Contractor dossier
414 projects on file, including joint ventures this contractor is part of.
Total projects
414
Total budget
₱28B
Average progress
95.5%
Completion rate
85.0%
Average risk score
52.2
Medium risk on average, out of 100
Flagged as unusual
11
2.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 248 | ₱17.9B | 51.8 | 5 | 95.4% |
| Region VII | 164 | ₱10B | 52.8 | 6 | 95.7% |
| Negros Island Region | 2 | ₱145.5M | 55.9 | 0 | 83.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 292 | ₱19.1B | 50.0 | 1 | 96.1% |
| Flood Control and Drainage | 65 | ₱3.9B | 51.5 | 0 | 96.6% |
| Bridges | 19 | ₱987.3M | 48.0 | 0 | 95.3% |
| OTHER | 18 | ₱1.4B | 73.2 | 5 | 97.9% |
| Bridges, Roads | 10 | ₱1.6B | 56.6 | 1 | 90.0% |
| GAA 2025 OO-1 | 5 | ₱509M | 93.1 | 3 | 63.4% |
| GAA 2025 SSP | 3 | ₱193.8M | 91.0 | 1 | 73.0% |
| GAA 2025 OO-2 | 1 | ₱124.1M | 92.1 | 0 | 71.8% |
| Water Provision and Storage | 1 | ₱109.6M | 59.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25H00126CSSP PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST OF BRGY BUNGA-LAMAC-POBLACION ROAD LEADING TO RESORT AND CAVE | Region VII | Region VII | On-Going | ₱141.8M | 19% | High risk96 | Flagged0.048 |
| 25H00046ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD (PHASE 6), CEBU | Region VII | Region VII | On-Going | ₱106M | 47% | High risk95 | Flagged0.021 |
| 25K00049CONSTRUCTION OF BY-PASS AND DIVERSION ROADS JCT. CDO - TALAKAG ROAD/ MACAPAGAL DRIVE - UPPER CARMEN - PATAG - JCT. BCIR/ KAUSWAGAN DIVERSION ROAD, PACKAGE 8, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱62.2M | 61% | High risk94 | —-0.000 |
| 25K00088CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY BYPASS ROAD - CARMEN PUERTO SECTION (CLIMBING LANES), PACKAGE 2, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱180.2M | 26% | High risk93 | Flagged0.028 |
| 25HI0006OO1: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - CEBU NORTH HAGNAYA WHARF RD - K0042 + 896 - K0043 + 000, K0045 + 699 - K0047 + 000, K0047 + 000 - K0047 + 500, K0060 + 215 - K0060 + 792, K0060 + 806 - K0062 + 000, K0073 + 205 - | Region VII | Cebu 5th DEO | On-Going | ₱140.1M | 100% | High risk93 | Flagged0.011 |
| 25KC0063CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TICALAAN-ILIGAN RD. (MAMAON-RAGONGON SECTION), (UPSTREAM AND DOWNSTREAM) OF LOWER PIGCUTIN BRIDGE, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱124.1M | 72% | High risk92 | —-0.006 |
| 25KC0034PAVING OF UNPAVED ROADS ALONG JCT. SH - MANOLO FORTICH-LIBONA-INDAHAG ROAD K1476+557-K1476+826, LIBONA, BUKIDNON | Region X | Bukidnon 3rd DEO | On-Going | ₱20.4M | 83% | High risk91 | —-0.009 |
| 25KC0011INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENTMARKINGS, ROAD SIGNS) ALONG JCT. SH-MANOLO FORTICH-LIBONA-INDAHAG RD. - K1449+042-K1454+062, K1454+832-K1457+000, K1459+320-K1470+000, MANOLO FORTICH & LIBONA, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱19.1M | 100% | High risk89 | —-0.030 |
| 24K00529CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALATUKAN RIVER, PACKAGE 1, BALINGASAG, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱143.9M | 72% | High risk89 | Flagged0.069 |
| 25KC0023INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENT MARKINGS, ROAD SIGNS) ALONG SAYRE HIGHWAY - K1440+000-K1444+800, K1447+650-K1454+000, K1456+800-K1458+200, K1459+000-K1463+000, K1463+850-K1466+000, K1467+200-K1468+000, K1471+000-K1472+000, MA | Region X | Bukidnon 3rd DEO | Completed | ₱32.8M | 100% | High risk88 | —-0.031 |
