Contractor dossier
383 projects on file, including joint ventures this contractor is part of.
Total projects
383
Total budget
₱32.7B
Average progress
94.6%
Completion rate
70.5%
Average risk score
52.6
Medium risk on average, out of 100
Flagged as unusual
49
12.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 113 | ₱9.9B | 44.9 | 18 | 96.3% |
| Region XI | 103 | ₱8.5B | 54.0 | 8 | 95.0% |
| Region X | 88 | ₱7B | 54.0 | 10 | 94.3% |
| Region IX | 24 | ₱2.3B | 66.5 | 6 | 95.7% |
| Negros Island Region | 18 | ₱1.2B | 57.6 | 2 | 98.9% |
| Region XIII | 15 | ₱1.1B | 51.2 | 3 | 85.7% |
| Region VII | 9 | ₱799.1M | 60.4 | 0 | 100.0% |
| Region VIII | 8 | ₱1.2B | 66.5 | 2 | 78.4% |
| Central Office | 3 | ₱532.9M | 56.2 | 0 | 64.5% |
| Region V | 1 | ₱95.2M | 69.7 | 0 | 99.4% |
| Region IV-A | 1 | ₱14.4M | 46.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 270 | ₱22.4B | 50.4 | 16 | 97.4% |
| Flood Control and Drainage | 56 | ₱4.3B | 48.8 | 5 | 92.4% |
| Bridges | 17 | ₱1.5B | 52.4 | 5 | 94.0% |
| GAA 2025 OO-1 | 12 | ₱1.9B | 94.4 | 12 | 58.3% |
| OTHER | 11 | ₱1.1B | 75.8 | 8 | 82.2% |
| Buildings and Facilities | 10 | ₱785.6M | 44.8 | 1 | 96.5% |
| Bridges, Roads | 4 | ₱473M | 57.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 2 | ₱150.8M | 90.6 | 1 | 82.7% |
| GAA 2025 SSP | 1 | ₱95.3M | 94.1 | 1 | 52.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00048ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - PALO - CARIGARA - ORMOC RD - K0919+205 - K0923+000, K0926+000 - K0929+980 | Region VIII | Region VIII | On-Going | ₱385.6M | 26% | High risk95 | Flagged0.046 |
| 25I00010ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LT) (S00024LT) - K0921+553 - K0922+950, K0923+500 - K0929+000, K0933+500 - K0934+358, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱385.5M | 35% | High risk95 | Flagged0.042 |
| 25M00239PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1735 + 813 - K1738 + 574, GLAN, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱95.3M | 99% | High risk95 | Flagged0.016 |
| 25M00238PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1703 +824 - K1706 +581 (WITH-IN STATION LIMITS), GLAN, SARANGANI | Region XII | Region XII | On-Going | ₱85.6M | 34% | High risk95 | Flagged0.034 |
| 25M00237PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1691 + 570 - K1693 + 137 (WITH-IN STATION LIMITS), GLAN, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱85.5M | 86% | High risk95 | Flagged0.019 |
| 25M00240PREVENTIVE MAINTENANCE - SARANGGANI - DAVAO DEL SUR COASTAL RD - K1706 + 581 - K1709 + 330 (WITH-IN STATION LIMITS), GLAN, SARANGANI | Region XII | Region XII | On-Going | ₱90.4M | 92% | High risk95 | Flagged0.019 |
| 25M00176PREVENTIVE MAINTENANCE - DEMOLOC-LITTLE BAGUIO-ALABEL RD - K1660+000 - K1661+073 (P00910283MN), ALABEL, SARANGANI | Region XII | Region XII | On-Going | ₱94.3M | 94% | High risk95 | Flagged0.017 |
| 25M00252PREVENTIVE MAINTENANCE - JCT DIGOS-BUAYAN AIRPORT RD (S00247MN) - K1652 + 473 - K1653 + 239, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱94.7M | 82% | High risk95 | Flagged0.021 |
