Contractor dossier
414 projects on file, including joint ventures this contractor is part of.
Total projects
414
Total budget
₱28B
Average progress
95.5%
Completion rate
85.0%
Average risk score
52.2
Medium risk on average, out of 100
Flagged as unusual
11
2.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 248 | ₱17.9B | 51.8 | 5 | 95.4% |
| Region VII | 164 | ₱10B | 52.8 | 6 | 95.7% |
| Negros Island Region | 2 | ₱145.5M | 55.9 | 0 | 83.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 292 | ₱19.1B | 50.0 | 1 | 96.1% |
| Flood Control and Drainage | 65 | ₱3.9B | 51.5 | 0 | 96.6% |
| Bridges | 19 | ₱987.3M | 48.0 | 0 | 95.3% |
| OTHER | 18 | ₱1.4B | 73.2 | 5 | 97.9% |
| Bridges, Roads | 10 | ₱1.6B | 56.6 | 1 | 90.0% |
| GAA 2025 OO-1 | 5 | ₱509M | 93.1 | 3 | 63.4% |
| GAA 2025 SSP | 3 | ₱193.8M | 91.0 | 1 | 73.0% |
| GAA 2025 OO-2 | 1 | ₱124.1M | 92.1 | 0 | 71.8% |
| Water Provision and Storage | 1 | ₱109.6M | 59.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25H00126CSSP PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST OF BRGY BUNGA-LAMAC-POBLACION ROAD LEADING TO RESORT AND CAVE | Region VII | Region VII | On-Going | ₱141.8M | 19% | High risk96 | Flagged0.048 |
| 25H00046ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD (PHASE 6), CEBU | Region VII | Region VII | On-Going | ₱106M | 47% | High risk95 | Flagged0.021 |
| 25K00049CONSTRUCTION OF BY-PASS AND DIVERSION ROADS JCT. CDO - TALAKAG ROAD/ MACAPAGAL DRIVE - UPPER CARMEN - PATAG - JCT. BCIR/ KAUSWAGAN DIVERSION ROAD, PACKAGE 8, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱62.2M | 61% | High risk94 | —-0.000 |
| 25K00088CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY BYPASS ROAD - CARMEN PUERTO SECTION (CLIMBING LANES), PACKAGE 2, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱180.2M | 26% | High risk93 | Flagged0.028 |
| 25HI0006OO1: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - CEBU NORTH HAGNAYA WHARF RD - K0042 + 896 - K0043 + 000, K0045 + 699 - K0047 + 000, K0047 + 000 - K0047 + 500, K0060 + 215 - K0060 + 792, K0060 + 806 - K0062 + 000, K0073 + 205 - | Region VII | Cebu 5th DEO | On-Going | ₱140.1M | 100% | High risk93 | Flagged0.011 |
| 25KC0063CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TICALAAN-ILIGAN RD. (MAMAON-RAGONGON SECTION), (UPSTREAM AND DOWNSTREAM) OF LOWER PIGCUTIN BRIDGE, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱124.1M | 72% | High risk92 | —-0.006 |
| 25KC0034PAVING OF UNPAVED ROADS ALONG JCT. SH - MANOLO FORTICH-LIBONA-INDAHAG ROAD K1476+557-K1476+826, LIBONA, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱20.4M | 83% | High risk91 | —-0.009 |
| 25KC0011INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENTMARKINGS, ROAD SIGNS) ALONG JCT. SH-MANOLO FORTICH-LIBONA-INDAHAG RD. - K1449+042-K1454+062, K1454+832-K1457+000, K1459+320-K1470+000, MANOLO FORTICH & LIBONA, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱19.1M | 100% | High risk89 | —-0.030 |
| 24K00529CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALATUKAN RIVER, PACKAGE 1, BALINGASAG, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱143.9M | 72% | High risk89 | Flagged0.069 |
| 25KC0023INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENT MARKINGS, ROAD SIGNS) ALONG SAYRE HIGHWAY - K1440+000-K1444+800, K1447+650-K1454+000, K1456+800-K1458+200, K1459+000-K1463+000, K1463+850-K1466+000, K1467+200-K1468+000, K1471+000-K1472+000, MA | Region X | Bukidnon 3rd DEO | Completed | ₱32.8M | 100% | High risk88 | —-0.031 |
| 24K00109CONST. OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO,CDO OLD AIRPORT ROAD DIVERSION ROAD(PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD)PHASE II, PACKAGE 19, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱121.7M | 100% | High risk78 | Flagged0.004 |
| 18H00039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYATEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, PRIMARY ROADS, N. BACALSO AVE. (CEBU SOUTH RD). INCL. ROW K0057+(-815)- K0057+793, K0057+799-K0059+000, K0059+000-K0060+000 | Region VII | Region VII | Completed | ₱150.6M | 100% | High risk77 | Flagged0.010 |
