Contractor dossier
347 projects on file, including joint ventures this contractor is part of.
Total projects
347
Total budget
₱10.4B
Average progress
91.9%
Completion rate
85.6%
Average risk score
46.3
Medium risk on average, out of 100
Flagged as unusual
6
1.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 343 | ₱10.1B | 46.2 | 6 | 91.9% |
| Region VIII | 2 | ₱162.2M | 62.5 | 0 | 100.0% |
| Region XIII | 1 | ₱149.6M | 53.2 | 0 | 100.0% |
| Region III | 1 | ₱9.6M | 31.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 186 | ₱6.6B | 46.0 | 4 | 91.8% |
| Buildings and Facilities | 58 | ₱665.7M | 43.3 | 0 | 93.2% |
| Flood Control and Drainage | 51 | ₱2.3B | 49.5 | 0 | 91.4% |
| Bridges | 32 | ₱492.3M | 42.1 | 0 | 100.0% |
| Water Provision and Storage | 14 | ₱103.2M | 48.1 | 0 | 75.7% |
| OTHER | 6 | ₱229.5M | 75.3 | 2 | 83.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DE0247CLUSTER - CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: 1. CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BAGONG TUBIG, SAN LUIS, BATANGAS (PHA | Region IV-A | Batangas 2nd DEO | On-Going | ₱5.8M | 0% | High risk85 | Flagged0.059 |
| 23DE0179CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY MUZON, SAN L | Region IV-A | Batangas 2nd DEO | On-Going | ₱7.1M | 100% | High risk85 | Flagged0.041 |
| 17I00001IMPRVT./WIDENING OF NAT'L. ROADS, ALLEN-CATARMAN ROAD (S00005SM), KO729+000-KO731+300; KO731+350-KO732+949; KO722+751-KO723+480, NORTHERN SAMAR, 1ST LD | Region VIII | Region VIII | Completed | ₱141.7M | 100% | High risk80 | —-0.015 |
| 20DB0007ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - TERNATE-NASUGBU RD - K0085+288 - K0085+433 | Region IV-A | Batangas 1st DEO | Completed | ₱96.5M | 100% | High risk72 | —-0.062 |
| 20DB0027FLOOD MANAGEMENT PROGRAM-CONSTRUCTION /MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG SINISIAN RIVER AT BRGY. SINISIAN WEST, LEMERY, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱19.6M | 100% | High risk68 | —-0.055 |
| 25DE0183CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (HEALTH CENTER), BRGY. GASANG, MABINI, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱19.2M | 14% | High risk68 | —-0.010 |
| 16DE0184MFO-1 NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT IMPROVEMENT/WIDENING OF NATIONAL ROADS, SECONDARY ROAD AT PALICO - BALAYAN- BATANGAS ROAD, K0148+709 - K0149+813, K0149+855 - K0149+1147 | Region IV-A | Batangas 2nd DEO | Completed | ₱48M | 100% | High risk67 | —-0.067 |
| 16DE0181MFO-1 NATIONAL ROAD NETWORK SERVICES, CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, WIDENING OF PERMANENT BRIDGE 1 TO MORE THAN 2 LANES BALAGTAS BR. (B02918LZ) ALONG MANILA-BATANGAS ROAD. | Region IV-A | Batangas 2nd DEO | Completed | ₱10.8M | 100% | High risk67 | —-0.041 |
| 24DE0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF TESDA REGIONAL TRAINING CENTER (CALABARZON) BUILDING, P. HERRERA ST., BARANGAY 6, BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱59.4M | 100% | High risk67 | —-0.039 |
| 20DB0123CONCRETING & RIPRAPPING OF LOCAL ROAD OF BRGY. TUBUAN, LEMERY, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱4.8M | 100% | High risk67 | —-0.042 |
| 17DB0050ASSET PRESERVATION OF NATIONAL ROADS - REHAB./RECONST. OF NATIONAL ROADS WITH SLIPS, COLLAPSE, AND LANDSLIDE - SECONDARY, P00103564LZ, TERNATE-NASUGBU RD, S01859LZ, K0075+(-176)-K0075+(-076) NASUGBU, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱12.3M | 100% | High risk66 | —-0.071 |
| 17DB0004ASSET PRESERVATION OF NATIONAL ROADS - PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) - SECONDARY, P00100529LZ, TAGAYTAY-NASUGBU RD., S05790LZ, K0102+224-K0102+499 | Region IV-A | Batangas 1st DEO | Completed | ₱5.1M | 100% | High risk66 | —-0.064 |
| 17DB0023NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-TERTIARY, P00109152LZ, TALISAY-LAUREL-AGONCILLO RD., S00515LZ, K0122+(-974)-K0122+(-334), LEMERY, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱22M | 100% | High risk66 | —-0.075 |
