Contractor dossier
414 projects on file, including joint ventures this contractor is part of.
Total projects
414
Total budget
₱28B
Average progress
95.5%
Completion rate
85.0%
Average risk score
52.2
Medium risk on average, out of 100
Flagged as unusual
11
2.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 248 | ₱17.9B | 51.8 | 5 | 95.4% |
| Region VII | 164 | ₱10B | 52.8 | 6 | 95.7% |
| Negros Island Region | 2 | ₱145.5M | 55.9 | 0 | 83.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 292 | ₱19.1B | 50.0 | 1 | 96.1% |
| Flood Control and Drainage | 65 | ₱3.9B | 51.5 | 0 | 96.6% |
| Bridges | 19 | ₱987.3M | 48.0 | 0 | 95.3% |
| OTHER | 18 | ₱1.4B | 73.2 | 5 | 97.9% |
| Bridges, Roads | 10 | ₱1.6B | 56.6 | 1 | 90.0% |
| GAA 2025 OO-1 | 5 | ₱509M | 93.1 | 3 | 63.4% |
| GAA 2025 SSP | 3 | ₱193.8M | 91.0 | 1 | 73.0% |
| GAA 2025 OO-2 | 1 | ₱124.1M | 92.1 | 0 | 71.8% |
| Water Provision and Storage | 1 | ₱109.6M | 59.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25H00126CSSP PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST OF BRGY BUNGA-LAMAC-POBLACION ROAD LEADING TO RESORT AND CAVE | Region VII | Region VII | On-Going | ₱141.8M | 19% | High risk96 | Flagged0.048 |
| 25H00046ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD (PHASE 6), CEBU | Region VII | Region VII | On-Going | ₱106M | 47% | High risk95 | Flagged0.021 |
| 25K00049CONSTRUCTION OF BY-PASS AND DIVERSION ROADS JCT. CDO - TALAKAG ROAD/ MACAPAGAL DRIVE - UPPER CARMEN - PATAG - JCT. BCIR/ KAUSWAGAN DIVERSION ROAD, PACKAGE 8, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱62.2M | 61% | High risk94 | —-0.000 |
| 25K00088CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY BYPASS ROAD - CARMEN PUERTO SECTION (CLIMBING LANES), PACKAGE 2, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱180.2M | 26% | High risk93 | Flagged0.028 |
| 25HI0006OO1: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - CEBU NORTH HAGNAYA WHARF RD - K0042 + 896 - K0043 + 000, K0045 + 699 - K0047 + 000, K0047 + 000 - K0047 + 500, K0060 + 215 - K0060 + 792, K0060 + 806 - K0062 + 000, K0073 + 205 - | Region VII | Cebu 5th DEO | On-Going | ₱140.1M | 100% | High risk93 | Flagged0.011 |
| 25KC0063CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TICALAAN-ILIGAN RD. (MAMAON-RAGONGON SECTION), (UPSTREAM AND DOWNSTREAM) OF LOWER PIGCUTIN BRIDGE, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱124.1M | 72% | High risk92 | —-0.006 |
| 25KC0034PAVING OF UNPAVED ROADS ALONG JCT. SH - MANOLO FORTICH-LIBONA-INDAHAG ROAD K1476+557-K1476+826, LIBONA, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱20.4M | 83% | High risk91 | —-0.009 |
| 25KC0011INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENTMARKINGS, ROAD SIGNS) ALONG JCT. SH-MANOLO FORTICH-LIBONA-INDAHAG RD. - K1449+042-K1454+062, K1454+832-K1457+000, K1459+320-K1470+000, MANOLO FORTICH & LIBONA, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱19.1M | 100% | High risk89 | —-0.030 |
| 24K00529CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALATUKAN RIVER, PACKAGE 1, BALINGASAG, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱143.9M | 72% | High risk89 | Flagged0.069 |
| 25KC0023INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENT MARKINGS, ROAD SIGNS) ALONG SAYRE HIGHWAY - K1440+000-K1444+800, K1447+650-K1454+000, K1456+800-K1458+200, K1459+000-K1463+000, K1463+850-K1466+000, K1467+200-K1468+000, K1471+000-K1472+000, MA | Region X | Bukidnon 3rd DEO | Completed | ₱32.8M | 100% | High risk88 | —-0.031 |
