Contractor dossier
347 projects on file, including joint ventures this contractor is part of.
Total projects
347
Total budget
₱10.4B
Average progress
91.9%
Completion rate
85.6%
Average risk score
46.3
Medium risk on average, out of 100
Flagged as unusual
6
1.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 343 | ₱10.1B | 46.2 | 6 | 91.9% |
| Region VIII | 2 | ₱162.2M | 62.5 | 0 | 100.0% |
| Region XIII | 1 | ₱149.6M | 53.2 | 0 | 100.0% |
| Region III | 1 | ₱9.6M | 31.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 186 | ₱6.6B | 46.0 | 4 | 91.8% |
| Buildings and Facilities | 58 | ₱665.7M | 43.3 | 0 | 93.2% |
| Flood Control and Drainage | 51 | ₱2.3B | 49.5 | 0 | 91.4% |
| Bridges | 32 | ₱492.3M | 42.1 | 0 | 100.0% |
| Water Provision and Storage | 14 | ₱103.2M | 48.1 | 0 | 75.7% |
| OTHER | 6 | ₱229.5M | 75.3 | 2 | 83.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DE0247CLUSTER - CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: 1. CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BAGONG TUBIG, SAN LUIS, BATANGAS (PHA | Region IV-A | Batangas 2nd DEO | On-Going | ₱5.8M | 0% | High risk85 | Flagged0.059 |
| 23DE0179CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY MUZON, SAN L | Region IV-A | Batangas 2nd DEO | On-Going | ₱7.1M | 100% | High risk85 | Flagged0.041 |
| 17I00001IMPRVT./WIDENING OF NAT'L. ROADS, ALLEN-CATARMAN ROAD (S00005SM), KO729+000-KO731+300; KO731+350-KO732+949; KO722+751-KO723+480, NORTHERN SAMAR, 1ST LD | Region VIII | Region VIII | Completed | ₱141.7M | 100% | High risk80 | —-0.015 |
| 20DB0007ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - TERNATE-NASUGBU RD - K0085+288 - K0085+433 | Region IV-A | Batangas 1st DEO | Completed | ₱96.5M | 100% | High risk72 | —-0.062 |
| 20DB0027FLOOD MANAGEMENT PROGRAM-CONSTRUCTION /MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG SINISIAN RIVER AT BRGY. SINISIAN WEST, LEMERY, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱19.6M | 100% | High risk68 | —-0.055 |
| 25DE0183CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (HEALTH CENTER), BRGY. GASANG, MABINI, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱19.2M | 14% | High risk68 | —-0.010 |
| 16DE0184MFO-1 NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT IMPROVEMENT/WIDENING OF NATIONAL ROADS, SECONDARY ROAD AT PALICO - BALAYAN- BATANGAS ROAD, K0148+709 - K0149+813, K0149+855 - K0149+1147 | Region IV-A | Batangas 2nd DEO | Completed | ₱48M | 100% | High risk67 | —-0.067 |
| 16DE0181MFO-1 NATIONAL ROAD NETWORK SERVICES, CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, WIDENING OF PERMANENT BRIDGE 1 TO MORE THAN 2 LANES BALAGTAS BR. (B02918LZ) ALONG MANILA-BATANGAS ROAD. | Region IV-A | Batangas 2nd DEO | Completed | ₱10.8M | 100% | High risk67 | —-0.041 |
| 24DE0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF TESDA REGIONAL TRAINING CENTER (CALABARZON) BUILDING, P. HERRERA ST., BARANGAY 6, BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱59.4M | 100% | High risk67 | —-0.039 |
| 20DB0123CONCRETING & RIPRAPPING OF LOCAL ROAD OF BRGY. TUBUAN, LEMERY, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱4.8M | 100% | High risk67 | —-0.042 |
| 17DB0050ASSET PRESERVATION OF NATIONAL ROADS - REHAB./RECONST. OF NATIONAL ROADS WITH SLIPS, COLLAPSE, AND LANDSLIDE - SECONDARY, P00103564LZ, TERNATE-NASUGBU RD, S01859LZ, K0075+(-176)-K0075+(-076) NASUGBU, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱12.3M | 100% | High risk66 | —-0.071 |
| 17DB0004ASSET PRESERVATION OF NATIONAL ROADS - PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) - SECONDARY, P00100529LZ, TAGAYTAY-NASUGBU RD., S05790LZ, K0102+224-K0102+499 | Region IV-A | Batangas 1st DEO | Completed | ₱5.1M | 100% | High risk66 | —-0.064 |
| 17DB0023NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-TERTIARY, P00109152LZ, TALISAY-LAUREL-AGONCILLO RD., S00515LZ, K0122+(-974)-K0122+(-334), LEMERY, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱22M | 100% | High risk66 | —-0.075 |
| 24DE0241CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TINGL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.7M | 0% | High risk65 | Flagged0.026 |
| 24DE0242CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TINGL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.7M | 0% | High risk65 | Flagged0.026 |
| 24DE0228ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, BAUAN-MABINI RD - K0166+412 - K0166+474, K0167+272 - K0 | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 8% | High risk65 | Flagged0.026 |
| 25DE0068ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL STRUCTURE ALONG MABINI-BAUAN-SAN LUIS-TAAL-LEMERY | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 31% | High risk65 | —-0.025 |
| 25DE0031ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES AL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 20% | High risk65 | —-0.021 |
| 25DE0030ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRU | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 21% | High risk65 | —-0.021 |
| 24DE0227ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/NEW ROADS, TINGLOY CIRCUMFERENTIAL ROAD, PACKAGE O, SECTION 1-A, TINGLOY, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱98.3M | 0% | High risk65 | Flagged0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DE0247CLUSTER - CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: 1. CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BAGONG TUBIG, SAN LUIS, BATANGAS (PHA | Region IV-A | Batangas 2nd DEO | On-Going | ₱5.8M | 0% | High risk85 | Flagged0.059 |
| 23DE0179CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY MUZON, SAN L | Region IV-A | Batangas 2nd DEO | On-Going | ₱7.1M | 100% | High risk85 | Flagged0.041 |
