Contractor dossier
217 projects on file, including joint ventures this contractor is part of.
Total projects
217
Total budget
₱9.2B
Average progress
98.3%
Completion rate
92.6%
Average risk score
50.2
Medium risk on average, out of 100
Flagged as unusual
13
6.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 121 | ₱4.3B | 52.2 | 8 | 97.8% |
| National Capital Region | 45 | ₱2.7B | 54.2 | 2 | 100.0% |
| Region VII | 14 | ₱180.7M | 39.3 | 0 | 100.0% |
| Region III | 11 | ₱383.5M | 40.7 | 0 | 100.0% |
| Region XIII | 10 | ₱747.1M | 44.0 | 2 | 100.0% |
| Region XII | 7 | ₱205.4M | 22.9 | 0 | 100.0% |
| Region X | 3 | ₱112.2M | 58.3 | 0 | 93.1% |
| Region II | 2 | ₱265.8M | 56.3 | 0 | 100.0% |
| Region IV-A | 2 | ₱112.7M | 49.2 | 0 | 100.0% |
| Region IV-B | 1 | ₱98.4M | 92.7 | 1 | 20.0% |
| Region IX | 1 | ₱47.3M | 68.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 109 | ₱3.9B | 48.8 | 4 | 99.3% |
| Buildings and Facilities | 37 | ₱1.6B | 45.3 | 0 | 100.0% |
| Flood Control and Drainage | 36 | ₱2B | 50.5 | 0 | 99.5% |
| Bridges | 18 | ₱665.6M | 46.3 | 1 | 100.0% |
| OTHER | 6 | ₱240.1M | 66.6 | 3 | 98.3% |
| GAA 2025 OO-1 | 4 | ₱239.1M | 93.9 | 2 | 51.8% |
| Bridges, Roads | 3 | ₱442.5M | 59.8 | 1 | 100.0% |
| GAA 2025 SSP | 2 | ₱9.9M | 94.7 | 2 | 76.7% |
| GAA 2025 OO-2 | 1 | ₱96.4M | 92.5 | 0 | 79.3% |
| Water Provision and Storage | 1 | ₱979.5K | 20.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IA0015NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD, K1050+900 - K1051+890, K1052+867-K1053+970 | Region VIII | Biliran DEO | On-Going | ₱77.1M | 79% | High risk96 | —-0.000 |
| 25IA0138CONSTRUCTION OF COASTAL SHORE PROTECTION IN BRGY. SANTISSIMO ROSARIO COASTAL AREA, BRGY SANTISSIMO ROSARIO, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱4.9M | 88% | High risk95 | Flagged0.008 |
| 25IA0012NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD, K1104+184 - K1104+496, K1105+180-K1105+913 | Region VIII | Biliran DEO | On-Going | ₱48.9M | 36% | High risk95 | Flagged0.006 |
| 25IC0121CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PILIT, SANTA FE, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱4.9M | 65% | High risk94 | Flagged0.017 |
| 25EG0010WIDENING OF PERMANENT BRIDGES - GEN. LUNA BR. 2 (B00175PW) ALONG PUERTO PRINCESA SOUTH RD, K0017+528, PUERTO PRINCESA CITY | Region IV-B | Palawan 3rd DEO | On-Going | ₱98.4M | 20% | High risk93 | Flagged0.035 |
| 25KB0028CONSTRUCTION OF REVETMENT, DOWNSTREAM OF MUSUAN BRIDGE ALONG TAGANIBONG CREEK, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | On-Going | ₱96.4M | 79% | High risk92 | —-0.009 |
| 25IA0132REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD., K1032+637-K1032+881 | Region VIII | Biliran DEO | On-Going | ₱14.7M | 72% | High risk92 | —-0.001 |
| 25IG0073CONCRETING OF BRGY. MABUNGA TO BRGY. HINAGUIMITAN FMR, BRGY. MABUNGA AND BRGY. HINAGUIMITAN, MAHAPLAG, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱14.9M | 90% | High risk89 | Flagged0.044 |
