Opening the dossier…
Opening the dossier…
Contractor dossier
414 projects on file, including joint ventures this contractor is part of.
Total projects
414
Total budget
₱28B
Average progress
95.5%
Completion rate
85.0%
Average risk score
52.2
Medium risk on average, out of 100
Flagged as unusual
11
2.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 248 | ₱17.9B | 51.8 | 5 | 95.4% |
| Region VII | 164 | ₱10B | 52.8 | 6 | 95.7% |
| Negros Island Region | 2 | ₱145.5M | 55.9 | 0 | 83.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 292 | ₱19.1B | 50.0 | 1 | 96.1% |
| Flood Control and Drainage | 65 | ₱3.9B | 51.5 | 0 | 96.6% |
| Bridges | 19 | ₱987.3M | 48.0 | 0 | 95.3% |
| OTHER | 18 | ₱1.4B | 73.2 | 5 | 97.9% |
| Bridges, Roads | 10 | ₱1.6B | 56.6 | 1 | 90.0% |
| GAA 2025 OO-1 | 5 | ₱509M | 93.1 | 3 | 63.4% |
| GAA 2025 SSP | 3 | ₱193.8M | 91.0 | 1 | 73.0% |
| GAA 2025 OO-2 | 1 | ₱124.1M | 92.1 | 0 | 71.8% |
| Water Provision and Storage | 1 | ₱109.6M | 59.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25H00126CSSP PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST OF BRGY BUNGA-LAMAC-POBLACION ROAD LEADING TO RESORT AND CAVE | Region VII | Region VII | On-Going | ₱141.8M | 19% | High risk96 | Flagged0.048 |
| 25H00046ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD (PHASE 6), CEBU | Region VII | Region VII | On-Going | ₱106M | 47% | High risk95 | Flagged0.021 |
| 25K00049CONSTRUCTION OF BY-PASS AND DIVERSION ROADS JCT. CDO - TALAKAG ROAD/ MACAPAGAL DRIVE - UPPER CARMEN - PATAG - JCT. BCIR/ KAUSWAGAN DIVERSION ROAD, PACKAGE 8, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱62.2M | 61% | High risk94 | —-0.000 |
| 25K00088CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY BYPASS ROAD - CARMEN PUERTO SECTION (CLIMBING LANES), PACKAGE 2, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱180.2M | 26% | High risk93 | Flagged0.028 |
| 25HI0006OO1: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - CEBU NORTH HAGNAYA WHARF RD - K0042 + 896 - K0043 + 000, K0045 + 699 - K0047 + 000, K0047 + 000 - K0047 + 500, K0060 + 215 - K0060 + 792, K0060 + 806 - K0062 + 000, K0073 + 205 - | Region VII | Cebu 5th DEO | On-Going | ₱140.1M | 100% | High risk93 | Flagged0.011 |
| 25KC0063CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TICALAAN-ILIGAN RD. (MAMAON-RAGONGON SECTION), (UPSTREAM AND DOWNSTREAM) OF LOWER PIGCUTIN BRIDGE, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱124.1M | 72% | High risk92 | —-0.006 |
| 25KC0034PAVING OF UNPAVED ROADS ALONG JCT. SH - MANOLO FORTICH-LIBONA-INDAHAG ROAD K1476+557-K1476+826, LIBONA, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱20.4M | 83% | High risk91 | —-0.009 |
| 25KC0011INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENTMARKINGS, ROAD SIGNS) ALONG JCT. SH-MANOLO FORTICH-LIBONA-INDAHAG RD. - K1449+042-K1454+062, K1454+832-K1457+000, K1459+320-K1470+000, MANOLO FORTICH & LIBONA, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱19.1M | 100% | High risk89 | —-0.030 |
| 24K00529CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALATUKAN RIVER, PACKAGE 1, BALINGASAG, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱143.9M | 72% | High risk89 | Flagged0.069 |
| 25KC0023INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENT MARKINGS, ROAD SIGNS) ALONG SAYRE HIGHWAY - K1440+000-K1444+800, K1447+650-K1454+000, K1456+800-K1458+200, K1459+000-K1463+000, K1463+850-K1466+000, K1467+200-K1468+000, K1471+000-K1472+000, MA | Region X | Bukidnon 3rd DEO | Completed | ₱32.8M | 100% | High risk88 | —-0.031 |