| 24K00109CONST. OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO,CDO OLD AIRPORT ROAD DIVERSION ROAD(PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD)PHASE II, PACKAGE 19, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱121.7M | 100% | High risk78 | Flagged0.004 |
| 18H00039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYATEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, PRIMARY ROADS, N. BACALSO AVE. (CEBU SOUTH RD). INCL. ROW K0057+(-815)- K0057+793, K0057+799-K0059+000, K0059+000-K0060+000 | Region VII | Region VII | Completed | ₱150.6M | 100% | High risk77 | Flagged0.010 |
| 24KC0009ROAD WIDENING ALONG SAYRE HIGHWAY - K1445+075-K1445+885, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱70.2M | 100% | High risk75 | —-0.036 |
| 22K00312CONST. OF MISSING LINKS/NEW ROADS, EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR TO BUKIDNON (JCT. CDO CITY - CAMP KIBANTAN - DOMINOROG ROAD TO JCT. MANOLO FORTICH - LIBONA - INDAHAG ROAD) (LIBONA - BAUNGON SECTION), PACKAGE 8, BUKIDNON | Region X | Region X | Completed | ₱65.5M | 100% | High risk75 | —-0.029 |
| 22K00346CONST. OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO, CDO-OLD AIRPORT ROAD DIVERSION ROAD (PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD) PHASE II, PACKAGE 12, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱59.3M | 100% | High risk75 | —-0.026 |
| 22K00311CONST. OF MISSING LINKS/NEW ROADS, TAGOLOAN-MISAMIS ORIENTAL BDRY, PACKAGE 5, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱52.3M | 100% | High risk74 | —-0.032 |
| 17H00019MF0-1 NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT, OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SECONDARY ROADS, CEBU NORTH HAGNAYA WHARF ROAD | Region VII | Region VII | Completed | ₱95M | 100% | High risk73 | —-0.018 |
| 19H00006ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, CEBU NORTH HAGNAYA, WHARF RD-K0063+000-K0064+300, K0074+420- | Region VII | Region VII | Completed | ₱106.1M | 100% | High risk72 | —-0.006 |
| 24KC0121ROAD WIDENING ALONG SAYRE HIGHWAY - K1440+800-K1440+890, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱9.9M | 100% | High risk72 | —-0.040 |
| 24KC0119ROAD WIDENING ALONG SAYRE HIGHWAY - K1441+1063-K1442+100, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱22.1M | 100% | High risk72 | —-0.041 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24K00529CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALATUKAN RIVER, PACKAGE 1, BALINGASAG, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱143.9M | 72% | High risk89 | Flagged0.069 |
| 25H00126CSSP PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST OF BRGY BUNGA-LAMAC-POBLACION ROAD LEADING TO RESORT AND CAVE | Region VII | Region VII | On-Going | ₱141.8M | 19% | High risk96 | Flagged0.048 |
| 24K00549CONSTRUCTION OF SAYRE HIGHWAY - K1441 + 415 - K1441 + 906, K1442 + 015 - K1443 + 220, K01443 + 550 - K1444 + 185, K1451 + 250 - K1451 + 558, K1465 + 073 - K1466 + 000, K1467 + 000 - K1468 + 025, K1469 + 202 - K1470 + 012 | Region X | Region X | On-Going | ₱238M | 100% | High risk64 | Flagged0.034 |
| 25K00088CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY BYPASS ROAD - CARMEN PUERTO SECTION (CLIMBING LANES), PACKAGE 2, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱180.2M | 26% | High risk93 | Flagged0.028 |
| 25H00046ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD (PHASE 6), CEBU | Region VII | Region VII | On-Going | ₱106M | 47% | High risk95 | Flagged0.021 |
| 24H00034ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD LEADING TO INTERNATIONAL CONTAINER PORT, CEBU | Region VII | Region VII | On-Going | ₱250.6M | 0% | High risk66 | Flagged0.011 |
