Contractor dossier
383 projects on file, including joint ventures this contractor is part of.
Total projects
383
Total budget
₱32.7B
Average progress
94.6%
Completion rate
70.5%
Average risk score
52.6
Medium risk on average, out of 100
Flagged as unusual
49
12.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 113 | ₱9.9B | 44.9 | 18 | 96.3% |
| Region XI | 103 | ₱8.5B | 54.0 | 8 | 95.0% |
| Region X | 88 | ₱7B | 54.0 | 10 | 94.3% |
| Region IX | 24 | ₱2.3B | 66.5 | 6 | 95.7% |
| Negros Island Region | 18 | ₱1.2B | 57.6 | 2 | 98.9% |
| Region XIII | 15 | ₱1.1B | 51.2 | 3 | 85.7% |
| Region VII | 9 | ₱799.1M | 60.4 | 0 | 100.0% |
| Region VIII | 8 | ₱1.2B | 66.5 | 2 | 78.4% |
| Central Office | 3 | ₱532.9M | 56.2 | 0 | 64.5% |
| Region V | 1 | ₱95.2M | 69.7 | 0 | 99.4% |
| Region IV-A | 1 | ₱14.4M | 46.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 270 | ₱22.4B | 50.4 | 16 | 97.4% |
| Flood Control and Drainage | 56 | ₱4.3B | 48.8 | 5 | 92.4% |
| Bridges | 17 | ₱1.5B | 52.4 | 5 | 94.0% |
| GAA 2025 OO-1 | 12 | ₱1.9B | 94.4 | 12 | 58.3% |
| OTHER | 11 | ₱1.1B | 75.8 | 8 | 82.2% |
| Buildings and Facilities | 10 | ₱785.6M | 44.8 | 1 | 96.5% |
| Bridges, Roads | 4 | ₱473M | 57.8 | 0 | 100.0% |
| GAA 2025 OO-2 | 2 | ₱150.8M | 90.6 | 1 | 82.7% |
| GAA 2025 SSP | 1 | ₱95.3M | 94.1 | 1 | 52.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00048ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - PALO - CARIGARA - ORMOC RD - K0919+205 - K0923+000, K0926+000 - K0929+980 | Region VIII | Region VIII | On-Going | ₱385.6M | 26% | High risk95 | Flagged0.046 |
| 25I00010ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LT) (S00024LT) - K0921+553 - K0922+950, K0923+500 - K0929+000, K0933+500 - K0934+358, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱385.5M | 35% | High risk95 | Flagged0.042 |
| 25M00239PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1735 + 813 - K1738 + 574, GLAN, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱95.3M | 99% | High risk95 | Flagged0.016 |
| 25M00238PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1703 +824 - K1706 +581 (WITH-IN STATION LIMITS), GLAN, SARANGANI | Region XII | Region XII | On-Going | ₱85.6M | 34% | High risk95 | Flagged0.034 |
| 25M00237PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1691 + 570 - K1693 + 137 (WITH-IN STATION LIMITS), GLAN, SARANGANI PROVINCE | Region XII | Region XII | On-Going | ₱85.5M | 86% | High risk95 | Flagged0.019 |
| 25M00240PREVENTIVE MAINTENANCE - SARANGGANI - DAVAO DEL SUR COASTAL RD - K1706 + 581 - K1709 + 330 (WITH-IN STATION LIMITS), GLAN, SARANGANI | Region XII | Region XII | On-Going | ₱90.4M | 92% | High risk95 | Flagged0.019 |
| 25M00176PREVENTIVE MAINTENANCE - DEMOLOC-LITTLE BAGUIO-ALABEL RD - K1660+000 - K1661+073 (P00910283MN), ALABEL, SARANGANI | Region XII | Region XII | On-Going | ₱94.3M | 94% | High risk95 | Flagged0.017 |
| 25M00252PREVENTIVE MAINTENANCE - JCT DIGOS-BUAYAN AIRPORT RD (S00247MN) - K1652 + 473 - K1653 + 239, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱94.7M | 82% | High risk95 | Flagged0.021 |
