Contractor dossier
383 projects on file, including joint ventures this contractor is part of.
Total projects
383
Total budget
₱32.7B
Average progress
94.6%
Completion rate
70.5%
Average risk score
52.6
Medium risk on average, out of 100
Flagged as unusual
49
12.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 113 | ₱9.9B | 44.9 | 18 | 96.3% |
| Region XI | 103 | ₱8.5B | 54.0 | 8 | 95.0% |
| Region X | 88 | ₱7B | 54.0 | 10 | 94.3% |
| Region IX | 24 | ₱2.3B | 66.5 | 6 | 95.7% |
| Negros Island Region | 18 | ₱1.2B | 57.6 | 2 | 98.9% |
| Region XIII | 15 | ₱1.1B | 51.2 | 3 | 85.7% |
| Region VII | 9 | ₱799.1M | 60.4 | 0 | 100.0% |
| Region VIII | 8 | ₱1.2B | 66.5 | 2 | 78.4% |
| Central Office | 3 | ₱532.9M | 56.2 | 0 | 64.5% |
| Region V | 1 | ₱95.2M | 69.7 | 0 | 99.4% |
| Region IV-A | 1 | ₱14.4M | 46.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 270 | ₱22.4B | 50.4 | 16 | 97.4% |
| Flood Control and Drainage | 56 | ₱4.3B | 48.8 | 5 | 92.4% |
| Bridges | 17 | ₱1.5B | 52.4 | 5 | 94.0% |
| GAA 2025 OO-1 | 12 | ₱1.9B | 94.4 | 12 | 58.3% |
| OTHER | 11 | ₱1.1B | 75.8 | 8 | 82.2% |
| Buildings and Facilities | 10 | ₱785.6M | 44.8 | 1 | 96.5% |
| Bridges, Roads | 4 | ₱473M | 57.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 2 | ₱150.8M | 90.6 | 1 | 82.7% |
| GAA 2025 SSP | 1 | ₱95.3M | 94.1 | 1 | 52.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00048ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - PALO - CARIGARA - ORMOC RD - K0919+205 - K0923+000, K0926+000 - K0929+980 | Region VIII | Region VIII | On-Going | ₱385.6M | 26% | High risk95 | Flagged0.046 |
| 25I00010ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LT) (S00024LT) - K0921+553 - K0922+950, K0923+500 - K0929+000, K0933+500 - K0934+358, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱385.5M | 35% | High risk95 | Flagged0.042 |
| 25M00239PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1735 + 813 - K1738 + 574, GLAN, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱95.3M | 99% | High risk95 | Flagged0.016 |
| 25M00238PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1703 +824 - K1706 +581 (WITH-IN STATION LIMITS), GLAN, SARANGANI | Region XII | Region XII | On-Going | ₱85.6M | 34% | High risk95 | Flagged0.034 |
| 25M00237PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1691 + 570 - K1693 + 137 (WITH-IN STATION LIMITS), GLAN, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱85.5M | 86% | High risk95 | Flagged0.019 |
| 25M00240PREVENTIVE MAINTENANCE - SARANGGANI - DAVAO DEL SUR COASTAL RD - K1706 + 581 - K1709 + 330 (WITH-IN STATION LIMITS), GLAN, SARANGANI | Region XII | Region XII | On-Going | ₱90.4M | 92% | High risk95 | Flagged0.019 |
| 25M00176PREVENTIVE MAINTENANCE - DEMOLOC-LITTLE BAGUIO-ALABEL RD - K1660+000 - K1661+073 (P00910283MN), ALABEL, SARANGANI | Region XII | Region XII | On-Going | ₱94.3M | 94% | High risk95 | Flagged0.017 |
| 25M00252PREVENTIVE MAINTENANCE - JCT DIGOS-BUAYAN AIRPORT RD (S00247MN) - K1652 + 473 - K1653 + 239, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱94.7M | 82% | High risk95 | Flagged0.021 |