| 25HI0006OO1: ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - CEBU NORTH HAGNAYA WHARF RD - K0042 + 896 - K0043 + 000, K0045 + 699 - K0047 + 000, K0047 + 000 - K0047 + 500, K0060 + 215 - K0060 + 792, K0060 + 806 - K0062 + 000, K0073 + 205 - | Region VII | Cebu 5th DEO | On-Going | ₱140.1M | 100% | High risk93 | Flagged0.011 |
| 18H00039ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYATEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, PRIMARY ROADS, N. BACALSO AVE. (CEBU SOUTH RD). INCL. ROW K0057+(-815)- K0057+793, K0057+799-K0059+000, K0059+000-K0060+000 | Region VII | Region VII | Completed | ₱150.6M | 100% | High risk77 | Flagged0.010 |
| 23K00081CONST. OF BY_PASS AND DIVERSION ROADS ,CDO-NEW EASTERN DIVERSION ROAD (JCT. SOUTH DIVERSION ROAD/ MANDUMOL-NAZARETH- CAMAMAN-AN-JUSTO RAMONAL-JCT. J.R BORJA-LKKS-BCIR/ LAPASAN), PACKAGE 5, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱38.7M | 90% | High risk71 | Flagged0.007 |
| 18H00042ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, CEBU NORTH HAGNAYA WHARF ROAD - K0034+648-K0035+000, K0052+000-K0055+648, CEBU PROVINCE | Region VII | Region VII | Completed | ₱131.5M | 100% | High risk71 | Flagged0.006 |
| 24K00109CONST. OF BY-PASS AND DIVERSION ROADS, CAGAYAN DE ORO DIVERSION ROAD, (JCT. BALUBAL SAYRE HIGHWAY-PUEBLO DE ORO,CDO OLD AIRPORT ROAD DIVERSION ROAD(PUEBLO DE ORO/JCT. CDO-OLD AIRPORT ROAD)PHASE II, PACKAGE 19, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱121.7M | 100% | High risk78 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 22K00281CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ALUBIJID RIVER DOWNSTREAM OF ALUBIJID BRIDGE (LEFT SIDE), PACKAGE 2, ALUBIJID, MISAMIS ORIENTAL (STA.0+000.00-STA.0+707.00) | Region X | Region X | Completed | ₱139.7M | 100% | High risk62 | —-0.056 |
| 52 | 18K00256CLUSTER 56 CONST. OF MISSING LINKS/ NEW ROADS IN BUKIDNON | Region X | Region X | Completed | ₱439.6M | 100% | High risk61 | —-0.026 |
| 53 | 25K00228CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CDO CITY - DOMINOROG - CAMP KIBARITAN RD (DOWNSTREAM) OF PIGCUTIN BRIDGE, PACKAGE 2, TALAKAG, BUKIDNON | Region X | Region X | On-Going | ₱95.4M | 45% | High risk61 | —-0.022 |
| 54 | 20H00030ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS BARILI-ALOGUINSAN COASTAL ROAD, CEBU, SECTION 1: STA.0+000-STA.1+035, SECTION 2: STA.0+000-STA.1+324, SECTION 3 | Region VII | Region VII | Completed | ₱124.7M | 100% | High risk61 | —-0.069 |
| 55 | 18K00255CLUSTER 55 CONSTRUCTION OF MISSING LINKS/ NEW ROADS IN BUKIDNON | Region X | Region X | Completed | ₱456.2M | 100% | High risk61 | —-0.010 |
| 56 | 20HF0059CONSTRUCTION OF ROAD CONNECTING ASTURIAS-DANAO-LILOAN BYPASS ROAD LEADING TO INTERNATIONAL CONTAINER PORT, ASTURIAS, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱93.5M | 100% | High risk61 | —-0.080 |
| 57 | 20K00225CONST. OF BYPASSES/ DIVERSION RDS, PUERTO-CLAVERIA BYPASS ROAD, PACKAGE 5, MIS. OR., CONST. OF BR: T | Region X | Region X | Completed | ₱118.8M | 100% | High risk61 | —-0.028 |
| 58 | 25HH0150OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS- CEBU BALAMBAN TRANSCENTRAL HIGHWAY - K0016+786-K0016+902, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱94.6M | 29% | High risk60 | —-0.034 |
| 59 | 22HF0003ASSET PRESERVATION PROGRAM - REHABILITATION OF CEBU-BALAMBAN TRANSCENTRAL HIGHWAY - K0039 + 599 - K0039 + 705 WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE | Region VII | Cebu 3rd DEO | Completed | ₱96.3M | 100% | High risk60 | —-0.085 |
