Opening the dossier…
Opening the dossier…
Contractor dossier
383 projects on file, including joint ventures this contractor is part of.
Total projects
383
Total budget
₱32.7B
Average progress
94.6%
Completion rate
70.5%
Average risk score
52.6
Medium risk on average, out of 100
Flagged as unusual
49
12.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 113 | ₱9.9B | 44.9 | 18 | 96.3% |
| Region XI | 103 | ₱8.5B | 54.0 | 8 | 95.0% |
| Region X | 88 | ₱7B | 54.0 | 10 | 94.3% |
| Region IX | 24 | ₱2.3B | 66.5 | 6 | 95.7% |
| Negros Island Region | 18 | ₱1.2B | 57.6 | 2 | 98.9% |
| Region XIII | 15 | ₱1.1B | 51.2 | 3 | 85.7% |
| Region VII | 9 | ₱799.1M | 60.4 | 0 | 100.0% |
| Region VIII | 8 | ₱1.2B | 66.5 | 2 | 78.4% |
| Central Office | 3 | ₱532.9M | 56.2 | 0 | 64.5% |
| Region V | 1 | ₱95.2M | 69.7 | 0 | 99.4% |
| Region IV-A | 1 | ₱14.4M | 46.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 270 | ₱22.4B | 50.4 | 16 | 97.4% |
| Flood Control and Drainage | 56 | ₱4.3B | 48.8 | 5 | 92.4% |
| Bridges | 17 | ₱1.5B | 52.4 | 5 | 94.0% |
| GAA 2025 OO-1 | 12 | ₱1.9B | 94.4 | 12 | 58.3% |
| OTHER | 11 | ₱1.1B | 75.8 | 8 | 82.2% |
| Buildings and Facilities | 10 | ₱785.6M | 44.8 | 1 | 96.5% |
| Bridges, Roads | 4 | ₱473M | 57.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 2 | ₱150.8M | 90.6 | 1 | 82.7% |
| GAA 2025 SSP | 1 | ₱95.3M | 94.1 | 1 | 52.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00048ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - PALO - CARIGARA - ORMOC RD - K0919+205 - K0923+000, K0926+000 - K0929+980 | Region VIII | Region VIII | On-Going | ₱385.6M | 26% | High risk95 | Flagged0.046 |
| 25I00010ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LT) (S00024LT) - K0921+553 - K0922+950, K0923+500 - K0929+000, K0933+500 - K0934+358, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱385.5M | 35% | High risk95 | Flagged0.042 |
| 25M00239PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1735 + 813 - K1738 + 574, GLAN, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱95.3M | 99% | High risk95 | Flagged0.016 |
| 25M00238PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1703 +824 - K1706 +581 (WITH-IN STATION LIMITS), GLAN, SARANGANI | Region XII | Region XII | On-Going | ₱85.6M | 34% | High risk95 | Flagged0.034 |
| 25M00237PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1691 + 570 - K1693 + 137 (WITH-IN STATION LIMITS), GLAN, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱85.5M | 86% | High risk95 | Flagged0.019 |
| 25M00240PREVENTIVE MAINTENANCE - SARANGGANI - DAVAO DEL SUR COASTAL RD - K1706 + 581 - K1709 + 330 (WITH-IN STATION LIMITS), GLAN, SARANGANI | Region XII | Region XII | On-Going | ₱90.4M | 92% | High risk95 | Flagged0.019 |
| 25M00176PREVENTIVE MAINTENANCE - DEMOLOC-LITTLE BAGUIO-ALABEL RD - K1660+000 - K1661+073 (P00910283MN), ALABEL, SARANGANI | Region XII | Region XII | On-Going | ₱94.3M | 94% | High risk95 | Flagged0.017 |
| 25M00252PREVENTIVE MAINTENANCE - JCT DIGOS-BUAYAN AIRPORT RD (S00247MN) - K1652 + 473 - K1653 + 239, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱94.7M | 82% | High risk95 | Flagged0.021 |
| 25M00027REHABILITATION/RECONSTRUCTION OF ROADS SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-GENERAL SANTOS CITY-T'BOLI-SURALLAH RD - (S01483MN)K1682+674-K1682+748.98, K1683+915-K1684+012, K1685+106-K1685+204, K1686+113-K1686+136, K1686+184-K1686+232, GENERAL SANTOS CITY, | Region XII | Region XII | On-Going | ₱180.5M | 20% | High risk95 | Flagged0.051 |
| 25M00030CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - MAHARLIKA HIGHWAY (MAKAR-MARBEL RD) - K1659 + 358 - K1660 + 453, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱132.1M | 64% | High risk94 | Flagged0.032 |
| 25NG0096REHABILITATION OF SEAWALL, BARANGAY PUNTA BILAR, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱95.3M | 53% | High risk94 | Flagged0.023 |