| 25M00027REHABILITATION/RECONSTRUCTION OF ROADS SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-GENERAL SANTOS CITY-T'BOLI-SURALLAH RD - (S01483MN)K1682+674-K1682+748.98, K1683+915-K1684+012, K1685+106-K1685+204, K1686+113-K1686+136, K1686+184-K1686+232, GENERAL SANTOS CITY, | Region XII | Region XII | On-Going | ₱180.5M | 20% | High risk95 | Flagged0.051 |
| 25M00030CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - MAHARLIKA HIGHWAY (MAKAR-MARBEL RD) - K1659 + 358 - K1660 + 453, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱132.1M | 64% | High risk94 | Flagged0.032 |
| 25NG0096REHABILITATION OF SEAWALL, BARANGAY PUNTA BILAR, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱95.3M | 53% | High risk94 | Flagged0.023 |
| 25K00243PREVENTIVE MAINTENANCE-SECONDARY RODS, BUKIDNON BDRY-NORTH COTABATO RD (S01606MN) - CHAINAGE 0 - CHAINAGE 10000 | Region X | Region X | On-Going | ₱235.4M | 47% | High risk93 | Flagged0.034 |
| 25KB0016CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF MIGPAJO BRIDGE (B01435MN) ALONG MARAMAG-MARADUGAO ROAD, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱57.3M | 88% | High risk91 | —-0.017 |
| 25K00056CONSTRUCTION OF BY-PASS AND DIVERSION ROADS GINGOOG BYPASS ROAD, PHASE XI, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱42.9M | 22% | High risk91 | Flagged0.008 |
| 25ME0046CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, ALABEL, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱93.5M | 77% | High risk90 | Flagged0.006 |
| 23JF0078FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY AZUSANO, TITAY, ZAMBOANGA SIBUGAY (PHASE 1) | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱95.3M | 100% | High risk87 | Flagged0.029 |
| 23JF0079FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY ACHASOL, TITAY, ZAMBOANGA SIBUGAY (PHASE 1) | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱27.6M | 100% | High risk86 | Flagged0.017 |
| 24L00340CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PADADA-MAINIT RIVER (TANWALANG SECTION), PACKAGE E, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱190.9M | 82% | High risk80 | Flagged0.031 |
| 24L00204CONSTRUCTION OF EARTH DIKE ALONG LOCUTAN RIVER (GOING TO TUGANAY RIVER) PHASE 1, CARMEN, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱185.9M | 37% | High risk79 | Flagged0.052 |
| 24K00433CONST./IMPRVT. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM TRIP) ACCESS ROAD LEADING TO KIPILAS FALLS WITH BRIDGE, KITAOTAO, BUKIDNON (PACKAGE 2) | Region X | Region X | On-Going | ₱95.3M | 96% | High risk79 | Flagged0.002 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18J00148SANGA-SANGA AIRPORT DEVELOPMENT PROJECT, SANGA SANGA, BONGAO, TAWI-TAWI | Region IX | Region IX | On-Going | ₱320.9M | 65% | High risk63 | Flagged0.071 |
| 24L00204CONSTRUCTION OF EARTH DIKE ALONG LOCUTAN RIVER (GOING TO TUGANAY RIVER) PHASE 1, CARMEN, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱185.9M | 37% | High risk79 | Flagged0.052 |
| 25M00027REHABILITATION/RECONSTRUCTION OF ROADS SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-GENERAL SANTOS CITY-T'BOLI-SURALLAH RD - (S01483MN)K1682+674-K1682+748.98, K1683+915-K1684+012, K1685+106-K1685+204, K1686+113-K1686+136, K1686+184-K1686+232, GENERAL SANTOS CITY, | Region XII | Region XII | On-Going | ₱180.5M | 20% | High risk95 | Flagged0.051 |