| 25M00027REHABILITATION/RECONSTRUCTION OF ROADS SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-GENERAL SANTOS CITY-T'BOLI-SURALLAH RD - (S01483MN)K1682+674-K1682+748.98, K1683+915-K1684+012, K1685+106-K1685+204, K1686+113-K1686+136, K1686+184-K1686+232, GENERAL SANTOS CITY, | Region XII | Region XII | On-Going | ₱180.5M | 20% | High risk95 | Flagged0.051 |
| 25M00030CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - MAHARLIKA HIGHWAY (MAKAR-MARBEL RD) - K1659 + 358 - K1660 + 453, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱132.1M | 64% | High risk94 | Flagged0.032 |
| 25NG0096REHABILITATION OF SEAWALL, BARANGAY PUNTA BILAR, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱95.3M | 53% | High risk94 | Flagged0.023 |
| 25K00243PREVENTIVE MAINTENANCE-SECONDARY RODS, BUKIDNON BDRY-NORTH COTABATO RD (S01606MN) - CHAINAGE 0 - CHAINAGE 10000 | Region X | Region X | On-Going | ₱235.4M | 47% | High risk93 | Flagged0.034 |
| 25KB0016CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF MIGPAJO BRIDGE (B01435MN) ALONG MARAMAG-MARADUGAO ROAD, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱57.3M | 88% | High risk91 | —-0.017 |
| 25K00056CONSTRUCTION OF BY-PASS AND DIVERSION ROADS GINGOOG BYPASS ROAD, PHASE XI, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱42.9M | 22% | High risk91 | Flagged0.008 |
| 25ME0046CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, ALABEL, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱93.5M | 77% | High risk90 | Flagged0.006 |
| 23JF0078FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY AZUSANO, TITAY, ZAMBOANGA SIBUGAY (PHASE 1) | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱95.3M | 100% | High risk87 | Flagged0.029 |
| 23JF0079FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY ACHASOL, TITAY, ZAMBOANGA SIBUGAY (PHASE 1) | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱27.6M | 100% | High risk86 | Flagged0.017 |
| 24L00340CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PADADA-MAINIT RIVER (TANWALANG SECTION), PACKAGE E, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱190.9M | 82% | High risk80 | Flagged0.031 |
| 24L00204CONSTRUCTION OF EARTH DIKE ALONG LOCUTAN RIVER (GOING TO TUGANAY RIVER) PHASE 1, CARMEN, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱185.9M | 37% | High risk79 | Flagged0.052 |
| 24K00433CONST./IMPRVT. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM TRIP) ACCESS ROAD LEADING TO KIPILAS FALLS WITH BRIDGE, KITAOTAO, BUKIDNON (PACKAGE 2) | Region X | Region X | On-Going | ₱95.3M | 96% | High risk79 | Flagged0.002 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18J00148SANGA-SANGA AIRPORT DEVELOPMENT PROJECT, SANGA SANGA, BONGAO, TAWI-TAWI | Region IX | Region IX | On-Going | ₱320.9M | 65% | High risk63 | Flagged0.071 |
| 24L00204CONSTRUCTION OF EARTH DIKE ALONG LOCUTAN RIVER (GOING TO TUGANAY RIVER) PHASE 1, CARMEN, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱185.9M | 37% | High risk79 | Flagged0.052 |
| 25M00027REHABILITATION/RECONSTRUCTION OF ROADS SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-GENERAL SANTOS CITY-T'BOLI-SURALLAH RD - (S01483MN)K1682+674-K1682+748.98, K1683+915-K1684+012, K1685+106-K1685+204, K1686+113-K1686+136, K1686+184-K1686+232, GENERAL SANTOS CITY, | Region XII | Region XII | On-Going | ₱180.5M | 20% | High risk95 | Flagged0.051 |