| 25M00027REHABILITATION/RECONSTRUCTION OF ROADS SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-GENERAL SANTOS CITY-T'BOLI-SURALLAH RD - (S01483MN)K1682+674-K1682+748.98, K1683+915-K1684+012, K1685+106-K1685+204, K1686+113-K1686+136, K1686+184-K1686+232, GENERAL SANTOS CITY, | Region XII | Region XII | On-Going | ₱180.5M | 20% | High risk95 | Flagged0.051 |
| 25M00030CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - MAHARLIKA HIGHWAY (MAKAR-MARBEL RD) - K1659 + 358 - K1660 + 453, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱132.1M | 64% | High risk94 | Flagged0.032 |
| 25NG0096REHABILITATION OF SEAWALL, BARANGAY PUNTA BILAR, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | On-Going | ₱95.3M | 53% | High risk94 | Flagged0.023 |
| 25K00243PREVENTIVE MAINTENANCE-SECONDARY RODS, BUKIDNON BDRY-NORTH COTABATO RD (S01606MN) - CHAINAGE 0 - CHAINAGE 10000 | Region X | Region X | On-Going | ₱235.4M | 47% | High risk93 | Flagged0.034 |
| 25KB0016CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF MIGPAJO BRIDGE (B01435MN) ALONG MARAMAG-MARADUGAO ROAD, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱57.3M | 88% | High risk91 | —-0.017 |
| 25K00056CONSTRUCTION OF BY-PASS AND DIVERSION ROADS GINGOOG BYPASS ROAD, PHASE XI, MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱42.9M | 22% | High risk91 | Flagged0.008 |
| 25ME0046CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, ALABEL, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱93.5M | 77% | High risk90 | Flagged0.006 |
| 23JF0078FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY AZUSANO, TITAY, ZAMBOANGA SIBUGAY (PHASE 1) | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱95.3M | 100% | High risk87 | Flagged0.029 |
| 23JF0079FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY ACHASOL, TITAY, ZAMBOANGA SIBUGAY (PHASE 1) | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱27.6M | 100% | High risk86 | Flagged0.017 |
| 24L00340CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PADADA-MAINIT RIVER (TANWALANG SECTION), PACKAGE E, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱190.9M | 82% | High risk80 | Flagged0.031 |
| 24L00204CONSTRUCTION OF EARTH DIKE ALONG LOCUTAN RIVER (GOING TO TUGANAY RIVER) PHASE 1, CARMEN, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱185.9M | 37% | High risk79 | Flagged0.052 |
| 24K00433CONST./IMPRVT. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM TRIP) ACCESS ROAD LEADING TO KIPILAS FALLS WITH BRIDGE, KITAOTAO, BUKIDNON (PACKAGE 2) | Region X | Region X | On-Going | ₱95.3M | 96% | High risk79 | Flagged0.002 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18J00148SANGA-SANGA AIRPORT DEVELOPMENT PROJECT, SANGA SANGA, BONGAO, TAWI-TAWI | Region IX | Region IX | On-Going | ₱320.9M | 65% | High risk63 | Flagged0.071 |
| 24L00204CONSTRUCTION OF EARTH DIKE ALONG LOCUTAN RIVER (GOING TO TUGANAY RIVER) PHASE 1, CARMEN, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱185.9M | 37% | High risk79 | Flagged0.052 |
| 25M00027REHABILITATION/RECONSTRUCTION OF ROADS SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-GENERAL SANTOS CITY-T'BOLI-SURALLAH RD - (S01483MN)K1682+674-K1682+748.98, K1683+915-K1684+012, K1685+106-K1685+204, K1686+113-K1686+136, K1686+184-K1686+232, GENERAL SANTOS CITY, | Region XII | Region XII | On-Going | ₱180.5M | 20% | High risk95 | Flagged0.051 |