| 23NC0078CONSTRUCTION OF BANK PROTECTION OF ADGAWAN RIVER NEAR ADGAWAN BRIDGE, LA PAZ, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱96.5M | 93% | High risk63 | Flagged0.048 |
| 17J00034CONSTRUCTION OF CONCRETE STRUCTURES AT ZAMBOANGA CITY BY-PASS ROAD (CULIANAN-PATALON SECTION), PACKAGE 2, ZAMBOANGA CITY 1ST LD | Region IX | Region IX | On-Going | ₱181.4M | 100% | High risk72 | Flagged0.047 |
| 25I00048ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - PALO - CARIGARA - ORMOC RD - K0919+205 - K0923+000, K0926+000 - K0929+980 | Region VIII | Region VIII | On-Going | ₱385.6M | 26% | High risk95 | Flagged0.046 |
| 25I00010ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LT) (S00024LT) - K0921+553 - K0922+950, K0923+500 - K0929+000, K0933+500 - K0934+358, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱385.5M | 35% | High risk95 | Flagged0.042 |
| 23M00256CONSTRUCTION OF RIVER BANK PROTECTION ALONG ALA RIVER, PACKAGE 1, STA 0+027-STA 0+750, SURALLAH, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱144.4M | 99% | High risk67 | Flagged0.041 |
| 24M00308PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) (S00231MN) - K1640+000 - K1641+500, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱173.7M | 83% | High risk69 | Flagged0.035 |
| 25M00238PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1703 +824 - K1706 +581 (WITH-IN STATION LIMITS), GLAN, SARANGANI | Region XII | Region XII | On-Going | ₱85.6M | 34% | High risk95 | Flagged0.034 |
| 25K00243PREVENTIVE MAINTENANCE-SECONDARY RODS, BUKIDNON BDRY-NORTH COTABATO RD (S01606MN) - CHAINAGE 0 - CHAINAGE 10000 | Region X | Region X | On-Going | ₱235.4M | 47% | High risk93 | Flagged0.034 |
| 23GN0130ROAD INFRASTRUCTURE PROJECTS ALONG BACOLOD SOUTH ROAD, (S00127NR), PULUPANDAN, VALLADOLID & SAN ENRIQUE, NEGROS OCCIDENTAL, K0024+(-881) - K0034+000 | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱95.4M | 100% | High risk74 | Flagged0.034 |
| 24M00309PREVENTIVE MAINTENANCE -MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) (S00231MN) - K1641+500 - K1643+000, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱173.4M | 100% | High risk68 | Flagged0.032 |
| 24M00310PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) (S00231MN) - K1643+000 - K1644+500, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱173.4M | 100% | High risk68 | Flagged0.032 |
| 25M00030CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - MAHARLIKA HIGHWAY (MAKAR-MARBEL RD) - K1659 + 358 - K1660 + 453, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱132.1M | 64% | High risk94 | Flagged0.032 |
| 24L00340CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PADADA-MAINIT RIVER (TANWALANG SECTION), PACKAGE E, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱190.9M | 82% | High risk80 | Flagged0.031 |
| 23JF0078FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY AZUSANO, TITAY, ZAMBOANGA SIBUGAY (PHASE 1) | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱95.3M | 100% | High risk87 | Flagged0.029 |
| 23MB0122CONSTRUCTION OF SILWAY RIVER BOULEVARD, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | On-Going | ₱96M | 22% | Medium risk50 | Flagged0.026 |
