, LANTUD, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱48.9M | 17% | Medium risk49 | —-0.033 |
| 248 | 21KK0049ROAD WIDENING - PRIMARY ROADS - BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1302 + (-600) - K1302 + 992, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.089 |
| 249 | 20KK0023ROAD WIDENING - PRIMARY ROADS - BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1299 + 700 - K1301 + 300, MAGSAYSAY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.090 |
| 250 | 20KK0022ROAD WIDENING - PRIMARY ROADS - BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1298 + 000 - K1299 + 700, MAGSAYSAY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.090 |