| 20OF0328REPAIR/ REHABILITATION OF VETERANS MEMORIAL MEDICAL CENTER ROAD NETWORK, QUEZON CITY WITH EXCEPTIONS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱61.8M | 100% | High risk77 | Flagged0.013 |
| 17CC0130ASSET PRESERVATION OF NATIONAL ROADS - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROAD - TERTIARY - OLD CAGAYAN VALLEY ROAD K0050+390 TO K0050+989 BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱9.3M | 100% | High risk69 | —-0.071 |
| 17CD0008CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG OBANDO RIVER, PHASE I, OBANDO, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱46.5M | 100% | High risk68 | —-0.062 |
| 17J00191RESTORATION/IMPROVEMENT OF LUPA PULA - UMUS MATAHA NATIONAL ROAD MAPUN, TAWI-TAWI, K 0+200.00 - K 1+690.00, NET LENGTH: 1,490.00 LN.M. | Region IX | Region IX | Completed | ₱47.3M | 100% | High risk68 | —-0.025 |
| 20OF0329REAPIR/ REHABILITATION OF NINOY AQUINO PARKS AND WILDLIFE CENTER ROAD NETWORK, QUEZON CITY WITH EXCEPTION, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱38M | 100% | High risk68 | Flagged0.009 |
| 23OF0126REHABILITATION OF ROAD ALONG MINDANAO AVE. (S05472LZ) K0017 + 250 - K0016 + 70, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱96.5M | 100% | High risk66 | —-0.029 |
| 18OE0104ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF VALENCIA PUMPING STATION RETARDING BASIN, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱95.8M | 100% | High risk65 | —-0.073 |
| 18OE0106ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF VALENCIA PUMPING STATION RETARDING BASIN, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.1M | 100% | High risk65 | —-0.069 |
| 18OE0105ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF VALENCIA PUMPING STATION RETARDING BASIN, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱96.1M | 100% | High risk65 | —-0.075 |
| 20OF0323CONSTRUCTION OF MULTI-PURPOSE BUILDING AND INTEGRATED LEARNING FACILITIES AT BRGY. SANTA MONICA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱93.6M | 100% | High risk63 | —-0.069 |
| 20OD0214CONSTRUCTION OF PAMANTASAN NG LUNGSOD NG VALENZUELA ANNEX BUILDING (PHASE 2), BRGY. MALINTA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱103.5M | 100% | High risk63 | —-0.078 |
| 19OF0206CONSTRUCTION OF K-12 AND MULTI-PURPOSE BUILDING, BRGY. NOVALICHES PROPER, DISTRICT V, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱96M | 100% | High risk63 | —-0.067 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25IG0073CONCRETING OF BRGY. MABUNGA TO BRGY. HINAGUIMITAN FMR, BRGY. MABUNGA AND BRGY. HINAGUIMITAN, MAHAPLAG, LEYTE | Region VIII | Leyte 5th DEO | On-Going | ₱14.9M | 90% | High risk89 | Flagged0.044 |
| 25EG0010WIDENING OF PERMANENT BRIDGES - GEN. LUNA BR. 2 (B00175PW) ALONG PUERTO PRINCESA SOUTH RD, K0017+528, PUERTO PRINCESA CITY | Region IV-B | Palawan 3rd DEO | On-Going | ₱98.4M | 20% | High risk93 | Flagged0.035 |
| 25IC0121CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PILIT, SANTA FE, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱4.9M | 65% | High risk94 | Flagged0.017 |