| 24K00109CONST. OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO,CDO OLD AIRPORT ROAD DIVERSION ROAD(PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD)PHASE II, PACKAGE 19, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱121.7M | 100% | High risk78 | Flagged0.004 |
| 18H00039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYATEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, PRIMARY ROADS, N. BACALSO AVE. (CEBU SOUTH RD). INCL. ROW K0057+(-815)- K0057+793, K0057+799-K0059+000, K0059+000-K0060+000 | Region VII | Region VII | Completed | ₱150.6M | 100% | High risk77 | Flagged0.010 |
| 24KC0009ROAD WIDENING ALONG SAYRE HIGHWAY - K1445+075-K1445+885, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱70.2M | 100% | High risk75 | —-0.036 |
| 22K00312CONST. OF MISSING LINKS/NEW ROADS, EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON (JCT. CDO CITY - CAMP KIBANTAN - DOMINOROG ROAD TO JCT. MANOLO FORTICH - LIBONA - INDAHAG ROAD) (LIBONA - BAUNGON SECTION), PACKAGE 8, BUKIDNON | Region X | Region X | Completed | ₱65.5M | 100% | High risk75 | —-0.029 |
| 22K00346CONST. OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO, CDO-OLD AIRPORT ROAD DIVERSION ROAD (PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD) PHASE II, PACKAGE 12, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱59.3M | 100% | High risk75 | —-0.026 |
| 22K00311CONST. OF MISSING LINKS/NEW ROADS, TAGOLOAN-MISAMIS ORIENTAL BDRY, PACKAGE 5, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱52.3M | 100% | High risk74 | —-0.032 |
| 17H00019MF0-1 NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT, OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SECONDARY ROADS, CEBU NORTH HAGNAYA WHARF ROAD | Region VII | Region VII | Completed | ₱95M | 100% | High risk73 | —-0.018 |
| 19H00006ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, CEBU NORTH HAGNAYA, WHARF RD-K0063+000-K0064+300, K0074+420- | Region VII | Region VII | Completed | ₱106.1M | 100% | High risk72 | —-0.006 |
| 24KC0121ROAD WIDENING ALONG SAYRE HIGHWAY - K1440+800-K1440+890, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱9.9M | 100% | High risk72 | —-0.040 |
| 24KC0119ROAD WIDENING ALONG SAYRE HIGHWAY - K1441+1063-K1442+100, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱22.1M | 100% | High risk72 | —-0.041 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24K00529CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALATUKAN RIVER, PACKAGE 1, BALINGASAG, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱143.9M | 72% | High risk89 | Flagged0.069 |
| 25H00126CSSP PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST OF BRGY BUNGA-LAMAC-POBLACION ROAD LEADING TO RESORT AND CAVE | Region VII | Region VII | On-Going | ₱141.8M | 19% | High risk96 | Flagged0.048 |
| 24K00549CONSTRUCTION OF SAYRE HIGHWAY - K1441 + 415 - K1441 + 906, K1442 + 015 - K1443 + 220, K01443 + 550 - K1444 + 185, K1451 + 250 - K1451 + 558, K1465 + 073 - K1466 + 000, K1467 + 000 - K1468 + 025, K1469 + 202 - K1470 + 012 | Region X | Region X | On-Going | ₱238M | 100% | High risk64 | Flagged0.034 |
| 25K00088CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY BYPASS ROAD - CARMEN PUERTO SECTION (CLIMBING LANES), PACKAGE 2, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱180.2M | 26% | High risk93 | Flagged0.028 |
| 25H00046ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD (PHASE 6), CEBU | Region VII | Region VII | On-Going | ₱106M | 47% | High risk95 | Flagged0.021 |