| 22L00015CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - JCT. DAVAO CITY DIVERSION ROAD - MAGTUOD RD. - NEW CARMEN - BIAO ESCUELA - BIAO JOAQUIN - JCT. DAVAO BUKIDNON RD., DAVAO CITY | Region XI | Region XI | On-Going | ₱218.5M | 26% | High risk66 | Flagged0.026 |
| 18M00041WIDENING OF PERMANENT BRIDGE UPPER MAKAR BR. (B01674MN) ALONG ALBERT MORROW BLVD., ALABEL, SARANGANI PROVINCE | Region XII | Region XII | Completed | ₱192.4M | 100% | Medium risk52 | Flagged0.026 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 301 | 17M00035ROAD WIDENING OF COTABATO-MARBEL ROAD, K1758+900 K1762+269 (CHAINAGE 47948 -CHAINAGE 51668), STO. NIÑO, SOUTH COTABATO | Region XII | Region XII | Completed | ₱89.6M | 100% | Medium risk45 | —-0.033 |
| 302 | 22KI0006ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, JIMENEZ OLD ROUTE, K1724+(-867) - K1724+(-624); K1724+(-563) - K1724+153, JIMENEZ, MISAMIS OCCIDENTAL. | Region X | Misamis Occidental 1st DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.094 |
| 303 | 22KI0003ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS, OROQUIETA CITY - PLARIDEL - CALAMBA - SAPANG DALAGA ROAD, K1792+441 - K1793+051, SAPANG DALAGA, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 1st DEO | Completed | ₱26.7M | 100% | Medium risk45 | —-0.094 |
| 304 | 17M00049ROAD WIDENING OF DIGOS-MAKAR ROAD, K1618+156.15 - K1618+400 (CHAINAGE 26557.15 - CHAINAGE 26801), K1618+903 - K1619+809.67 (CHAINAGE 27304 - CHAINAGE 28214.67), K1619+896.42 - K1623+290 (CHAINAGE 28301.42 - CHAINAGE 31697), K1623+420 - K1623+490.15 (CHAIN | Region XII | Region XII | Completed | ₱160.1M | 100% | Medium risk45 | —-0.030 |
| 305 | 18KI0074ASSETS PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE, CALAMBA - BALIANGAO ROAD, K1783+100 - K1785+188, BALIANGAO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 1st DEO | Completed | ₱20.3M | 100% | Medium risk45 | —-0.095 |
| 306 | 20M00034CONSTRUCTION OF BYPASS/DIVERSION ROADS-BANGA-TUPI-MALUNGON ROAD, (BANGA-TUPI SECTION), PACKAGE C, STA. 26+209 - STA. 27+509, BANGA, SOUTH COTABATO | Region XII | Region XII | Completed | ₱103.6M | 100% | Medium risk45 | —-0.072 |
| 307 | 17M00034ROAD WIDENING OF COTABATO-MARBEL ROAD, K1753+380 K1761+900 (CHAINAGE 42728 - CHAINAGE 51293), STO NIÑO, SOUTH COTABATO | Region XII | Region XII | Completed | ₱144.8M | 100% | Medium risk45 | —-0.025 |
| 308 | 23ME0056CONST. OF FLOOD CONTROL STRUCTURE, SITIO FAMORCAN, BRGY. PAG-ASA, ALABEL, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱99M | 100% | Medium risk45 | —-0.051 |
| 309 | 22KI0004ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS OZAMIS CITY-OROQUIETA CITY ROAD, K1723+779-K1724+210, JIMENEZ, MISAMIS OCCIDENTAL. | Region X | Misamis Occidental 1st DEO | Completed | ₱18.3M | 100% | Medium risk45 | —-0.094 |
| 310 | 21M00060CONSTRUCTION OF ROAD ALONG JCT. NHW ILAYA, DATALBUKAY-LANAO KAPANGLAO ROAD (PACKAGE 1& 2), STA 0 +000- STA. 2+300, STA. 2+760-STA. 5+500, GLAN, SARANGANI | Region XII | Region XII | Completed | ₱193M | 100% | Medium risk44 | —-0.040 |
| 311 | 21LB0018CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, F. TORRES BRIDGE (DOWNSTREAM), DAVAO RIVER, BRGY. 9-A, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱29.4M | 100% | Medium risk44 | —-0.060 |