| 23NC0078CONSTRUCTION OF BANK PROTECTION OF ADGAWAN RIVER NEAR ADGAWAN BRIDGE, LA PAZ, AGUSAN DEL SUR | Region XIII | Agusan del Sur 2nd DEO | On-Going | ₱96.5M | 93% | High risk63 | Flagged0.048 |
| 17J00034CONSTRUCTION OF CONCRETE STRUCTURES AT ZAMBOANGA CITY BY-PASS ROAD (CULIANAN-PATALON SECTION), PACKAGE 2, ZAMBOANGA CITY 1ST LD | Region IX | Region IX | On-Going | ₱181.4M | 100% | High risk72 | Flagged0.047 |
| 25I00048ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS - PALO - CARIGARA - ORMOC RD - K0919+205 - K0923+000, K0926+000 - K0929+980 | Region VIII | Region VIII | On-Going | ₱385.6M | 26% | High risk95 | Flagged0.046 |
| 25I00010ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (LT) (S00024LT) - K0921+553 - K0922+950, K0923+500 - K0929+000, K0933+500 - K0934+358, LEYTE 1ST LD | Region VIII | Region VIII | On-Going | ₱385.5M | 35% | High risk95 | Flagged0.042 |
| 23M00256CONSTRUCTION OF RIVER BANK PROTECTION ALONG ALA RIVER, PACKAGE 1, STA 0+027-STA 0+750, SURALLAH, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱144.4M | 99% | High risk67 | Flagged0.041 |
| 24M00308PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) (S00231MN) - K1640+000 - K1641+500, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱173.7M | 83% | High risk69 | Flagged0.035 |
| 25M00238PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1703 +824 - K1706 +581 (WITH-IN STATION LIMITS), GLAN, SARANGANI | Region XII | Region XII | On-Going | ₱85.6M | 34% | High risk95 | Flagged0.034 |
| 25K00243PREVENTIVE MAINTENANCE-SECONDARY RODS, BUKIDNON BDRY-NORTH COTABATO RD (S01606MN) - CHAINAGE 0 - CHAINAGE 10000 | Region X | Region X | On-Going | ₱235.4M | 47% | High risk93 | Flagged0.034 |
| 23GN0130ROAD INFRASTRUCTURE PROJECTS ALONG BACOLOD SOUTH ROAD, (S00127NR), PULUPANDAN, VALLADOLID & SAN ENRIQUE, NEGROS OCCIDENTAL, K0024+(-881) - K0034+000 | Negros Island Region | Negros Occidental 4th DEO | On-Going | ₱95.4M | 100% | High risk74 | Flagged0.034 |
| 24M00309PREVENTIVE MAINTENANCE -MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) (S00231MN) - K1641+500 - K1643+000, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱173.4M | 100% | High risk68 | Flagged0.032 |
| 24M00310PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) (S00231MN) - K1643+000 - K1644+500, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱173.4M | 100% | High risk68 | Flagged0.032 |
| 25M00030CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - MAHARLIKA HIGHWAY (MAKAR-MARBEL RD) - K1659 + 358 - K1660 + 453, GENERAL SANTOS CITY | Region XII | Region XII | On-Going | ₱132.1M | 64% | High risk94 | Flagged0.032 |
| 24L00340CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PADADA-MAINIT RIVER (TANWALANG SECTION), PACKAGE E, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱190.9M | 82% | High risk80 | Flagged0.031 |
| 23JF0078FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY AZUSANO, TITAY, ZAMBOANGA SIBUGAY (PHASE 1) | Region IX | Zamboanga Sibugay 2nd DEO | Completed | ₱95.3M | 100% | High risk87 | Flagged0.029 |