| 24H00034ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD LEADING TO INTERNATIONAL CONTAINER PORT, CEBU | Region VII | Region VII | On-Going | ₱250.6M | 0% | High risk66 | Flagged0.011 |
| 25HI0006OO1: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - CEBU NORTH HAGNAYA WHARF RD - K0042 + 896 - K0043 + 000, K0045 + 699 - K0047 + 000, K0047 + 000 - K0047 + 500, K0060 + 215 - K0060 + 792, K0060 + 806 - K0062 + 000, K0073 + 205 - | Region VII | Cebu 5th DEO | On-Going | ₱140.1M | 100% | High risk93 | Flagged0.011 |
| 18H00039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYATEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, PRIMARY ROADS, N. BACALSO AVE. (CEBU SOUTH RD). INCL. ROW K0057+(-815)- K0057+793, K0057+799-K0059+000, K0059+000-K0060+000 | Region VII | Region VII | Completed | ₱150.6M | 100% | High risk77 | Flagged0.010 |
| 23K00081CONST. OF BY_PASS AND DIVERSION ROADS ,CDO-NEW EASTERN DIVERSION ROAD (JCT. SOUTH DIVERSION ROAD/ MANDUMOL-NAZARETH- CAMAMAN-AN-JUSTO RAMONAL-JCT. J.R BORJA-LKKS-BCIR/ LAPASAN), PACKAGE 5, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱38.7M | 90% | High risk71 | Flagged0.007 |
| 18H00042ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, CEBU NORTH HAGNAYA WHARF ROAD - K0034+648-K0035+000, K0052+000-K0055+648, CEBU PROVINCE | Region VII | Region VII | Completed | ₱131.5M | 100% | High risk71 | Flagged0.006 |
| 24K00109CONST. OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO,CDO OLD AIRPORT ROAD DIVERSION ROAD(PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD)PHASE II, PACKAGE 19, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱121.7M | 100% | High risk78 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 301 | 21HF0004ASSET PRESERVATION - PREVENTIVE MAINTENANCE OF NAGA-ULING RD - K0037+(-161) - K0038+000 | Region VII | Cebu 3rd DEO | Completed | ₱22.3M | 100% | Medium risk47 | —-0.098 |
| 302 | 20KH0027ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPECOLLAPSE, AND LANDSLIDE - TERTIARY ROADS - LUMBIA-UGUIABAN BY-PASS RD - (S00618MN) CHAINAGE490-CHAINAGE 636, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱96.5M | 100% | Medium risk47 | —-0.054 |
| 303 | 20HF0001ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE OF CEBU BALAMBAN-TRANSCENTRAL HIGHWAY, K0046+309-K0046+840, K0047+200-K0048+000 | Region VII | Cebu 3rd DEO | Completed | ₱20.9M | 100% | Medium risk47 | —-0.097 |
| 304 | 17K00396IMPRVT./WIDENING OF NATL RDS SH-K1448+059-K1451+803,BUKIDNON | Region X | Region X | Completed | ₱98.4M | 100% | Medium risk47 | —-0.052 |
| 305 | 21KC0046CONSTRUCTION OF SLOPE PROTECTION ALONG JCT. SH-MANOLO FORTICH-LIBONA-INDAHAG ROAD (UPSTREAM AND DOWNSTREAM) OF AGUSAN CANYON BRIDGE, LIBONA, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱49M | 100% | Medium risk47 | —-0.077 |
| 306 | 22K00161ROAD WIDENING-PRIMARY ROADS, BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1382 + 598 - K1383 + 328 | Region X | Region X | Completed | ₱46.7M | 100% | Medium risk47 | —-0.093 |
| 307 | 17K00133CONST./UPGRADING/REHAB.OF DRAINAGE ALONG NATL RDS BCIR,K1439+000-K1439+431.22(R/S),K1439+431.22-K144 | Region X | Region X | Completed | ₱135.5M | 100% | Medium risk47 | —-0.030 |
| 308 | 17K00108IMPRVT./WIDENING OF NATL RDS, SH K1511+516-K1515+207,BUK 2ND LD | Region X | Region X | Completed | ₱98M | 100% | Medium risk46 | —-0.050 |
| 309 | 23HF0069REHABILITATION/ RECONSTRUCTION OF TOLEDO-TABUELAN-SN REMIGIO RD - K0090 + 309 - K0090 + 373 WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE | Region VII | Cebu 3rd DEO | Completed | ₱15.6M | 100% | Medium risk46 | —-0.096 |