| 25K00243PREVENTIVE MAINTENANCE-SECONDARY RODS, BUKIDNON BDRY-NORTH COTABATO RD (S01606MN) - CHAINAGE 0 - CHAINAGE 10000 | Region X | Region X | On-Going | ₱235.4M | 47% | High risk93 | Flagged0.034 |
| 25KB0016CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF MIGPAJO BRIDGE (B01435MN) ALONG MARAMAG-MARADUGAO ROAD, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱57.3M | 88% | High risk91 | —-0.017 |
| 25K00056CONSTRUCTION OF BY-PASS AND DIVERSION ROADS GINGOOG BYPASS ROAD, PHASE XI, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱42.9M | 22% | High risk91 | Flagged0.008 |
| 25ME0046CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, ALABEL, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱93.5M | 77% | High risk90 | Flagged0.006 |
| 23JF0078FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY AZUSANO, TITAY, ZAMBOANGA SIBUGAY (PHASE 1) | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱95.3M | 100% | High risk87 | Flagged0.029 |
| 23JF0079FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY ACHASOL, TITAY, ZAMBOANGA SIBUGAY (PHASE 1) | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱27.6M | 100% | High risk86 | Flagged0.017 |
| 24L00340CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PADADA-MAINIT RIVER (TANWALANG SECTION), PACKAGE E, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱190.9M | 82% | High risk80 | Flagged0.031 |
| 24L00204CONSTRUCTION OF EARTH DIKE ALONG LOCUTAN RIVER (GOING TO TUGANAY RIVER) PHASE 1, CARMEN, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱185.9M | 37% | High risk79 | Flagged0.052 |
| 24K00433CONST./IMPRVT. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM TRIP) ACCESS ROAD LEADING TO KIPILAS FALLS WITH BRIDGE, KITAOTAO, BUKIDNON (PACKAGE 2) | Region X | Region X | On-Going | ₱95.3M | 96% | High risk79 | Flagged0.002 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18J00148SANGA-SANGA AIRPORT DEVELOPMENT PROJECT, SANGA SANGA, BONGAO, TAWI-TAWI | Region IX | Region IX | On-Going | ₱320.9M | 65% | High risk63 | Flagged0.071 |
| 24L00204CONSTRUCTION OF EARTH DIKE ALONG LOCUTAN RIVER (GOING TO TUGANAY RIVER) PHASE 1, CARMEN, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱185.9M | 37% | High risk79 | Flagged0.052 |
| 25M00027REHABILITATION/RECONSTRUCTION OF ROADS SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-GENERAL SANTOS CITY-T'BOLI-SURALLAH RD - (S01483MN)K1682+674-K1682+748.98, K1683+915-K1684+012, K1685+106-K1685+204, K1686+113-K1686+136, K1686+184-K1686+232, GENERAL SANTOS CITY, | Region XII | Region XII | On-Going | ₱180.5M | 20% | High risk95 | Flagged0.051 |
| 23NC0078CONSTRUCTION OF BANK PROTECTION OF ADGAWAN RIVER NEAR ADGAWAN BRIDGE, LA PAZ, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱96.5M | 93% | High risk63 | Flagged0.048 |
| 17J00034CONSTRUCTION OF CONCRETE STRUCTURES AT ZAMBOANGA CITY BY-PASS ROAD (CULIANAN-PATALON SECTION), PACKAGE 2, ZAMBOANGA CITY 1ST LD | Region IX | Region IX | On-Going | ₱181.4M | 100% | High risk72 | Flagged0.047 |
| 25I00048ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - PALO - CARIGARA - ORMOC RD - K0919+205 - K0923+000, K0926+000 - K0929+980 | Region VIII | Region VIII | On-Going | ₱385.6M | 26% | High risk95 | Flagged0.046 |
| 25I00010ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LT) (S00024LT) - K0921+553 - K0922+950, K0923+500 - K0929+000, K0933+500 - K0934+358, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱385.5M | 35% | High risk95 | Flagged0.042 |
| 23M00256CONSTRUCTION OF RIVER BANK PROTECTION ALONG ALA RIVER, PACKAGE 1, STA 0+027-STA 0+750, SURALLAH, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱144.4M | 99% | High risk67 | Flagged0.041 |