| 23NC0078CONSTRUCTION OF BANK PROTECTION OF ADGAWAN RIVER NEAR ADGAWAN BRIDGE, LA PAZ, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱96.5M | 93% | High risk63 | Flagged0.048 |
| 17J00034CONSTRUCTION OF CONCRETE STRUCTURES AT ZAMBOANGA CITY BY-PASS ROAD (CULIANAN-PATALON SECTION), PACKAGE 2, ZAMBOANGA CITY 1ST LD | Region IX | Region IX | On-Going | ₱181.4M | 100% | High risk72 | Flagged0.047 |
| 25I00048ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - PALO - CARIGARA - ORMOC RD - K0919+205 - K0923+000, K0926+000 - K0929+980 | Region VIII | Region VIII | On-Going | ₱385.6M | 26% | High risk95 | Flagged0.046 |
| 25I00010ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LT) (S00024LT) - K0921+553 - K0922+950, K0923+500 - K0929+000, K0933+500 - K0934+358, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱385.5M | 35% | High risk95 | Flagged0.042 |
| 23M00256CONSTRUCTION OF RIVER BANK PROTECTION ALONG ALA RIVER, PACKAGE 1, STA 0+027-STA 0+750, SURALLAH, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱144.4M | 99% | High risk67 | Flagged0.041 |
| 24M00308PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) (S00231MN) - K1640+000 - K1641+500, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱173.7M | 83% | High risk69 | Flagged0.035 |
| 25M00238PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1703 +824 - K1706 +581 (WITH-IN STATION LIMITS), GLAN, SARANGANI | Region XII | Region XII | On-Going | ₱85.6M | 34% | High risk95 | Flagged0.034 |
| 25K00243PREVENTIVE MAINTENANCE-SECONDARY RODS, BUKIDNON BDRY-NORTH COTABATO RD (S01606MN) - CHAINAGE 0 - CHAINAGE 10000 | Region X | Region X | On-Going | ₱235.4M | 47% | High risk93 | Flagged0.034 |
| 23GN0130ROAD INFRASTRUCTURE PROJECTS ALONG BACOLOD SOUTH ROAD, (S00127NR), PULUPANDAN, VALLADOLID & SAN ENRIQUE, NEGROS OCCIDENTAL, K0024+(-881) - K0034+000 | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱95.4M | 100% | High risk74 | Flagged0.034 |
| 24M00309PREVENTIVE MAINTENANCE -MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) (S00231MN) - K1641+500 - K1643+000, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱173.4M | 100% | High risk68 | Flagged0.032 |
| 24M00310PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) (S00231MN) - K1643+000 - K1644+500, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱173.4M | 100% | High risk68 | Flagged0.032 |
| 25M00030CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - MAHARLIKA HIGHWAY (MAKAR-MARBEL RD) - K1659 + 358 - K1660 + 453, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱132.1M | 64% | High risk94 | Flagged0.032 |
| 24L00340CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PADADA-MAINIT RIVER (TANWALANG SECTION), PACKAGE E, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱190.9M | 82% | High risk80 | Flagged0.031 |
| 23JF0078FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY AZUSANO, TITAY, ZAMBOANGA SIBUGAY (PHASE 1) | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱95.3M | 100% | High risk87 | Flagged0.029 |
| 23MB0122CONSTRUCTION OF SILWAY RIVER BOULEVARD, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | On-Going | ₱96M | 22% | Medium risk50 | Flagged0.026 |