| 310 | 23HF0008REHABILITATION/RECONSTRUCTION OF CEBU-BALAMBAN TRANSCENTRAL HIGHWAY - K0034 + 000 - K0034 + 200 WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE | Region VII | Cebu 3rd DEO | Completed | ₱19.5M | 100% | Medium risk46 | —-0.096 |
| 311 | 18HA0015CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION-JCT. PICR TANGNAN (TABUAN) ROAD LEADING TO TABUAN BEACH AND DYNAMIC BOHOL RESORT | Region VII | Bohol 1st DEO | Completed | ₱22.7M | 100% | Medium risk46 | —-0.095 |
| 312 | 24HI0052REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS CEBU NORTH HAGNAYA WHARF RD - K0031+265 - K0031+365 | Region VII | Cebu 5th DEO | On-Going | ₱32.9M | 92% | Medium risk46 | —-0.051 |
| 313 | 25KC0040REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - GUBOTAN BR. (B00604MN) ALONG TICALAAN-ILIGAN RD. (MAMAON-RAGONGON SECT.), TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.062 |
| 314 | 24HI0055INSTALLATION OF ROAD SAFETY DEVICES AND FACILITIES ALONG CEBU NORTH HAGNAYA WHARF RD (S00249CB) - K0036+305 - K0037+305 | Region VII | Cebu 5th DEO | Completed | ₱14.6M | 100% | Medium risk46 | —-0.097 |
| 315 | 18HF0036REBLOCKING OF TOLEDO-PINAMUNGAJAN-ALOGUINSAN-MANTALONGON ROAD, K0083+097 - K0084+460 | Region VII | Cebu 3rd DEO | Completed | ₱13.7M | 100% | Medium risk46 | —-0.097 |
| 316 | 25HF0009CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) -BRGY. BUNGA-LAMAC-POBLACION ROAD LEADING TO RESORT AND CAVE, PINAMUNGAHAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱9.7M | 100% | Medium risk46 | —-0.098 |
| 317 | 23HI0075CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG CEBU NORTH HAGNAYA WHARF RD - K0073+960 - K0074+050, K0074+880 - K0075+000, K0075+430 - K0075+510 | Region VII | Cebu 5th DEO | Completed | ₱19M | 100% | Medium risk46 | —-0.096 |
| 318 | 18HI0046REHABILITATION OF PAVED ROAD ALONG SOGOD-TABUELAN ROAD-K0123+089 - K0123+716, K0120+133 -K0120+598, K0119+(-927) - K0119+(-841) | Region VII | Cebu 5th DEO | Completed | ₱17.7M | 100% | Medium risk46 | —-0.096 |
| 319 | 19HF0012ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING OF CEBU-TOLEDO WHARF RD. (JCT. NAGA-ULING)-K0031+088-K0031+684 | Region VII | Cebu 3rd DEO | Completed | ₱12.5M | 100% | Medium risk46 | —-0.098 |
| 320 | 18HE0036LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS - ROAD CONCRETING OF BRGY. ULING TO BRGY. MAYANA, NAGA CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱13.5M | 100% | Medium risk46 | —-0.098 |
| 321 | 19HI0002CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER, COMPOSTELA, CEBU | Region VII | Cebu 5th DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.078 |
| 322 | 24HF0059NETWORK DEVELOPMENT - ROAD WIDENING - TOLEDO - PINAMUNGAHAN - ALOGUINSAN - MANTALONGON RD - K0050 + 000 - K0050 + 767 | Region VII | Cebu 3rd DEO | Completed | ₱12.2M | 100% | Medium risk46 | —-0.097 |
| 323 | 20HI0008CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NAGHALIN RIVER (UPSTREAM), CATMON, CEBU | Region VII | Cebu 5th DEO | Completed | ₱32.5M | 100% | Medium risk46 | —-0.078 |
| 324 | 18HI0048CONSTRUCTION OF CONCRETE ROAD, SITIO PORTLAND TO SITIO CALUBIHAN, BRGY. CAHUMAYAN, DANAO CITY, CEBU | Region VII | Cebu 5th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.094 |
| 325 | 24HF0002REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG NAGA-ULING RD - K0040 + 230 - K0040 + 280 | Region VII | Cebu 3rd DEO | Completed | ₱5.8M | 100% | Medium risk46 | —-0.097 |