| 24M00308PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) (S00231MN) - K1640+000 - K1641+500, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱173.7M | 83% | High risk69 | Flagged0.035 |
| 25M00238PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1703 +824 - K1706 +581 (WITH-IN STATION LIMITS), GLAN, SARANGANI | Region XII | Region XII | On-Going | ₱85.6M | 34% | High risk95 | Flagged0.034 |
| 25K00243PREVENTIVE MAINTENANCE-SECONDARY RODS, BUKIDNON BDRY-NORTH COTABATO RD (S01606MN) - CHAINAGE 0 - CHAINAGE 10000 | Region X | Region X | On-Going | ₱235.4M | 47% | High risk93 | Flagged0.034 |
| 23GN0130ROAD INFRASTRUCTURE PROJECTS ALONG BACOLOD SOUTH ROAD, (S00127NR), PULUPANDAN, VALLADOLID & SAN ENRIQUE, NEGROS OCCIDENTAL, K0024+(-881) - K0034+000 | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱95.4M | 100% | High risk74 | Flagged0.034 |
| 24M00309PREVENTIVE MAINTENANCE -MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) (S00231MN) - K1641+500 - K1643+000, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱173.4M | 100% | High risk68 | Flagged0.032 |
| 24M00310PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) (S00231MN) - K1643+000 - K1644+500, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱173.4M | 100% | High risk68 | Flagged0.032 |
| 25M00030CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - MAHARLIKA HIGHWAY (MAKAR-MARBEL RD) - K1659 + 358 - K1660 + 453, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱132.1M | 64% | High risk94 | Flagged0.032 |
| 24L00340CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PADADA-MAINIT RIVER (TANWALANG SECTION), PACKAGE E, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱190.9M | 82% | High risk80 | Flagged0.031 |
| 23JF0078FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY AZUSANO, TITAY, ZAMBOANGA SIBUGAY (PHASE 1) | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱95.3M | 100% | High risk87 | Flagged0.029 |
| 23MB0122CONSTRUCTION OF SILWAY RIVER BOULEVARD, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | On-Going | ₱96M | 22% | Medium risk50 | Flagged0.026 |
| 22L00015CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - JCT. DAVAO CITY DIVERSION ROAD - MAGTUOD RD. - NEW CARMEN - BIAO ESCUELA - BIAO JOAQUIN - JCT. DAVAO BUKIDNON RD., DAVAO CITY | Region XI | Region XI | On-Going | ₱218.5M | 26% | High risk66 | Flagged0.026 |
| 18M00041WIDENING OF PERMANENT BRIDGE UPPER MAKAR BR. (B01674MN) ALONG ALBERT MORROW BLVD., ALABEL, SARANGANI PROVINCE | Region XII | Region XII | Completed | ₱192.4M | 100% | Medium risk52 | Flagged0.026 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 351 | 22ME0052ASPHALT OVERLAY ALONG SDSCR K1700+000-K1703+000, GLAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱70.5M | 100% | Medium risk32 | —-0.076 |
| 352 | 25MC0024CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PALIBGON RIVER, BARANGAY BANTAC, MAGPET, NORTH COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱47.5M | 66% | Medium risk31 | —-0.021 |
| 353 | 22ME0091ASPHALT OVERLAY ALONG SDSCR, K1673+750.25 - K1677+242, MALAPATAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱57.9M | 100% | Medium risk31 | —-0.078 |
| 354 | 23MB0056CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS, MAKAR - MARBEL RD - K1655 + 205 - K1656 + 225 | Region XII | South Cotabato 1st DEO | Completed | ₱48.5M | 100% | Medium risk30 | —-0.080 |
| 355 | 25MG0017PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-SURALLAH-LAKE SEBU-MAITUM ROAD-K1733+(-305)-K1733+867, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱51.1M | 100% | Low risk30 | —-0.085 |
| 356 | 24ME0064ASPHALT OVERLAY ALONG SARANGANI - SULTAN KUDARAT COASTAL RD - K1743+965 - K1745+320, KIAMBA, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱54.4M | 100% | Low risk29 | —-0.080 |
| 357 | 23M00058CONSTRUCTION OF BY-PASS ROAD AND DIVERSION ROADS SILWAY 8 UPPER LABAY ROAD, (PACKAGE D), STA. 23+554 STA. 23+584, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱30.4M | 100% | Low risk29 | —-0.015 |
