Contractor dossier
414 projects on file, including joint ventures this contractor is part of.
Total projects
414
Total budget
₱28B
Average progress
95.5%
Completion rate
85.0%
Average risk score
52.2
Medium risk on average, out of 100
Flagged as unusual
11
2.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 248 | ₱17.9B | 51.8 | 5 | 95.4% |
| Region VII | 164 | ₱10B | 52.8 | 6 | 95.7% |
| Negros Island Region | 2 | ₱145.5M | 55.9 | 0 | 83.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 292 | ₱19.1B | 50.0 | 1 | 96.1% |
| Flood Control and Drainage | 65 | ₱3.9B | 51.5 | 0 | 96.6% |
| Bridges | 19 | ₱987.3M | 48.0 | 0 | 95.3% |
| OTHER | 18 | ₱1.4B | 73.2 | 5 | 97.9% |
| Bridges, Roads | 10 | ₱1.6B | 56.6 | 1 | 90.0% |
| GAA 2025 OO-1 | 5 | ₱509M | 93.1 | 3 | 63.4% |
| GAA 2025 SSP | 3 | ₱193.8M | 91.0 | 1 | 73.0% |
| GAA 2025 OO-2 | 1 | ₱124.1M | 92.1 | 0 | 71.8% |
| Water Provision and Storage | 1 | ₱109.6M | 59.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25H00126CSSP PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST OF BRGY BUNGA-LAMAC-POBLACION ROAD LEADING TO RESORT AND CAVE | Region VII | Region VII | On-Going | ₱141.8M | 19% | High risk96 | Flagged0.048 |
| 25H00046ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD (PHASE 6), CEBU | Region VII | Region VII | On-Going | ₱106M | 47% | High risk95 | Flagged0.021 |
| 25K00049CONSTRUCTION OF BY-PASS AND DIVERSION ROADS JCT. CDO - TALAKAG ROAD/ MACAPAGAL DRIVE - UPPER CARMEN - PATAG - JCT. BCIR/ KAUSWAGAN DIVERSION ROAD, PACKAGE 8, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱62.2M | 61% | High risk94 | —-0.000 |
| 25K00088CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY BYPASS ROAD - CARMEN PUERTO SECTION (CLIMBING LANES), PACKAGE 2, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱180.2M | 26% | High risk93 | Flagged0.028 |
| 25HI0006OO1: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - CEBU NORTH HAGNAYA WHARF RD - K0042 + 896 - K0043 + 000, K0045 + 699 - K0047 + 000, K0047 + 000 - K0047 + 500, K0060 + 215 - K0060 + 792, K0060 + 806 - K0062 + 000, K0073 + 205 - | Region VII | Cebu 5th DEO | On-Going | ₱140.1M | 100% | High risk93 | Flagged0.011 |
| 25KC0063CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TICALAAN-ILIGAN RD. (MAMAON-RAGONGON SECTION), (UPSTREAM AND DOWNSTREAM) OF LOWER PIGCUTIN BRIDGE, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱124.1M | 72% | High risk92 | —-0.006 |
| 25KC0034PAVING OF UNPAVED ROADS ALONG JCT. SH - MANOLO FORTICH-LIBONA-INDAHAG ROAD K1476+557-K1476+826, LIBONA, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱20.4M | 83% | High risk91 | —-0.009 |
| 25KC0011INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENTMARKINGS, ROAD SIGNS) ALONG JCT. SH-MANOLO FORTICH-LIBONA-INDAHAG RD. - K1449+042-K1454+062, K1454+832-K1457+000, K1459+320-K1470+000, MANOLO FORTICH & LIBONA, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱19.1M | 100% | High risk89 | —-0.030 |
| 24K00529CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALATUKAN RIVER, PACKAGE 1, BALINGASAG, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱143.9M | 72% | High risk89 | Flagged0.069 |
| 25KC0023INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENT MARKINGS, ROAD SIGNS) ALONG SAYRE HIGHWAY - K1440+000-K1444+800, K1447+650-K1454+000, K1456+800-K1458+200, K1459+000-K1463+000, K1463+850-K1466+000, K1467+200-K1468+000, K1471+000-K1472+000, MA | Region X | Bukidnon 3rd DEO | Completed | ₱32.8M | 100% | High risk88 | —-0.031 |