| 23MB0122CONSTRUCTION OF SILWAY RIVER BOULEVARD, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | On-Going | ₱96M | 22% | Medium risk50 | Flagged0.026 |
| 22L00015CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - JCT. DAVAO CITY DIVERSION ROAD - MAGTUOD RD. - NEW CARMEN - BIAO ESCUELA - BIAO JOAQUIN - JCT. DAVAO BUKIDNON RD., DAVAO CITY | Region XI | Region XI | On-Going | ₱218.5M | 26% | High risk66 | Flagged0.026 |
| 18M00041WIDENING OF PERMANENT BRIDGE UPPER MAKAR BR. (B01674MN) ALONG ALBERT MORROW BLVD., ALABEL, SARANGANI PROVINCE | Region XII | Region XII | Completed | ₱192.4M | 100% | Medium risk52 | Flagged0.026 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 24IL0074FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE - BDRY. SO. LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA RD. - ALONG BDRY.TUNGA-TUNGA SE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱96.4M | 96% | High risk61 | —-0.026 |
| 102 | 24IL0071FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE - BDRY. SO. LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA RD. - ALONG BDRY. TAGNIPA SECTI | Region VIII | Southern Leyte 1st DEO | On-Going | ₱96.4M | 98% | High risk61 | —-0.026 |
| 103 | 22Z00026GENERAL SANTOS CITY UNDERPASS/INTERCHANGES (MABUHAY-BULAONG ROAD AND DIGOS-MAKAR ROAD INTERSECTION), PACKAGES 2 & 3 | Central Office | Bureau of Construction | On-Going | ₱211.8M | 88% | High risk61 | —-0.036 |
| 104 | 24IL0078FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE - BDRY. SO. LEYTE - MAASIN - MACROHON - SOGOD - JCT. DAANG MAHARLIKA RD. - ALONG BDRY. ISAGANI SECTI | Region VIII | Southern Leyte 1st DEO | On-Going | ₱96.5M | 72% | High risk61 | —-0.015 |
| 105 | 25K00245PREVENTIVE MAINTENANCE-PRIMARY RODS MARAWI-MARANTAO RD (S01602MN) - CHAINAGE 0 - CHAINAGE 4579, CHAINAGE 5588 - CHAINAGE 5789, CHAINAGE 7000 - CHAINAGE 8000 | Region X | Region X | On-Going | ₱141.1M | 54% | High risk61 | —-0.028 |
| 106 | 18H00024ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSES AND LANDSLIDE, TERTIARY ROADS, LUYANG-POO-LAZI ROAD | Region VII | Region VII | Completed | ₱113M | 100% | High risk60 | —-0.078 |
| 107 | 17JB0032ASPHALT OVERLAY AT PUNTA - DANSULLAN - SR. OSMEÑA ROAD KM.1852 + 392 - KM. 1855 + 846 (PREVENTIVE MAINTENANCE/ASPHALT OVERLAY 50MM) | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱35M | 100% | Medium risk59 | —-0.002 |
| 108 | 20KJ0192CONCRETING OF ROAD, VARIOUS BARANGAYS IN OZAMIZ CITY, STA. 0+000-STA. 5+000, OZAMIZ CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱93.6M | 100% | Medium risk59 | —-0.019 |
| 109 | 23KH0084INSTALLATION OF ROAD SAFETY DEVICES ALONG BUTUAN CITY CAGAYAN DE ORO CITY ILIGAN CITY RD (S01246MN) K1439+(-220)-K1444+730, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱96.5M | 100% | Medium risk59 | —-0.020 |
| 110 | 20KJ0173CONSTRUCTION OF CONVENTION CENTER, OZAMIZ CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱187.2M | 100% | Medium risk59 | —-0.056 |