| 24DE0241CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TINGL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.7M | 0% | High risk65 | Flagged0.026 |
| 24DE0242CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TINGL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.7M | 0% | High risk65 | Flagged0.026 |
| 24DE0228ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, BAUAN-MABINI RD - K0166+412 - K0166+474, K0167+272 - K0 | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 8% | High risk65 | Flagged0.026 |
| 25DE0068ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL STRUCTURE ALONG MABINI-BAUAN-SAN LUIS-TAAL-LEMERY | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 31% | High risk65 | —-0.025 |
| 25DE0031ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES AL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 20% | High risk65 | —-0.021 |
| 25DE0030ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRU | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 21% | High risk65 | —-0.021 |
| 24DE0227ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/NEW ROADS, TINGLOY CIRCUMFERENTIAL ROAD, PACKAGE O, SECTION 1-A, TINGLOY, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱98.3M | 0% | High risk65 | Flagged0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DE0247CLUSTER - CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: 1. CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BAGONG TUBIG, SAN LUIS, BATANGAS (PHA | Region IV-A | Batangas 2nd DEO | On-Going | ₱5.8M | 0% | High risk85 | Flagged0.059 |
| 23DE0179CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY MUZON, SAN L | Region IV-A | Batangas 2nd DEO | On-Going | ₱7.1M | 100% | High risk85 | Flagged0.041 |
| 24DE0227ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/NEW ROADS, TINGLOY CIRCUMFERENTIAL ROAD, PACKAGE O, SECTION 1-A, TINGLOY, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱98.3M | 0% | High risk65 | Flagged0.028 |
| 24DE0228ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, BAUAN-MABINI RD - K0166+412 - K0166+474, K0167+272 - K0 | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 8% | High risk65 | Flagged0.026 |
| 24DE0241CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TINGL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.7M | 0% | High risk65 | Flagged0.026 |
| 24DE0242CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TINGL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.7M | 0% | High risk65 | Flagged0.026 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 22DE0045ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALUMPANG RIVER (SECTION 4) | Region IV-A | Batangas 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 27 | 22DE0044ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALUMPANG RIVER (SECTION 3) | Region IV-A | Batangas 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 28 | 20DE0044ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALON | Region IV-A | Batangas 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.078 |
| 29 | 19DE0091ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CALUMPANG RIVER, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.078 |
| 30 | 19D00018ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALAMINOS - SAN PABLO CITY BY-PASS ROAD, PACKAGE A, LAGUNA | Region IV-A | Region IV-A | Completed | ₱130M | 100% | High risk61 | —-0.066 |
| 31 | 25DE0094CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF SAN PEDRO - MAHACOT ROAD, BRGYS. SAN PEDRO AND MAHACO | Region IV-A | Batangas 2nd DEO | On-Going | ₱96M | 2% | High risk61 | —-0.037 |
| 32 | 23DE0093CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, SAN PASCUAL-SAN JOSE R | Region IV-A | Batangas 2nd DEO | Completed | ₱120.6M | 100% | High risk61 | —-0.091 |