| 312 | 19M00018PREVENTIVE MAINTENANCE MAKAR-MARBEL RD K1656+000-K1658+035, GENERAL SANTOS CITY | Region XII | Region XII | Completed | ₱106.1M | 100% | Medium risk44 | —-0.071 |
| 313 | 25MF0003PREVENTIVE MAINTENANCE OF ROAD:ASPHALT OVERLAY - DULAWAN - MARBEL RD - K1764 + (-526) - K1764 + 344 | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱98.4M | 100% | Medium risk44 | —-0.049 |
| 314 | 25MF0004PREVENTIVE MAINTENANCE OF ROAD:ASPHALT OVERLAY - DULAWAN - MARBEL RD - K1762 + 433 - K1763 + 418 | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱110M | 100% | Medium risk44 | —-0.048 |
| 315 | 21KK0061CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GAHUB RIVER (DOWNSTREAM, RIGHT SIDE), GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱35.5M | 100% | Medium risk44 | —-0.076 |
| 316 | 22KI0001ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS, OROQUIETA CITY - PLARIDEL - CALAMBA - SAPANG DALAGA ROAD, K1744+196 - K1744+380, OROQUIETA CITY, MISAMIS OCCIDENTAL. | Region X | Misamis Occidental 1st DEO | Completed | ₱8.2M | 100% | Medium risk44 | —-0.095 |
| 317 | 25MG0018PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-SURALLAH-LAKE SEBU-MAITUM RD-K1733+867-K1734+975, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱45M | 100% | Medium risk43 | —-0.050 |
| 318 | 25MG0008PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-SURALLAH-LAKE SEBU-MAITUM RD-K1742+848-K1743+423, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱9.7M | 100% | Medium risk43 | —-0.052 |
| 319 | 22M00064CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - SILWAY 8 - UPPER LABAY ROAD, (PACKAGE B), STA. 20+080- STA 21+220 STA 21+280-STA 22+000, STA22+320- STA. 23+339, GENERAL SANTOS CITY, | Region XII | Region XII | Completed | ₱106M | 100% | Medium risk43 | —-0.065 |
| 320 | 21M00051CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE-SURALLAH-TBOLI- SAN JOSE ROAD (GEN. SANTOS CITY), PACKAGE C, STA. 22+925-STA. 22+950, STA. 26+115-STA. 26+163 STA. 26+830-STA. 26+900, STA. 27+865-STA. 27+900, | Region XII | Region XII | Completed | ₱106.2M | 100% | Medium risk43 | —-0.069 |
| 321 | 17MB0095REPAIR/REHABILITATION/IMPROVEMENT (ASPHALT OVERLAY) ALONG DIGOS-MAKAR ROAD, K1651+835 - K1654+941, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | South Cotabato 1st DEO | Completed | ₱97.5M | 100% | Medium risk43 | Flagged0.022 |
| 322 | 22M00086CONSTRUCTION OF MISSING LINKS/ NEW ROADS - SURALLAH-TBOLI-SAN JOSE ROAD, GEN. SANTOS CITY, STA. 49+716 - STA. 51+300, TBOLI, SOUTH COTABATO | Region XII | Region XII | Completed | ₱101.3M | 100% | Medium risk43 | —-0.066 |
| 323 | 23M00166PREVENTIVE MAINTENANCE - COTABATO-LANAO ROAD, K1858+526 - K1859+642, SULTAN KUDARAT, MAGUINDANAO | Region XII | Region XII | Completed | ₱95.9M | 100% | Medium risk43 | —-0.079 |
| 324 | 22KK0077CONSTRUCTION OF MULTI-PURPOSE BUILDING (CHILD DEVELOPMENT CENTER), MAGSAYSAY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.093 |
| 325 | 22KK0078CONSTRUCTION OF MULTI-PURPOSE BUILDING (CHILD DEVELOPMENT CENTER), MEDINA, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱4.9M | 100% | Medium risk43 | —-0.095 |