Contractor dossier
347 projects on file, including joint ventures this contractor is part of.
Total projects
347
Total budget
₱10.4B
Average progress
91.9%
Completion rate
85.6%
Average risk score
46.3
Medium risk on average, out of 100
Flagged as unusual
6
1.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 343 | ₱10.1B | 46.2 | 6 | 91.9% |
| Region VIII | 2 | ₱162.2M | 62.5 | 0 | 100.0% |
| Region XIII | 1 | ₱149.6M | 53.2 | 0 | 100.0% |
| Region III | 1 | ₱9.6M | 31.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 186 | ₱6.6B | 46.0 | 4 | 91.8% |
| Buildings and Facilities | 58 | ₱665.7M | 43.3 | 0 | 93.2% |
| Flood Control and Drainage | 51 | ₱2.3B | 49.5 | 0 | 91.4% |
| Bridges | 32 | ₱492.3M | 42.1 | 0 | 100.0% |
| Water Provision and Storage | 14 | ₱103.2M | 48.1 | 0 | 75.7% |
| OTHER | 6 | ₱229.5M | 75.3 | 2 | 83.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DE0247CLUSTER - CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: 1. CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BAGONG TUBIG, SAN LUIS, BATANGAS (PHA | Region IV-A | Batangas 2nd DEO | On-Going | ₱5.8M | 0% | High risk85 | Flagged0.059 |
| 23DE0179CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY MUZON, SAN L | Region IV-A | Batangas 2nd DEO | On-Going | ₱7.1M | 100% | High risk85 | Flagged0.041 |
| 17I00001IMPRVT./WIDENING OF NAT'L. ROADS, ALLEN-CATARMAN ROAD (S00005SM), KO729+000-KO731+300; KO731+350-KO732+949; KO722+751-KO723+480, NORTHERN SAMAR, 1ST LD | Region VIII | Region VIII | Completed | ₱141.7M | 100% | High risk80 | —-0.015 |
| 20DB0007ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - TERNATE-NASUGBU RD - K0085+288 - K0085+433 | Region IV-A | Batangas 1st DEO | Completed | ₱96.5M | 100% | High risk72 | —-0.062 |
| 20DB0027FLOOD MANAGEMENT PROGRAM-CONSTRUCTION /MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG SINISIAN RIVER AT BRGY. SINISIAN WEST, LEMERY, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱19.6M | 100% | High risk68 | —-0.055 |
| 25DE0183CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (HEALTH CENTER), BRGY. GASANG, MABINI, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱19.2M | 14% | High risk68 | —-0.010 |
| 16DE0184MFO-1 NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT IMPROVEMENT/WIDENING OF NATIONAL ROADS, SECONDARY ROAD AT PALICO - BALAYAN- BATANGAS ROAD, K0148+709 - K0149+813, K0149+855 - K0149+1147 | Region IV-A | Batangas 2nd DEO | Completed | ₱48M | 100% | High risk67 | —-0.067 |
| 16DE0181MFO-1 NATIONAL ROAD NETWORK SERVICES, CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, WIDENING OF PERMANENT BRIDGE 1 TO MORE THAN 2 LANES BALAGTAS BR. (B02918LZ) ALONG MANILA-BATANGAS ROAD. | Region IV-A | Batangas 2nd DEO | Completed | ₱10.8M | 100% | High risk67 | —-0.041 |
| 24DE0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF TESDA REGIONAL TRAINING CENTER (CALABARZON) BUILDING, P. HERRERA ST., BARANGAY 6, BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱59.4M | 100% | High risk67 | —-0.039 |
| 20DB0123CONCRETING & RIPRAPPING OF LOCAL ROAD OF BRGY. TUBUAN, LEMERY, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱4.8M | 100% | High risk67 | —-0.042 |
| 17DB0050ASSET PRESERVATION OF NATIONAL ROADS - REHAB./RECONST. OF NATIONAL ROADS WITH SLIPS, COLLAPSE, AND LANDSLIDE - SECONDARY, P00103564LZ, TERNATE-NASUGBU RD, S01859LZ, K0075+(-176)-K0075+(-076) NASUGBU, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱12.3M | 100% | High risk66 | —-0.071 |
| 17DB0004ASSET PRESERVATION OF NATIONAL ROADS - PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) - SECONDARY, P00100529LZ, TAGAYTAY-NASUGBU RD., S05790LZ, K0102+224-K0102+499 | Region IV-A | Batangas 1st DEO | Completed | ₱5.1M | 100% | High risk66 | —-0.064 |
| 17DB0023NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-TERTIARY, P00109152LZ, TALISAY-LAUREL-AGONCILLO RD., S00515LZ, K0122+(-974)-K0122+(-334), LEMERY, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱22M | 100% | High risk66 | —-0.075 |