| 33 | 25DE0014ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, BATANGAS-TABANGAO-LOBO RD - K0138+225 - K0138+302, K0 | Region IV-A | Batangas 2nd DEO | On-Going | ₱110.4M | 36% | High risk60 | —-0.048 |
| 34 | 25DE0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF ROAD, BARANGAY TALIBA-CAL | Region IV-A | Batangas 2nd DEO | On-Going | ₱96.5M | 97% | High risk60 | —-0.068 |
| 35 | 23DE0072OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/NEW ROADS, TINGLOY CIRCUMFERENTIAL ROAD, BATANGAS, TINGLOY, BATANGAS, PACKAGE A | Region IV-A | Batangas 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.095 |
| 36 | 24DE0065CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, TINGLOY CIRCUMFERENTIAL ROAD, BATANGAS PACK | Region IV-A | Batangas 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.096 |
| 37 | 25DE0015ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE, PRIMARY ROADS, MANILA-BATANGAS RD - K0103+000 - K0104+166 | Region IV-A | Batangas 2nd DEO | On-Going | ₱96.5M | 49% | High risk60 | —-0.053 |
| 38 | 22DE0010ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, BATANGAS-TABANGAO-LOBO RD - K0123+600 - K0123+733 | Region IV-A | Batangas 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.095 |
| 39 | 20DE0004ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, BATANGAS-TABANGAO-LOBO RD - K0121+130 - K0121+230, | Region IV-A | Batangas 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.096 |
| 40 | 23DE0080CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY SAN PEDRO, B | Region IV-A | Batangas 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.096 |
| 41 | 19DE0066ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, SECONDARY ROADS, PALICO-BALAYAN-BATANGAS RD, K0142+142 - K0144+415 | Region IV-A | Batangas 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.096 |
| 42 | 23DE0122OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/NEW ROADS, MABINI-BAUAN-SAN LUIS-LEMERY ROAD, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱101.3M | 100% | Medium risk60 | —-0.091 |
| 43 | 24DE0141CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONSTRUCTION OF MABINI-BAUAN-SAN LUIS-TAAL-LEMERY ROAD (S | Region IV-A | Batangas 2nd DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.096 |
| 44 | 24DE0059ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, BATANGAS-TABANGAO-LOBO RD - K0134+958 - K0135+217 | Region IV-A | Batangas 2nd DEO | Completed | ₱92.6M | 100% | Medium risk60 | —-0.097 |
| 45 | 18DB0013NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROADS ALONG BALAYAN-BALIBAGO RD-K0106+-166-K0107+008.40,K0107+081-K0107+653,+0107+683-K0108+740,K0109+000-K0110+000,K0111+037-K0111+401.3 | Region IV-A | Batangas 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.094 |
| 46 | 18DB0087NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROADS ALONG NASUGBU-LIAN-CALATAGAN RD - K0109+018-K0111+000 | Region IV-A | Batangas 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.093 |
| 47 | 21D00095REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES - RECONSTRUCTION OF COLLAPSED PAVEMENT AND ROADSIDE STRUCTURES AT BATANGAS-TABANGAO-LOBO ROAD, K0135 + 500 - K0135 + 900, BATANGAS CITY | Region IV-A | Region IV-A | Completed | ₱76.7M | 100% | Medium risk58 | —-0.040 |
| 48 | 21D00096BATANGAS - TABANGAO - LOBO ROAD, SECTION I : K0137 + 000 - K0137 + 200, SECTION II : K0137 + 720 - K0137 + 820, BATANGAS CITY | Region IV-A | Region IV-A | Completed | ₱76.7M | 100% | Medium risk58 | —-0.041 |
| 49 | 21D00097REHABILITATION OF DISASTER - RELATED INFRASTRUCTURE AND OTHER FACILITIES - RECONSTRUCTION OF COLLAPSED PAVEMENT AND ROADSIDE STRUCTURES AT BATANGAS - TABANGAO - LOBO ROAD, K0137 + 920 - K0138 + 300, BATANGAS CITY | Region IV-A | Region IV-A | Completed | ₱76.7M | 100% | Medium risk58 | —-0.041 |
| 50 | 20DE0136CONSTRUCTION/REPAIR/REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF MULTI-PURPOSE BUILDING (BAUAN COLISEUM), PHASE V, BAUAN, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱77.2M | 100% | Medium risk57 | —-0.081 |