| 24K00109CONST. OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO,CDO OLD AIRPORT ROAD DIVERSION ROAD(PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD)PHASE II, PACKAGE 19, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱121.7M | 100% | High risk78 | Flagged0.004 |
| 18H00039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYATEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, PRIMARY ROADS, N. BACALSO AVE. (CEBU SOUTH RD). INCL. ROW K0057+(-815)- K0057+793, K0057+799-K0059+000, K0059+000-K0060+000 | Region VII | Region VII | Completed | ₱150.6M | 100% | High risk77 | Flagged0.010 |
| 24KC0009ROAD WIDENING ALONG SAYRE HIGHWAY - K1445+075-K1445+885, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱70.2M | 100% | High risk75 | —-0.036 |
| 22K00312CONST. OF MISSING LINKS/NEW ROADS, EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON (JCT. CDO CITY - CAMP KIBANTAN - DOMINOROG ROAD TO JCT. MANOLO FORTICH - LIBONA - INDAHAG ROAD) (LIBONA - BAUNGON SECTION), PACKAGE 8, BUKIDNON | Region X | Region X | Completed | ₱65.5M | 100% | High risk75 | —-0.029 |
| 22K00346CONST. OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO, CDO-OLD AIRPORT ROAD DIVERSION ROAD (PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD) PHASE II, PACKAGE 12, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱59.3M | 100% | High risk75 | —-0.026 |
| 22K00311CONST. OF MISSING LINKS/NEW ROADS, TAGOLOAN-MISAMIS ORIENTAL BDRY, PACKAGE 5, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱52.3M | 100% | High risk74 | —-0.032 |
| 17H00019MF0-1 NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT, OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SECONDARY ROADS, CEBU NORTH HAGNAYA WHARF ROAD | Region VII | Region VII | Completed | ₱95M | 100% | High risk73 | —-0.018 |
| 19H00006ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, CEBU NORTH HAGNAYA, WHARF RD-K0063+000-K0064+300, K0074+420- | Region VII | Region VII | Completed | ₱106.1M | 100% | High risk72 | —-0.006 |
| 24KC0121ROAD WIDENING ALONG SAYRE HIGHWAY - K1440+800-K1440+890, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱9.9M | 100% | High risk72 | —-0.040 |
| 24KC0119ROAD WIDENING ALONG SAYRE HIGHWAY - K1441+1063-K1442+100, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱22.1M | 100% | High risk72 | —-0.041 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24K00529CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALATUKAN RIVER, PACKAGE 1, BALINGASAG, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱143.9M | 72% | High risk89 | Flagged0.069 |
| 25H00126CSSP PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST OF BRGY BUNGA-LAMAC-POBLACION ROAD LEADING TO RESORT AND CAVE | Region VII | Region VII | On-Going | ₱141.8M | 19% | High risk96 | Flagged0.048 |
| 24K00549CONSTRUCTION OF SAYRE HIGHWAY - K1441 + 415 - K1441 + 906, K1442 + 015 - K1443 + 220, K01443 + 550 - K1444 + 185, K1451 + 250 - K1451 + 558, K1465 + 073 - K1466 + 000, K1467 + 000 - K1468 + 025, K1469 + 202 - K1470 + 012 | Region X | Region X | On-Going | ₱238M | 100% | High risk64 | Flagged0.034 |
| 25K00088CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY BYPASS ROAD - CARMEN PUERTO SECTION (CLIMBING LANES), PACKAGE 2, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱180.2M | 26% | High risk93 | Flagged0.028 |
| 25H00046ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD (PHASE 6), CEBU | Region VII | Region VII | On-Going | ₱106M | 47% | High risk95 | Flagged0.021 |
| 24H00034ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD LEADING TO INTERNATIONAL CONTAINER PORT, CEBU | Region VII | Region VII | On-Going | ₱250.6M | 0% | High risk66 | Flagged0.011 |