| 24DE0227ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/NEW ROADS, TINGLOY CIRCUMFERENTIAL ROAD, PACKAGE O, SECTION 1-A, TINGLOY, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱98.3M | 0% | High risk65 | Flagged0.028 |
| 24DE0228ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, BAUAN-MABINI RD - K0166+412 - K0166+474, K0167+272 - K0 | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 8% | High risk65 | Flagged0.026 |
| 24DE0241CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TINGL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.7M | 0% | High risk65 | Flagged0.026 |
| 24DE0242CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TINGL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.7M | 0% | High risk65 | Flagged0.026 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 21DB0002ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY ROADS-TERNATE-NASUGBU RD-K0085+700-K0085+758 | Region IV-A | Batangas 1st DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.101 |
| 102 | 21DE0085LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTIONOF NBI BLDG., BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱19.8M | 100% | Medium risk50 | —-0.103 |
| 103 | 24DE0155CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM, CONSTRUCTION OF NBI BLDG. (PHASE II), CAPITOL SITE, KUMINTANG IBABA, BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱19.8M | 100% | Medium risk50 | —-0.103 |
| 104 | 23DE0009CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BUCAL ELEMENTARY SCHOOL, BARANGAY BUCAL, BATANGAS CITY, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱9.9M | 100% | Medium risk49 | —-0.106 |
| 105 | 19DE0230REPAIR OF FLOOD CONTROL PROJECT IN SITIO TAMBUKO, BRGY. SAN NICOLAS, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱16.1M | 100% | Medium risk49 | —-0.039 |
| 106 | 25DB0199CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYM) AT PAYAPA ELEMENTARY SCHOOL, BARANGAY PAYAPA, LEMERY, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱14.4M | 56% | Medium risk49 | —-0.052 |
| 107 | 18DB0114IMPROVEMENT/RENOVATION OF MULTI-PURPOSE BUILDING INCLUDING ROAD REPAIR (BALAYAN BAY WALK) BALAYAN, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱4.8M | 100% | Medium risk49 | —-0.103 |
| 108 | 20DB0095CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL BUILDING/EVACUATION CENTER), BRGY. CALOOCAN, BALAYAN, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱19.3M | 100% | Medium risk49 | —-0.102 |
| 109 | 20DB0029FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF RIVERBANK PROTECTION ALONG PANSIPIT RIVER, LEMERY, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱47.5M | 100% | Medium risk49 | —-0.081 |
| 110 | 22DB0130CONSTRUCTION OF MULTI-PURPOSE BUILDING, CALACA, BATANGAS, CALACA, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱19.8M | 100% | Medium risk49 | —-0.102 |
| 111 | 18DE0136ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITH MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION/ IMPROVEMENT/ REHABILATION OF FLO | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.086 |
| 112 | 23DE0046OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CALUMPANG RIVER (S | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.086 |
| 113 | 23DE0085OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALUMPANG RIVER (SEC | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 114 | 18DE0068ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.087 |
| 115 | 18DB0248CONSTRUCTION OF MUNICIPAL MULTI-PURPOSE BLDG. (EVACUATION) CENTER, BRGY. CALOOCAN, BALAYAN, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱24.1M | 100% | Medium risk49 | —-0.092 |
| 116 | 25DB0012CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) IN BARANGAY CALOOCAN, BALAYAN, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱19.2M | 0% | Medium risk49 | —-0.028 |
| 117 | 22DE0031CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (SENIOR CITIZEN BUILDING), MABINI, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱9.9M | 100% | Medium risk49 | —-0.105 |
| 118 | 23DE0037CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY ALALUM, SAN PASCUAL, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱7.9M | 100% | Medium risk49 | —-0.105 |
| 119 | 21DE0120LOCAL PROGRAM - CONSTRUCTION OF FLOOD CONTROL, MABINI, BATANGAS CIRCUMFERENTIAL ROAD | Region IV-A | Batangas 2nd DEO | Completed | ₱49.5M | 100% | Medium risk49 | —-0.086 |
| 120 | 24DE0106CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDING/FACILITIES TO SUPPORT SOCIAL SERVICES, COMPLETION OF MULTI-PURPOSE BUILDING (COVERED COURT) BRGY. TUNGGAL, SAN LUIS, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱6.9M | 100% | Medium risk49 | —-0.106 |
| 121 | 25DE0079CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF WATER SUPPLY SYSTEM (WATER WORKS), BARANGAY ABIACAO, SAN LUIS, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱4.8M | 2% | Medium risk49 | —-0.009 |
| 122 | 20DE0140LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION OF MULTI-PURPOSE COVERED COURT WITH SLOPE PROTECTION AT BRGY. STA. ANA, MABINI, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱11.9M | 100% | Medium risk49 | —-0.103 |
| 123 | 22DB0113CONSTRUCTION OF PUBLIC WATER SUPPLY SYSTEM IN THE MUNICIPALITY OF LEMERY, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱4.8M | 100% | Medium risk49 | —-0.069 |
| 124 | 25DB0202CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SYSTEM - CONSTRUCTION OF PUBLIC WATER SYSTEM, BRGY. LUMBANG NA BATA, CITY OF CALACA, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱4.8M | 55% | Medium risk49 | —-0.027 |
| 125 | 25DE0092CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF WATER SUPPLY SYSTEM (WATER WORKS), BARANGAY SAN PEDRO, BAUAN, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱4.8M | 68% | Medium risk49 | —-0.028 |