| 358 | 22MC0018CONSTRUCTION OF FLOOD CONTROL DIKE ALONG KABACAN RIVER (TUAEL SECTION) L/S, BRGY. TUAEL, PRESIDENT ROXAS, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱48.5M | 100% | Low risk28 | —-0.072 |
| 359 | 24M00167PREVENTIVE MAINTENANCE - COTABATO-MARBEL RD - K1711 + 000 - K1711 + 314, KORONADAL CITY, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱43.1M | 100% | Low risk28 | —-0.052 |
| 360 | 19MB0002PREVENTIVE MAINTENANCE - PRIMARY ROAD, JCT. DIGOS-MAKAR ROAD, K1650+729 - K1651+835, K1654+741 - K1654+877 | Region XII | South Cotabato 1st DEO | Completed | ₱31.2M | 100% | Low risk28 | —-0.085 |
| 361 | 18MG0071CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES, AND ECONOMIC ZONES:NRJ STO. NIÑO-KIBANG ROAD CONNECTING TO COFFEE, CACAO, PEANUT AND CORN PLANTATION AND PROCESSING AREAS AND NATIONAL HIGHWAY IN SUPPORT OF AGRIBUSINESS INDUSTRY, STO | Region XII | South Cotabato 2nd DEO | Completed | ₱36.7M | 100% | Low risk28 | —-0.086 |
| 362 | 23MG0044PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-COTABATO-MARBEL RD-K1741+279-K1742+333, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱39.1M | 100% | Low risk27 | —-0.088 |
| 363 | 23MB0076CONSTRUCTION OF CONCRETE REVETMENT, BUAYAN RIVER, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱51.1M | 100% | Low risk27 | —-0.066 |
| 364 | 21MF0002MARBEL-ALLAH VALLEY-COTABATO ROAD-K1768+248-K1768+743 | Region XII | Sultan Kudarat 1st DEO | Completed | ₱24.1M | 100% | Low risk27 | —-0.087 |
| 365 | 23MF0001MARBEL-ALLAH VALLEY-COTABATO RD - K1765 + 519 - K1765 + 829 | Region XII | Sultan Kudarat 1st DEO | Completed | ₱25.7M | 100% | Low risk27 | —-0.087 |
| 366 | 23ME0032ASPHALT OVERLAY ALONG SDSCR, K1654+(-291)-K1654+(-206), K1654+(-206)-K1654+(-306), K1654+(-306)-K1654+000, K1654+000-K1654+395, ALABEL, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱29.8M | 100% | Low risk27 | —-0.084 |
| 367 | 23MF0059COMPLETION OF DIALYSIS AND DIAGNOSTIC CENTER, TACURONG CITY, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱29.6M | 100% | Low risk27 | —-0.079 |
| 368 | 22MH0009CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ISULAN JCT - NINOY AQUINO RD - K1843+530 - K1843+630 SEN. NINOY AQUINO, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱29.5M | 100% | Low risk27 | —-0.081 |
| 369 | 21MF0004ISULAN JUNCTION-NINOY AQUINO ROAD-K1776+086-K1776+813 | Region XII | Sultan Kudarat 1st DEO | Completed | ₱24.1M | 100% | Low risk27 | —-0.087 |
| 370 | 18MG0065CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:CONSTRUCTIONS OF BANK PROTECTION ALONG BANGA RIVER STA. 0+000-STA.0+250, STA.0+470-STA.1+170, BRGY. PUNONG GRANDE, BANGA, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱47.2M | 100% | Low risk26 | —-0.066 |
| 371 | 22ME0053ASPHALT OVERLAY ALONG SDSCR K1731+000-K1734-075, GLAN SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱38.2M | 100% | Low risk26 | —-0.081 |
| 372 | 22MF0027CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO BALANACAN, BRGY. UDTONG, LAMBAYONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱35.7M | 100% | Low risk26 | —-0.073 |
| 373 | 22MB0002PREVENTIVE MAINTENANCE - PRIMARY ROADS - MARBEL - MAKAR RD (S00253MN) - K1669 + 265 - K1669 +792.86 | Region XII | South Cotabato 1st DEO | Completed | ₱29.4M | 100% | Low risk26 | —-0.085 |
| 374 | 25MG0007PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-SURALLAH-LAKE SEBU-MAITUM RD-K1740+052-K1740+594, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱24M | 100% | Low risk26 | —-0.086 |
| 375 | 22MB0003PREVENTIVE MAINTENANCE - PRIMARY ROADS - MARBEL - MAKAR RD (S00253MN) - K1685 + 000 - K1685 + 353.24 | Region XII | South Cotabato 1st DEO | Completed | ₱20M | 100% | Low risk26 | —-0.086 |