| 25HI0006OO1: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - CEBU NORTH HAGNAYA WHARF RD - K0042 + 896 - K0043 + 000, K0045 + 699 - K0047 + 000, K0047 + 000 - K0047 + 500, K0060 + 215 - K0060 + 792, K0060 + 806 - K0062 + 000, K0073 + 205 - | Region VII | Cebu 5th DEO | On-Going | ₱140.1M | 100% | High risk93 | Flagged0.011 |
| 18H00039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYATEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, PRIMARY ROADS, N. BACALSO AVE. (CEBU SOUTH RD). INCL. ROW K0057+(-815)- K0057+793, K0057+799-K0059+000, K0059+000-K0060+000 | Region VII | Region VII | Completed | ₱150.6M | 100% | High risk77 | Flagged0.010 |
| 23K00081CONST. OF BY_PASS AND DIVERSION ROADS ,CDO-NEW EASTERN DIVERSION ROAD (JCT. SOUTH DIVERSION ROAD/ MANDUMOL-NAZARETH- CAMAMAN-AN-JUSTO RAMONAL-JCT. J.R BORJA-LKKS-BCIR/ LAPASAN), PACKAGE 5, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱38.7M | 90% | High risk71 | Flagged0.007 |
| 18H00042ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, CEBU NORTH HAGNAYA WHARF ROAD - K0034+648-K0035+000, K0052+000-K0055+648, CEBU PROVINCE | Region VII | Region VII | Completed | ₱131.5M | 100% | High risk71 | Flagged0.006 |
| 24K00109CONST. OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO,CDO OLD AIRPORT ROAD DIVERSION ROAD(PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD)PHASE II, PACKAGE 19, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱121.7M | 100% | High risk78 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 276 | 18HA0008CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-LOOC (BINLOD)-BIL-ISAN-CROSSING TANGNAN LEADING TO VERANEANTE RESORT, MOMO BEACH AND HOUSE, AND AYACA CONDO-RESIDENNCE RESORT, BRGY. LOOC, PANGLAO, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱40.8M | 100% | Medium risk47 | —-0.094 |
| 277 | 25HF0070ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - CEBU - TOLEDO WHARF RD (ULING-TOLEDO WHARF) - K00S2 +-000 - K0052 + 441 | Region VII | Cebu 3rd DEO | On-Going | ₱28.4M | 93% | Medium risk47 | —-0.061 |
| 278 | 25HH0139OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-CEBU BALAMBAN TRANSCENTRAL HIGHWAY-K0016+077-K0016+127, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱43.2M | 30% | Medium risk47 | —-0.040 |
| 279 | 24HH0110OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM -REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - CEBU-BALAMBAN TRANSCENTRAL HIGHWAY - K0015+683-K0015+727, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱43M | 44% | Medium risk47 | —-0.042 |
| 280 | 24KA0131CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY SINANGLANAN, MALAYBALAY CITY, BUKIDNON, BRGY. SINANGLANAN, MALAYBALAY CITY, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.075 |
| 281 | 18HA0012CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-TANGNAN-ACASIA ROAD, PANGLAO IN SUPPORT OF THE AGRIBUSINESS INDUSTRY, PANGLAO, BOHOL | Region VII | Bohol 1st DEO | Completed | ₱38.3M | 100% | Medium risk47 | —-0.094 |
| 282 | 22KC0037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CDO CITY DOMINOROG CAMP KIBARITAN RD. (UPSTREAM AND DOWNSTREAM OF TAL-UBAN BRIDGE), PHASE 3, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.079 |
| 283 | 24HF0009REHABILITATION OF FLOOD MITIGATION STRUCTURE AT GUINABASAN RIVER, BARANGAY STA. LUCIA, ASTURIAS, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱19.2M | 100% | Medium risk47 | —-0.078 |