| 60 | 24K00387CONSTRUCTION OF DRAINAGE SYSTEM, GINGOOG CITY, PACKAGE 2, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱124.2M | 96% | High risk60 | —-0.025 |
| 61 | 23HO0065ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/NEW ROADS, ALCOY-ALEGRIA ROAD, ALEGRIA, PHASE 3, CEBU | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.085 |
| 62 | 22K00262REHABILITATION OF FLOOD CONTROL STRUCTURE, BITAN-AG CREEK, PACKAGE 12, STA. 0+000.00 - STA. 0+226.00, DOWNSTREAM SECTION, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱114M | 100% | High risk60 | —-0.057 |
| 63 | 22K00263REHABILITATION OF FLOOD CONTROL STRUCTURE, BITAN-AG CREEK, PACKAGE 13, STA. 0+226.00 - STA. 0+456.700, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱114M | 100% | High risk60 | —-0.058 |
| 64 | 20H00036ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS N. BACALSO AVE. (CEBU SOUTH RD) K0060+000-K0063+600, CEBU PROVINCE | Region VII | Region VII | Completed | ₱112.7M | 100% | High risk60 | —-0.072 |
| 65 | 23HM0095CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY STRUCTURE ALONG SIQUIJOR CIRCUMFERENTIAL RD - K0062+832 - K0074+588 | Negros Island Region | Siquijor DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.080 |
| 66 | 19K00117CONSTRUCTION OF MISSING LINKS/NEW ROADS, JCT. CDO CITY CAMP KIBARITAN DOMINOROG ROAD TO JCT. MANOLO FORTICH LIBONA-INDAHAG ROAD (TALAKAG-BAUNGON), TALAKAG-BAUNGON SECTION, PACKAGE 7, BUKIDNON | Region X | Region X | Completed | ₱137.2M | 100% | Medium risk60 | —-0.030 |
| 67 | 24KC0021CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAGAYAN DE ORO CITY-DOMINOROG-CAMP KIBARITAN RD. (UPSTREAM AND DOWNSTREAM) OF PIGCUTIN BRIDGE, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.063 |
| 68 | 21H00017ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILOAN BYPASS ROAD LEADING TO INTERNATIONAL CONTAINER PORT, CEBU, STATION 0+000-03+020.00, CE | Region VII | Region VII | Completed | ₱106.1M | 100% | Medium risk60 | —-0.079 |
| 69 | 18H00036LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - WATER MANAGEMENT FACILITIES, WATER SUPPLY, CONSTRUCTION OF WATER SUPPLY PROJECT, SOGOD, CEBU | Region VII | Region VII | Completed | ₱109.6M | 100% | Medium risk60 | —-0.035 |
| 70 | 20HF0056CONSTRUCTION OF ACCESS ROAD LEADING TO POLICIOS WATERPARK RESORT, ASTURIAS, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.080 |
| 71 | 22H00001ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, ASTURIAS-DANAO-LILO-AN BYPASS RD, CEBU, STA.00+000.00-STA.03+460.00, ASTURIAS, CEBU | Region VII | Region VII | Completed | ₱106.1M | 100% | Medium risk60 | —-0.080 |
| 72 | 22K00260REHABILITATION OF BITAN-AG CREEK (UPSTREAM SECTION), INCL. CHANNELIZATION, PACKAGE 18, STA. 0+668.300 - STA. 0+868.40, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱97.2M | 100% | Medium risk60 | —-0.060 |
| 73 | 19H00010ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIP, SLOPE COLLAPSE, AND LANDSLIDE, TERTIARY ROADS, JCT (TNR) CORTES-BALILIHAN-CATIGBIAN-MACAAS RD-K0015+751-K0016+05 | Region VII | Region VII | Completed | ₱115.8M | 100% | Medium risk60 | —-0.068 |
| 74 | 23H00029ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, CEBU-BALAMBAN TRANSCENTRAL HIGHWAY - K0024 + 279 - K0 | Region VII | Region VII | Completed | ₱100.7M | 100% | Medium risk59 | —-0.083 |
| 75 | 22KC0044CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CDO CITY DOMINOROG CAMP KIBARITAN RD (UPSTREAM AND DOWNSTREAM OF TAL-UBAN BRIDGE, PHASE II), TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.063 |