| 24DE0241CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TINGL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.7M | 0% | High risk65 | Flagged0.026 |
| 24DE0242CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TINGL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.7M | 0% | High risk65 | Flagged0.026 |
| 24DE0228ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, BAUAN-MABINI RD - K0166+412 - K0166+474, K0167+272 - K0 | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 8% | High risk65 | Flagged0.026 |
| 25DE0068ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL STRUCTURE ALONG MABINI-BAUAN-SAN LUIS-TAAL-LEMERY | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 31% | High risk65 | —-0.025 |
| 25DE0031ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES AL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 20% | High risk65 | —-0.021 |
| 25DE0030ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRU | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 21% | High risk65 | —-0.021 |
| 24DE0227ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/NEW ROADS, TINGLOY CIRCUMFERENTIAL ROAD, PACKAGE O, SECTION 1-A, TINGLOY, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱98.3M | 0% | High risk65 | Flagged0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DE0247CLUSTER - CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: 1. CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BAGONG TUBIG, SAN LUIS, BATANGAS (PHA | Region IV-A | Batangas 2nd DEO | On-Going | ₱5.8M | 0% | High risk85 | Flagged0.059 |
| 23DE0179CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY MUZON, SAN L | Region IV-A | Batangas 2nd DEO | On-Going | ₱7.1M | 100% | High risk85 | Flagged0.041 |
| 24DE0227ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/NEW ROADS, TINGLOY CIRCUMFERENTIAL ROAD, PACKAGE O, SECTION 1-A, TINGLOY, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱98.3M | 0% | High risk65 | Flagged0.028 |
| 24DE0228ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, BAUAN-MABINI RD - K0166+412 - K0166+474, K0167+272 - K0 | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 8% | High risk65 | Flagged0.026 |
| 24DE0241CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TINGL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.7M | 0% | High risk65 | Flagged0.026 |
| 24DE0242CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TINGL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.7M | 0% | High risk65 | Flagged0.026 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 20DE0023LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION/IMPROVEMENT OF DRAINAGE SYSTEM, BRGY. CALICANTO, BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.085 |
| 202 | 22DE0147REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES EMERGENCY REPAIR/REHABILITATION OF DAMAGED ROADSIDE STRUCTURE ALONG BATANGAS-LOBO ROAD(LOBO SECTION), LOBO, BATANGAS, K0130+950 - K0131+000 | Region IV-A | Batangas 2nd DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.102 |
| 203 | 25DE0081ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/ UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, BATANGAS-LOBO RD - K0114+680 - K0115+301 | Region IV-A | Batangas 2nd DEO | On-Going | ₱19M | 20% | Medium risk47 | —-0.051 |
| 204 | 25DE0044ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - TERTIARY ROAD, BAUAN-MABINI RD - K0146+726 - K0146+965 | Region IV-A | Batangas 2nd DEO | On-Going | ₱19.6M | 95% | Medium risk47 | —-0.074 |
| 205 | 22DE0012ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, BATANGAS-TABANGAO-LOBO RD - K0128+232 - K0128+252 | Region IV-A | Batangas 2nd DEO | Completed | ₱14.7M | 100% | Medium risk47 | —-0.104 |
| 206 | 18DE0009ORGANIZATIONAL OUTCOME 1 ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION-PREVENTIVE MAINTENANCE SECONDARY ROADS, BATANGAS-LOBO RD. K0108 + 000 K0109 + 000 | Region IV-A | Batangas 2nd DEO | Completed | ₱15.2M | 100% | Medium risk47 | —-0.104 |