| 111 | 24K00421CONSTRUCTION OF ROAD AND BRIDGE AND APPROACHES (JCT. BUKIDNON-DAVAO CITY ROAD, BRGY. TAWAS- SITIO BALAKBAKAN-SITIO UPPER NARULASAN-SITIO LOWER NARULASAN- JCT. (SINUDA - OMONAY) BYPASS ROAD, KITAOTAO, BUKIDNON (PACKAGE 1) | Region X | Region X | On-Going | ₱123.9M | 81% | Medium risk58 | —-0.033 |
| 112 | 22LB0402INSTALLATION OF ROAD SAFETY FACILITIES ALONG BYPASS ROADS (CROSSING ELIONG, MUDIANG, MALAGAMOT, LA VERNA), DAVAO CITY | Region XI | Davao City DEO | On-Going | ₱89.6M | 100% | Medium risk58 | —-0.024 |
| 113 | 23GN0054INSTALLATION OF ROAD INFRASTRUCTURE SAFETY ALONG BACOLOD SOUTH ROAD (S00123NR) - K0011+(-469) - K0018+819, BAGO CITY, NEGROS OCCIDENTAL | Negros Island Region | Negros Occidental 4th DEO | Completed | ₱96.4M | 100% | Medium risk58 | —-0.079 |
| 114 | 23KB0101ACCESS ROAD LEADING TO KIPILAS FALLS, KITAOTAO, BUKIDNON (PACKAGE I), KITAOTAO, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.077 |
| 115 | 25K00213PREVENTIVE MAINTENANCE-PRIMARY ROADS BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD (S01246MN) - K1439 + (-220) - K1441 + 291 | Region X | Region X | On-Going | ₱120.5M | 86% | Medium risk57 | —-0.044 |
| 116 | 21KJ0123CONSTRUCTION OF CONVENTION CENTER, OZAMIZ CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱105.2M | 100% | Medium risk57 | —-0.059 |
| 117 | 18K00093REHAB./RECONST. OF NAT'L. ROADS W/ SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, KAPALONG-TALAINGOD-VALENCIA | Region X | Region X | Completed | ₱106.9M | 100% | Medium risk57 | —-0.061 |
| 118 | 20HM0001001:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION-PREVENTIVE MAINTENANCE-SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD-K0008+437-K0009+438, K0009+720-K0013+095, K0036+433-K0039+362, SIQUIJOR, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱89.9M | 100% | Medium risk57 | —-0.079 |
| 119 | 18L00049CONC./WIDENING OF JCT. MATTI (ALONG DAVAO-COT. RD)-JCT. AURORA (ALONG DIGOS MAKAR RD) BYPASS RD INCL | Region XI | Region XI | Completed | ₱83.5M | 100% | Medium risk56 | —-0.059 |
| 120 | 25K00386PREVENTIVE MAINTENANCE-PRIMARY ROADS ILIGAN CITY-MARAWI CITY RD-(S01709MN) CHAINAGE 268-CHAINAGE 4200 | Region X | Region X | On-Going | ₱93.9M | 57% | Medium risk56 | —-0.039 |
| 121 | 20LD0109CONCRETING OF ROAD FROM BRGY. NEW MURCIA TO SAN MIGUEL TO NEW KATIPUNAN, MATANAO TO DALUMAY, MAGSAYSAY, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱72.4M | 100% | Medium risk56 | —-0.080 |
| 122 | 23KH0027INSTALLATION OF ROAD SAFETY DEVICES (SOLAR STUDS) FOR CARRIAGEWAY SEPARATOR AND EDGES) ALONG CDO-AIRPORT-BUKIDNON RD. K1440+(-140)-1453+033, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.083 |
| 123 | 23KH0028INSTALLATION OF ROAD SAFETY DEVICES (SOLAR STUDS FOR CARRIAGEWAY SEPARATOR AND EDGES) ALONG CDO-AIRPORT-BUKIDNON RD K1453+033-K1466+262, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.082 |
| 124 | 24KK0053PREVENTIVE MAINTENANCE - SECONDARY ROADS-GINGOOG-CLAVERIA-VILLANUEVA ROAD- K1316 + (-320) -K1317+886 | Region X | Misamis Oriental 1st DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.083 |
| 125 | 25K00327PREVENTIVE MAINTENANCE-PRIMARY ROADS BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1389 + 000 - K1391 + 383 | Region X | Region X | On-Going | ₱99.2M | 98% | Medium risk56 | —-0.052 |