| 22L00015CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - JCT. DAVAO CITY DIVERSION ROAD - MAGTUOD RD. - NEW CARMEN - BIAO ESCUELA - BIAO JOAQUIN - JCT. DAVAO BUKIDNON RD., DAVAO CITY | Region XI | Region XI | On-Going | ₱218.5M | 26% | High risk66 | Flagged0.026 |
| 18M00041WIDENING OF PERMANENT BRIDGE UPPER MAKAR BR. (B01674MN) ALONG ALBERT MORROW BLVD., ALABEL, SARANGANI PROVINCE | Region XII | Region XII | Completed | ₱192.4M | 100% | Medium risk52 | Flagged0.026 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 23NC0078CONSTRUCTION OF BANK PROTECTION OF ADGAWAN RIVER NEAR ADGAWAN BRIDGE, LA PAZ, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱96.5M | 93% | High risk63 | Flagged0.048 |
| 77 | 18JB0014CONSTRUCTION OF CONCRETE ROAD-NRJ LEADING TO MORIAS FALLS, BRGY. MIATAN, KATIPUNAN, ZAMBOANGA DEL NORTE. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱82.5M | 100% | High risk62 | —-0.058 |
| 78 | 22KK0076CONSTRUCTION OF MULTI-PURPOSE BUILDING (CHILD DEVELOPMENT CENTER), GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱4.9M | 100% | High risk62 | —-0.066 |
| 79 | 24LB0083PREVENTIVE MAINTENANCE - ASPHALT OVERLAY - DAVAO CITY DIV RD - K1508 + 580 - K1508 +760, K1509 + 066 - K1509 + 955 | Region XI | Davao City DEO | On-Going | ₱94.6M | 99% | High risk62 | —-0.046 |
| 80 | 23LB0064PREVENTIVE MAINTENANCE - ASPHALT OVERLAY - DAVAO COTABATO ROAD (DAVAO CITY - JCT. DIGOS SECTION) -K1514+850 - K1516+200, K1518+620 - K1518+771, DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱95.2M | 100% | High risk62 | —-0.035 |
| 81 | 24K00436PREVENTIVE MAINTENANCE-PRIMARY ROADS; OROQUIETA CITY-PLARIDEL-CALAMBA-SAPANG DALAGA RD - K1744 + 574 - K1745 + 000, K1745 + 773 - K1746 + 000, K1750 + 472 - K1753 + 000 | Region X | Region X | On-Going | ₱143M | 100% | High risk62 | —-0.041 |
| 82 | 21L00125PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG BAYABAS - EDEN ROAD, DAVAO CITY | Region XI | Region XI | Completed | ₱106.1M | 100% | High risk62 | —-0.074 |
| 83 | 24J00128PREVENTIVE MAINTENANCE - PRIMARY ROADS - LANAO-PAGADIAN-ZAMBOANGA CITY RD | Region IX | Region IX | On-Going | ₱68.3M | 98% | High risk62 | —-0.041 |
| 84 | 18JB0013CONSTRUCTION OF CONCRETE ROAD-NRJ DIPOLOG-SINDANGAN RD, JOSE DALMAN TO JCT. DINASAN PROVINCIAL RD, 400M FROM JCT. ILIHAN TO LOPERO BRGY. ROAD, IN SUPPORT OF AGRIBUSINESS (RUBBER & COCO) & LOPERO AGRARIAN REFORM COMMUNITY (SIGILO) JOSE DALMAN ASSOT'N.Z.N. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱73.3M | 100% | High risk62 | —-0.062 |
| 85 | 20L00034PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ON SPECIFIC LOCATIONS ALONG J.P. CABAGUIO AVENUE (S00025MN), K1507+(-876) - K1507+549, DAVAO CITY | Region XI | Region XI | Completed | ₱106M | 100% | High risk62 | —-0.075 |
| 86 | 25K00239PREVENTIVE MAINTENANCE-PRIMARY ROADS BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1331 + 410 - K1332 + 233, K1333 + 843 - K1334 + 830, K1335 + 000 - K1336 + 110 | Region X | Region X | On-Going | ₱208.1M | 61% | High risk62 | —-0.019 |