| 24K00109CONST. OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO,CDO OLD AIRPORT ROAD DIVERSION ROAD(PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD)PHASE II, PACKAGE 19, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱121.7M | 100% | High risk78 | Flagged0.004 |
| 18H00039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYATEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, PRIMARY ROADS, N. BACALSO AVE. (CEBU SOUTH RD). INCL. ROW K0057+(-815)- K0057+793, K0057+799-K0059+000, K0059+000-K0060+000 | Region VII | Region VII | Completed | ₱150.6M | 100% | High risk77 | Flagged0.010 |
| 24KC0009ROAD WIDENING ALONG SAYRE HIGHWAY - K1445+075-K1445+885, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱70.2M | 100% | High risk75 | —-0.036 |
| 22K00312CONST. OF MISSING LINKS/NEW ROADS, EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON (JCT. CDO CITY - CAMP KIBANTAN - DOMINOROG ROAD TO JCT. MANOLO FORTICH - LIBONA - INDAHAG ROAD) (LIBONA - BAUNGON SECTION), PACKAGE 8, BUKIDNON | Region X | Region X | Completed | ₱65.5M | 100% | High risk75 | —-0.029 |
| 22K00346CONST. OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO, CDO-OLD AIRPORT ROAD DIVERSION ROAD (PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD) PHASE II, PACKAGE 12, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱59.3M | 100% | High risk75 | —-0.026 |
| 22K00311CONST. OF MISSING LINKS/NEW ROADS, TAGOLOAN-MISAMIS ORIENTAL BDRY, PACKAGE 5, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱52.3M | 100% | High risk74 | —-0.032 |
| 17H00019MF0-1 NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT, OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SECONDARY ROADS, CEBU NORTH HAGNAYA WHARF ROAD | Region VII | Region VII | Completed | ₱95M | 100% | High risk73 | —-0.018 |
| 19H00006ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, CEBU NORTH HAGNAYA, WHARF RD-K0063+000-K0064+300, K0074+420- | Region VII | Region VII | Completed | ₱106.1M | 100% | High risk72 | —-0.006 |
| 24KC0121ROAD WIDENING ALONG SAYRE HIGHWAY - K1440+800-K1440+890, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱9.9M | 100% | High risk72 | —-0.040 |
| 24KC0119ROAD WIDENING ALONG SAYRE HIGHWAY - K1441+1063-K1442+100, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱22.1M | 100% | High risk72 | —-0.041 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24K00529CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALATUKAN RIVER, PACKAGE 1, BALINGASAG, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱143.9M | 72% | High risk89 | Flagged0.069 |
| 25H00126CSSP PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST OF BRGY BUNGA-LAMAC-POBLACION ROAD LEADING TO RESORT AND CAVE | Region VII | Region VII | On-Going | ₱141.8M | 19% | High risk96 | Flagged0.048 |
| 24K00549CONSTRUCTION OF SAYRE HIGHWAY - K1441 + 415 - K1441 + 906, K1442 + 015 - K1443 + 220, K01443 + 550 - K1444 + 185, K1451 + 250 - K1451 + 558, K1465 + 073 - K1466 + 000, K1467 + 000 - K1468 + 025, K1469 + 202 - K1470 + 012 | Region X | Region X | On-Going | ₱238M | 100% | High risk64 | Flagged0.034 |
| 25K00088CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY BYPASS ROAD - CARMEN PUERTO SECTION (CLIMBING LANES), PACKAGE 2, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱180.2M | 26% | High risk93 | Flagged0.028 |
| 25H00046ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD (PHASE 6), CEBU | Region VII | Region VII | On-Going | ₱106M | 47% | High risk95 | Flagged0.021 |