| 24KC0009ROAD WIDENING ALONG SAYRE HIGHWAY - K1445+075-K1445+885, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱70.2M | 100% | High risk75 | —-0.036 |
| 22K00312CONST. OF MISSING LINKS/NEW ROADS, EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON (JCT. CDO CITY - CAMP KIBANTAN - DOMINOROG ROAD TO JCT. MANOLO FORTICH - LIBONA - INDAHAG ROAD) (LIBONA - BAUNGON SECTION), PACKAGE 8, BUKIDNON | Region X | Region X | Completed | ₱65.5M | 100% | High risk75 | —-0.029 |
| 22K00346CONST. OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO, CDO-OLD AIRPORT ROAD DIVERSION ROAD (PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD) PHASE II, PACKAGE 12, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱59.3M | 100% | High risk75 | —-0.026 |
| 22K00311CONST. OF MISSING LINKS/NEW ROADS, TAGOLOAN-MISAMIS ORIENTAL BDRY, PACKAGE 5, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱52.3M | 100% | High risk74 | —-0.032 |
| 17H00019MF0-1 NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT, OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SECONDARY ROADS, CEBU NORTH HAGNAYA WHARF ROAD | Region VII | Region VII | Completed | ₱95M | 100% | High risk73 | —-0.018 |
| 19H00006ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, CEBU NORTH HAGNAYA, WHARF RD-K0063+000-K0064+300, K0074+420- | Region VII | Region VII | Completed | ₱106.1M | 100% | High risk72 | —-0.006 |
| 24KC0121ROAD WIDENING ALONG SAYRE HIGHWAY - K1440+800-K1440+890, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱9.9M | 100% | High risk72 | —-0.040 |
| 24KC0119ROAD WIDENING ALONG SAYRE HIGHWAY - K1441+1063-K1442+100, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱22.1M | 100% | High risk72 | —-0.041 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24K00529CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALATUKAN RIVER, PACKAGE 1, BALINGASAG, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱143.9M | 72% | High risk89 | Flagged0.069 |
| 25H00126CSSP PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST OF BRGY BUNGA-LAMAC-POBLACION ROAD LEADING TO RESORT AND CAVE | Region VII | Region VII | On-Going | ₱141.8M | 19% | High risk96 | Flagged0.048 |
| 24K00549CONSTRUCTION OF SAYRE HIGHWAY - K1441 + 415 - K1441 + 906, K1442 + 015 - K1443 + 220, K01443 + 550 - K1444 + 185, K1451 + 250 - K1451 + 558, K1465 + 073 - K1466 + 000, K1467 + 000 - K1468 + 025, K1469 + 202 - K1470 + 012 | Region X | Region X | On-Going | ₱238M | 100% | High risk64 | Flagged0.034 |
| 25K00088CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY BYPASS ROAD - CARMEN PUERTO SECTION (CLIMBING LANES), PACKAGE 2, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱180.2M | 26% | High risk93 | Flagged0.028 |
| 25H00046ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD (PHASE 6), CEBU | Region VII | Region VII | On-Going | ₱106M | 47% | High risk95 | Flagged0.021 |
| 24H00034ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD LEADING TO INTERNATIONAL CONTAINER PORT, CEBU | Region VII | Region VII | On-Going | ₱250.6M | 0% | High risk66 | Flagged0.011 |
| 25HI0006OO1: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - CEBU NORTH HAGNAYA WHARF RD - K0042 + 896 - K0043 + 000, K0045 + 699 - K0047 + 000, K0047 + 000 - K0047 + 500, K0060 + 215 - K0060 + 792, K0060 + 806 - K0062 + 000, K0073 + 205 - | Region VII | Cebu 5th DEO | On-Going | ₱140.1M | 100% | High risk93 | Flagged0.011 |
| 18H00039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYATEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, PRIMARY ROADS, N. BACALSO AVE. (CEBU SOUTH RD). INCL. ROW K0057+(-815)- K0057+793, K0057+799-K0059+000, K0059+000-K0060+000 | Region VII | Region VII | Completed | ₱150.6M | 100% | High risk77 | Flagged0.010 |