| 87 | 24K00366PREVENTIVE MAINTENANCE- SECONDARY ROADS, GINGOOG-CLAVERIA-VILLANUEVA ROAD-K1330+320-K1330+393,K1330+408-K1332+700 | Region X | Region X | On-Going | ₱190.6M | 100% | High risk62 | —-0.031 |
| 88 | 24K00367PREVENTIVE MAINTENANCE- SECONDARY ROADS, GINGOOG-CLAVERIA-VILLANUEVA ROAD-K1332+700-K1335+000,K1337+189-K1337+509,K1337+524-K1338+528 | Region X | Region X | On-Going | ₱190.6M | 100% | High risk62 | —-0.031 |
| 89 | 24K00368PREVENTIVE MAINTENANCE- SECONDARY ROADS, GINGOOG-CLAVERIA-VILLANUEVA ROAD-K1338+528-K1339+219,K1339+234-K1342+074 | Region X | Region X | On-Going | ₱190.6M | 100% | High risk62 | —-0.031 |
| 90 | 18JB0012CONSTRUCTION OF CONCRETE ROAD-JCT. DIPOLOG-SINDANGAN-LILOY ROAD CONNECTING TO BAGO DALONGDONG (JOAQUIN MACIAS) IN SUPPORT OF RICE, RUBBER, COCONUT & ABACA INDUSTRIES, SINDANGAN, ZAMBOANGA DEL NORTE. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱63.1M | 100% | High risk62 | —-0.068 |
| 91 | 17J00028REPLACEMENT OF BARRA BRIDGE NO.2 PHASE II ALONG BARRA-MINAOG ROAD LEADING TO DIPOLOG CITY AIRPORT, DIPOLOG CITY, ZAMBOANGA DEL NORTE | Region IX | Region IX | Completed | ₱70.7M | 100% | High risk62 | —-0.027 |
| 92 | 25K00335INSTALLATION OF SOLAR STREET LIGHTING ALONG CLAVERIA TO VILLANUEVA, CLAVERIA - VILLANUEVA, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱187.5M | 21% | High risk62 | —-0.012 |
| 93 | 24K00187PREVENTIVE MAINTENANCE- PRIMARY ROADS, BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1281 + (-141) - K1282 + 000, K1329 + (-1119) - K1329 + 000, K1342 + 832 - K1344 + 154, K1345 + 594 - K1346 + 800 | Region X | Region X | On-Going | ₱167.2M | 100% | High risk62 | —-0.032 |
| 94 | 24K00186PREVENTIVE MAINTENANCE-PRIMARY ROADS -BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1352 + 123 - K1352 + 879, K1357 + 000 - K1358 + 000, K1358 + 024 - K1358 + 442, K1358 + 631 - K1359 + 000, K1362 + 000 - K1362 + 566, K1362 + 864 - K1363 + 000, K1364 | Region X | Region X | On-Going | ₱167.2M | 100% | High risk61 | —-0.033 |
| 95 | 24K00188PREVENTIVE MAINTENANCE- PRIMARY ROADS BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1367 + 619 - K1368 + 178, K1368 + 215 - K1369 + 148, K1369 + 175 - K1370 + 000, K1372 + 000 - K1373 + 000, K1379 + 000 - K1379 + 302, K1381 + 000 - K1381 + 350, K1382 | Region X | Region X | On-Going | ₱167.2M | 100% | High risk61 | —-0.034 |
| 96 | 24LB0098CONSTRUCTION OF SITIO PAMANTAWAN ROAD, BRGY. MALABOG DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱97M | 93% | High risk61 | —-0.042 |
| 97 | 22KB0138CONSTRUCTION OF BRIDGE ALONG JCT. DCK - MARAYMARAY ROAD, DON CARLOS, BUKIDNON, CALAOCALAO, DON CARLOS, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱95.1M | 100% | High risk61 | —-0.042 |
| 98 | 21LB0290CONSTRUCTION OF DRAINAGE SYSTEM AT NHA BANGKAL, MATUTUM ST. TO OUTFALL, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.049 |
| 99 | 22LB0405REHABILITATION OF ROAD, CIRCUMFERENTIAL ROAD (JCT. F.S. DIZON ST. - JCT. E. QUIRINO ST.), DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱96.5M | 57% | High risk61 | —-0.013 |
| 100 | 22LB0276CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURES - DAVAO CITY DIV RD - K1510+328 - K1510+411 | Region XI | Davao City DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.076 |