| 24H00034ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD LEADING TO INTERNATIONAL CONTAINER PORT, CEBU | Region VII | Region VII | On-Going | ₱250.6M | 0% | High risk66 | Flagged0.011 |
| 25HI0006OO1: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - CEBU NORTH HAGNAYA WHARF RD - K0042 + 896 - K0043 + 000, K0045 + 699 - K0047 + 000, K0047 + 000 - K0047 + 500, K0060 + 215 - K0060 + 792, K0060 + 806 - K0062 + 000, K0073 + 205 - | Region VII | Cebu 5th DEO | On-Going | ₱140.1M | 100% | High risk93 | Flagged0.011 |
| 18H00039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYATEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, PRIMARY ROADS, N. BACALSO AVE. (CEBU SOUTH RD). INCL. ROW K0057+(-815)- K0057+793, K0057+799-K0059+000, K0059+000-K0060+000 | Region VII | Region VII | Completed | ₱150.6M | 100% | High risk77 | Flagged0.010 |
| 23K00081CONST. OF BY_PASS AND DIVERSION ROADS ,CDO-NEW EASTERN DIVERSION ROAD (JCT. SOUTH DIVERSION ROAD/ MANDUMOL-NAZARETH- CAMAMAN-AN-JUSTO RAMONAL-JCT. J.R BORJA-LKKS-BCIR/ LAPASAN), PACKAGE 5, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱38.7M | 90% | High risk71 | Flagged0.007 |
| 18H00042ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, CEBU NORTH HAGNAYA WHARF ROAD - K0034+648-K0035+000, K0052+000-K0055+648, CEBU PROVINCE | Region VII | Region VII | Completed | ₱131.5M | 100% | High risk71 | Flagged0.006 |
| 24K00109CONST. OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO,CDO OLD AIRPORT ROAD DIVERSION ROAD(PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD)PHASE II, PACKAGE 19, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱121.7M | 100% | High risk78 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 351 | 21KK0043REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1316 + 492.00 - K1318 + 399.00, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱39.5M | 100% | Medium risk46 | —-0.092 |
| 352 | 22KC0022REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE KULAMAN BRIDGE (B01497MN) ALONG SAYRE HIGHWAY, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱5.9M | 100% | Medium risk46 | —-0.061 |
| 353 | 20KK0063ROAD WIDENING- PRIMARY ROADS- BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD- K1313+000-K1314+296, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱37.8M | 100% | Medium risk46 | —-0.092 |
| 354 | 20KK0107ROAD WIDENING ALONG BUTUAN CITY- CAGAYAN DE ORO CITY- ILIGAN CITY RD. -K1316+542- K1317+676, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱29.4M | 100% | Medium risk46 | —-0.093 |
| 355 | 25HI0091CSSP: SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A 11239 - IMPROVEMENT OF INTERSECTION AT CEBU NORTH HAGNAYA WHARF RD - K0034 + 380 | Region VII | Cebu 5th DEO | On-Going | ₱9.7M | 100% | Medium risk46 | —-0.065 |
| 356 | 21HI0001PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG CEBU NORTH HAGNAYA WHARF RD (S00163CB) - K0015+500 - K0015+853 | Region VII | Cebu 5th DEO | Completed | ₱13.3M | 100% | Medium risk45 | —-0.097 |
| 357 | 24HI0032INSTALLATION OF ROAD SAFETY DEVICES AND FACILITIES ALONG CEBU NORTH HAGNAYA WHARF RD (S00163CB) - K0015+213 - K0016+213, LILOAN, CEBU | Region VII | Cebu 5th DEO | Completed | ₱8.4M | 100% | Medium risk45 | —-0.097 |
| 358 | 25HI0092CSSP: SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A 11239 - IMPROVEMENT OF INTERSECTION AT CEBU NORTH HAGNAYA WHARF RD - K0034+ (-551) | Region VII | Cebu 5th DEO | On-Going | ₱9.7M | 100% | Medium risk45 | —-0.065 |