| 284 | 18HA0026CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONE-TINAGO-BIKING ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY, DAUIS, BOHOL. STA. 008+124-STA.0010+325.35 | Region VII | Bohol 1st DEO | Completed | ₱40.9M | 100% | Medium risk47 | —-0.094 |
| 285 | 21K00070WIDENING OF PERMANENT BRIDGES, NAMNAM BRIDGE(B01652MN)ALONG KAPALONG-TALAINGOD-VALENCIA BUKIDNON RD | Region X | Region X | Completed | ₱29.3M | 100% | Medium risk47 | —-0.052 |
| 286 | 22HF0047CONSTRUCTION OF SHORELINE PROTECTION, BARANGAY DAANLUNGSOD, TUBURAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱39.1M | 100% | Medium risk47 | —-0.067 |
| 287 | 23HF0031CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT CARIDAD RIVER, BARANGAY CARIDAD - BARANGAY JAGBUAYA, TUBURAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱44M | 100% | Medium risk47 | —-0.078 |
| 288 | 18HF0115CONSTRUCTION OF REVETMENT (RUBBLE CONCRETE) AT LANGOYON RIVER BASIN, STA. 1+100-STA. 1+372, BRGY. LANGOYON, TUBURAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱37.1M | 100% | Medium risk47 | —-0.078 |
| 289 | 23HF0020CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT LANGOYON RIVER, BARANGAY ALEGRIA - BARANGAY COGON, TUBURAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱43M | 100% | Medium risk47 | —-0.078 |
| 290 | 17K00166IMPRVT./WIDENING OF NATL ROADS, BCIR, MIS. OR. 1ST | Region X | Region X | Completed | ₱118.3M | 100% | Medium risk47 | —-0.054 |
| 291 | 25HF0014ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TAGAMAKAN CIS, ASTURIAS, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱14.5M | 100% | Medium risk47 | —-0.078 |
| 292 | 23HF0026REHABILITATION OF FLOOD MITIGATION STRUCTURE AT GUINABASAN RIVER, BARANGAY STA. LUCIA, ASTURIAS, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱18.5M | 100% | Medium risk47 | —-0.078 |
| 293 | 22HF0002ASSET PRESERVATION PROGRAM - CONSTRUCTION/REHABILITATION OF DRAINAGE ALONG CEBU-TOLEDO WHARF RD (ULING-TOLEDO WHARF) - K0048 + 793 - K0049 + 250 | Region VII | Cebu 3rd DEO | Completed | ₱18.6M | 100% | Medium risk47 | —-0.090 |
| 294 | 25K00008WIDENING OF PERMANENT BRIDGES NAMNAM BR. (B01652MN) ALONG KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) RD | Region X | Region X | On-Going | ₱25M | 96% | Medium risk47 | —-0.028 |
| 295 | 18HF0035REHABILITATION/RECONSTRUCTION OF TOLEDO-PINAMUNGAJAN-ALOGUINSAN-MANTALONGON ROAD (1) K0062+000 - K0062+981; (2) K0083+000 - K0083+097, PINAMUNGAJAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱22.1M | 100% | Medium risk47 | —-0.097 |
| 296 | 23HF0018REHABILITATION OF FLOOD MITIGATION STRUCTURE AT CARIDAD RIVER ALONG TOLEDO-TABUELAN-SN REMIGIO RD, BARANGAY JAGBUAYA, TUBURAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱19.5M | 100% | Medium risk47 | —-0.077 |
| 297 | 18HI0043REPAIR/REHAB OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS (CNHWR) K0069+850-K0 | Region VII | Cebu 5th DEO | Completed | ₱41.4M | 100% | Medium risk47 | —-0.078 |
| 298 | 18HI0015REHABILITATION OF PAVED ROAD, CONSOLACION-TAYUD-LILOAN ROAD, (S00373CB) CHAINAGE 2000 -CHAINAGE 3216, CHAINAGE 3466 - CHAINAGE 3712 | Region VII | Cebu 5th DEO | Completed | ₱41.2M | 100% | Medium risk47 | —-0.067 |
| 299 | 21K00258CONST. OF BYPASS AND DIVERSION ROADS, JCT. CDO-TALAKAG ROAD/ MACAPAGAL DRIVE-UPPER CARMEN-PATAG-JCT. BCIR/ KAUSWAGAN DIVERSION ROAD, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱45.7M | 100% | Medium risk47 | —-0.051 |
| 300 | 23HF0033REHABILITATION/ RECONSTRUCTION/ UPGRADING OF NAGA-ULING RD - K0040 + 440 - K0040 + 780 | Region VII | Cebu 3rd DEO | Completed | ₱14.7M | 100% | Medium risk47 | —-0.098 |