| 23K00081CONST. OF BY_PASS AND DIVERSION ROADS ,CDO-NEW EASTERN DIVERSION ROAD (JCT. SOUTH DIVERSION ROAD/ MANDUMOL-NAZARETH- CAMAMAN-AN-JUSTO RAMONAL-JCT. J.R BORJA-LKKS-BCIR/ LAPASAN), PACKAGE 5, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱38.7M | 90% | High risk71 | Flagged0.007 |
| 18H00042ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, CEBU NORTH HAGNAYA WHARF ROAD - K0034+648-K0035+000, K0052+000-K0055+648, CEBU PROVINCE | Region VII | Region VII | Completed | ₱131.5M | 100% | High risk71 | Flagged0.006 |
| 24K00109CONST. OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO,CDO OLD AIRPORT ROAD DIVERSION ROAD(PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD)PHASE II, PACKAGE 19, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱121.7M | 100% | High risk78 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 401 | 18HE0035LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS - CONCRETING OF ROAD, BRGY. TANAÑAS-CABATBATAN, SAN FERNANDO, CEBU | Region VII | Cebu 1st DEO | Completed | ₱3.9M | 100% | Low risk27 | —-0.093 |
| 402 | 18HE0034LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS - CONCRETING OF ROAD, BRGY. PATAG-LUTAC, NAGA CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱3.8M | 100% | Low risk27 | —-0.093 |
| 403 | 24HF0039ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-CEBU-BALAMBAN TRANSCENTRAL HIGHWAY - K0030+064-K0030+121 | Region VII | Cebu 3rd DEO | Completed | ₱2.4M | 100% | Low risk27 | —-0.096 |
| 404 | 24K00102WIDENING OF PERMANENT BRIDGES-NAMNAM BR.(B01652MN) ALONG KAPALONG-TALAINGOD-VALENCIA (BUKIDNON) RD | Region X | Region X | On-Going | ₱2.3M | 100% | Low risk25 | —-0.026 |
| 405 | 17HI0032REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES AT DUNGGOAN BRIDGE (B00577CB) ALONG CNHWR, DANAO, CEBU | Region VII | Cebu 5th DEO | Completed | ₱4.6M | 100% | Low risk23 | —-0.031 |
| 406 | 25HI0080CSSP: SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS R.A 11239 - INSTALLATION/ APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENT MARKINGS, ROAD SIGNS) ALONG CEBU NORTH HAGNAYA WHARF RD - K0031 + 387 - K0032 + 392 | Region VII | Cebu 5th DEO | On-Going | ₱2.1M | 100% | Low risk21 | —-0.064 |
| 407 | 25HI0079CSSP: SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS R.A 11239 - INSTALLATION/ APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENT MARKINGS, ROAD SIGNS) ALONG CEBU NORTH HAGNAYA WHARF RD - K0029 + 328 - K0029 + 847 | Region VII | Cebu 5th DEO | On-Going | ₱1.1M | 100% | Low risk19 | —-0.064 |
| 408 | 21KH0052ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIP, SLIP SLOPE COLLAPSE AND LANDSLIDE CDO AIRPORT-BUKIDNON ROAD K1442+035.00-K1442+085.00, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱2.9M | 100% | Low risk17 | —-0.086 |
| 409 | 20KL0008ASSET PRESERVATION PREVENTIVE MAINTENANCE TERTIARY ROADSMANTICAO BY-PASS ROAD, K1501+000 K1501+262 | Region X | Misamis Oriental 2nd DEO | Completed | ₱4.6M | 100% | Low risk16 | —-0.092 |
| 410 | 20KD0019CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD CORRALES EXTENSION ST -PORT K143939+171 - K1439+558 | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱3.7M | 100% | Low risk16 | —-0.093 |
| 411 | 20KH0002ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - JCT NATL H-WAY-BULUA RD - (S00605MN) CHAINAGE 000 - CHAINAGE 479 | Region X | Cagayan de Oro City 1st DEO | Completed | ₱3.7M | 100% | Low risk16 | —-0.093 |
| 412 | 25KC0008REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS ALONG CDO CITY- DOMINOROG-CAMP KIBARITAN RD. - K1469+550-K1469+580, K1505+500-K1505+550, K1506+400-K1506+450, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱3.8M | 100% | Low risk16 | —-0.093 |
| 413 | 20KH0026NETWORK DEVELOPMENT : ROAD WIDENING : SECONDARY ROADS : CARMEN-PATAG-BULUA RD : K1441+670 TO K1441+840, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱2.4M | 100% | Low risk16 | —-0.077 |
| 414 | 21KF0012PREVENTIVE MAINTENANCE ALONG STA. FELOMINA-BONBONON-DIGKILAAN-ROGONGON ROAD, K1521+356-K1521+470, ILIGAN CITY | Region X | Lanao del Norte 1st DEO | Completed | ₱2.1M | 100% | Low risk16 | —-0.092 |