| 207 | 20DE0037ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS, BATANGAS-QUEZON RD - K0136+501 - K0136+909 | Region IV-A | Batangas 2nd DEO | Completed | ₱24.9M | 100% | Medium risk47 | —-0.105 |
| 208 | 23DE0084CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BRGY. SAN JOSE SICO, BATANGAS CITY, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱19.8M | 100% | Medium risk47 | —-0.106 |
| 209 | 20DE0001ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION - PREVENTIVE MAINTENANCE - PRIMARY ROADS, MANILA-BATANGAS RD - K0100+965 - K0101+485 | Region IV-A | Batangas 2nd DEO | Completed | ₱15.9M | 100% | Medium risk47 | —-0.106 |
| 210 | 23DE0050OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, MANILA-BATANGAS PIER RD - K0106+1118 - K0107+503 | Region IV-A | Batangas 2nd DEO | Completed | ₱25.9M | 100% | Medium risk47 | —-0.108 |
| 211 | 24DE0046ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, BATANGAS-QUEZON RD - K0134+(-664) - K0134+(-439) | Region IV-A | Batangas 2nd DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.108 |
| 212 | 23DE0011OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS, BATANGAS-QUEZON RD - K0134+275 - K0134+500 | Region IV-A | Batangas 2nd DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.109 |
| 213 | 23DE0124CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY SAN MIGUEL TO BARANGAY STO. DOMINGO, B | Region IV-A | Batangas 2nd DEO | Completed | ₱19.8M | 100% | Medium risk47 | —-0.109 |
| 214 | 21DE0074ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - BATANGAS PORT DIVERSION RD - K0103+756 - K0104+465 | Region IV-A | Batangas 2nd DEO | Completed | ₱17.1M | 100% | Medium risk47 | —-0.109 |
| 215 | 19DB0069CONSTRUCTION OF BRIDGE IN BRGY. PUTAT, NASUGBU, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.066 |
| 216 | 19DB0016BRIDGE-WIDENING OF PERMANENT BRIDGES TANGGOY BR. (B03050LZ) ALONG BALAYAN-BALIBAGO RD - K0111+401.30 | Region IV-A | Batangas 1st DEO | Completed | ₱12.7M | 100% | Medium risk47 | —-0.067 |
| 217 | 22DB0039CONSTRUCTION OF ROAD IN LEMERY, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.105 |
| 218 | 19DE0131LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF MULTI-PURPOSE BUILDING, MALABRIGO, LOBO, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.105 |
| 219 | 25DB0038CONVERGENCE & SPECIAL SUPPORT PROG - SUSTAINABLE INFRAS PROJ ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD IN BARANGAY SUCOL, BALAYAN, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.105 |
| 220 | 25DB0046CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE IN TAAL, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱4.7M | 100% | Medium risk46 | —-0.056 |
| 221 | 25DB0040CONVERGENCE & SPECIAL SUPPORT PROG - SUSTAINABLE INFRAS PROJ ALLEVIATING GAPS (SIPAG) - ACCESS RDS &/OR BR. FROM THE NAT'L RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS/ FAC - CONSTRUCTION OF ROAD IN BARANGAY DALIG TO BARANGAY SAMBAT, BALAYAN, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱4.8M | 98% | Medium risk46 | —-0.073 |
| 222 | 25DE0084CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION/ REHABILITATION OF BRGY. ROAD, SITIO MALVAR, SAN NICOLAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱14.4M | 0% | Medium risk46 | —-0.046 |
| 223 | 24DE0044ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS, BATANGAS-LOBO RD - K0114+414 - K0115+049 | Region IV-A | Batangas 2nd DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.108 |
| 224 | 25DE0072ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DRAINAGE STRUCTURE, BARANGAY SAN FRANCISCO, MABINI, BATA | Region IV-A | Batangas 2nd DEO | On-Going | ₱9.5M | 58% | Medium risk46 | —-0.038 |
| 225 | 25DE0073ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DRAINAGE STRUCTURE (OUTFALL), BARANGAY PULONG BALIBAGUHAN, | Region IV-A | Batangas 2nd DEO | On-Going | ₱9.5M | 85% | Medium risk46 | —-0.049 |