| 359 | 24KC0030CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BARANDIAS-DOMINOROG RD. (UPSTREAM) OF DOMINOROG BRIDGE, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱30.4M | 100% | Medium risk45 | —-0.079 |
| 360 | 24KH0022ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS CDO-AIRPORT-BUKIDNON RD - K1458 + 365 - K1459 + 090, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱15.2M | 100% | Medium risk45 | —-0.094 |
| 361 | 24KC0098CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO GRAND CANYON WITH VIEW DECK, BARANGAY LUNOCAN, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.095 |
| 362 | 17K00031REHAB./RECONST. OF NATL ROADS WITH SLIPS,SLOPE COLLAPSE & LANDSLIDE,SH,CDOC 2ND LD | Region X | Region X | Completed | ₱84.9M | 100% | Medium risk45 | —-0.059 |
| 363 | 20KD0018CONST. OF DRAINAGE STRUCTURE ALONG ROAD BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD K1435+667 - K | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱18M | 100% | Medium risk45 | —-0.094 |
| 364 | 21KD0019PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG BCIR K1425+544 TO K1426+000 | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱28M | 100% | Medium risk45 | —-0.095 |
| 365 | 21KD0002PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG SAYRE HIGHWAY K1436+267 TO K1436+702 | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱20.1M | 100% | Medium risk45 | —-0.096 |
| 366 | 17K00014IMPRVT./WIDENING OF NATL RD-JCT.SH-MF-LIBONA-INDAHAG RD K1448+425-K1449+200,K1462+485-K1463+500,K146 | Region X | Region X | Completed | ₱66.3M | 100% | Medium risk45 | —-0.063 |
| 367 | 20KA0045ROAD WIDENING - ALONG SAYRE HIGHWAY (S00639MN) K1514 + 780 - K1515 + 205, MALAYBALAY CITY, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱18.1M | 100% | Medium risk45 | —-0.093 |
| 368 | 23KC0048ROAD WIDENING ALONG CDO CITY-DOMINOROG-CAMP KIBARITAN RD. - K1477+243-K1477+740, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱25.9M | 100% | Medium risk45 | —-0.093 |
| 369 | 23KH0015PREVENTIVE MAINTENANCE - SECONDARY ROADS CDO-AIRPORT-BUKIDNON RD K1460+000 - K1461+933, K1462+488 - K1462+800 CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱24.5M | 100% | Medium risk45 | —-0.094 |
| 370 | 24KC0002REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIP SLOPE COLLAPSE AND LANDSLIDE ALONG TICALAAN-ILIGAN RD. (MAMAON-RAGONGON SECT.) - K1493+(-300)-K1493+000, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱18.9M | 100% | Medium risk45 | —-0.094 |
| 371 | 22KH0013ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE TERTIARY ROADS LUMBIA-UGUIABAN BY-PASS RD - (S00618MN) CHAINAGE 1362 - CHAINAGE 1492, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱24.5M | 100% | Medium risk45 | —-0.095 |
| 372 | 21KC0093REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG CDO CITY-DOMINOROG-CAMP KIBARITAN RD., K1467+718 - K1467+742, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.095 |
| 373 | 25KC0021ROAD WIDENING ALONG SAYRE - K1443+053-K1443+160, K1443+940-K1444+010, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱16M | 100% | Medium risk45 | —-0.095 |
| 374 | 24HI0056INSTALLATION OF ROAD SAFETY DEVICES AND FACILITIES ALONG CEBU NORTH HAGNAYA WHARF RD (S00163CB) - K0028+324 - K0029+328 | Region VII | Cebu 5th DEO | Completed | ₱8.4M | 100% | Medium risk45 | —-0.097 |
| 375 | 24HI0057INSTALLATION OF ROAD SAFETY DEVICES AND FACILITIES ALONG CEBU NORTH HAGNAYA WHARF RD (S00163CB) - K0030+000 - K0031+000 | Region VII | Cebu 5th DEO | Completed | ₱8.4M | 100% | Medium risk45 | —-0.097 |