| 18N00105CONCRETING OF EXISTING GRAVEL ROAD, SITIO SAN ROQUE ROAD WITH CONSTRUCTION OF 2 BRIDGES, MAHABA, MARIHATAG, SURIGAO DEL SUR | Region XIII | Region XIII | Completed | ₱171.1M | 100% | Medium risk58 | Flagged0.016 |
| 20OF0328REPAIR/ REHABILITATION OF VETERANS MEMORIAL MEDICAL CENTER ROAD NETWORK, QUEZON CITY WITH EXCEPTIONS, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱61.8M | 100% | High risk77 | Flagged0.013 |
| 17IJ0110REPAIR/REHABILITATION/IMPROVEMENT (ASPHALT OVERLAY) ALONG DAANG MAHARLIKA (SM)(SN ISIDRO-SN JUANICO BR.) K0714+000-K0714+900; K0717+400-K0718+350 SAMAR 1ST LD | Region VIII | Samar 1st DEO | Completed | ₱25.4M | 100% | Medium risk55 | Flagged0.011 |
| 20OF0329REAPIR/ REHABILITATION OF NINOY AQUINO PARKS AND WILDLIFE CENTER ROAD NETWORK, QUEZON CITY WITH EXCEPTION, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱38M | 100% | High risk68 | Flagged0.009 |
| 25IA0138CONSTRUCTION OF COASTAL SHORE PROTECTION IN BRGY. SANTISSIMO ROSARIO COASTAL AREA, BRGY SANTISSIMO ROSARIO, NAVAL, BILIRAN | Region VIII | Biliran DEO | On-Going | ₱4.9M | 88% | High risk95 | Flagged0.008 |
| 17IJ0095ASPHALT OVERLAY OF DAANG MAHARLIKA (SM)(SAN ISIDRO - SAN JUANICO BRIDGE), K0772+181 - K0777+385, SAMAR 1ST LD | Region VIII | Samar 1st DEO | Completed | ₱76.2M | 100% | High risk61 | Flagged0.006 |
| 25IA0012NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS - BILIRAN CIRCUMFERENTIAL RD, K1104+184 - K1104+496, K1105+180-K1105+913 | Region VIII | Biliran DEO | On-Going | ₱48.9M | 36% | High risk95 | Flagged0.006 |
| 17IJ0101REPAIR/REHABILITATION/IMPROVEMENT (ASPHALT OVERLAY) ALONG DAANG MAHARLIKA (SM)(SN ISIDRO - SN JUANICO BR.) K0745+000 - K0747+000, SAMAR 1ST LD | Region VIII | Samar 1st DEO | Completed | ₱33.4M | 100% | Medium risk56 | Flagged0.003 |
| 17IJ0098REPAIR/REHABILITATION/IMPROVEMENT (ASPHALT OVERLAY) ALONG DAANG MAHARLIKA (SM)(SN ISIDRO -SN JUANICO BR.) K0779+490 - K0781+000, SAMAR 1ST LD | Region VIII | Samar 1st DEO | Completed | ₱40.9M | 100% | Medium risk56 | Flagged0.001 |
| 18N00090CONSTRUCTION OF NEW PERMANENT BRIDGES, ANDANAN BR. (PARALLEL BR.) ALONG DAANG MAHARLIKA (AGUSAN-DAVAO SECT.) INCLUDING ROW (S00446MN), BAYUGAN, AGUSAN DEL SUR | Region XIII | Region XIII | Completed | ₱183.7M | 100% | Medium risk52 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 18CC0049CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG ANGAT RIVER AT CAMBAOG, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱27.9M | 100% | Low risk29 | —-0.094 |
| 202 | 17IL0157CONSTRUCTION OF 3STY/12CL SCHOOL BUILDING, PINTUYAN NATIONAL VOCATIONAL HIGH SCHOOL-BLDG. 2 (SCH. ID#303477), PINTUYAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱31.5M | 100% | Low risk28 | —-0.020 |
| 203 | 18ME0021CONST./IMPROVEMENT OF NRJ RANCHO CENTRO NAGPAN-SITIO KALONBARAK ROAD LEADING TO KALONBARAK SKYLINE, BRGY. POB., MALUNGON, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱34.3M | 100% | Low risk28 | —-0.086 |
| 204 | 18CC0333CONSTRUCTION OF TWO STOREY EIGHT CLASSROOM - PUNGO ELEMENTARY SCHOOL CALUMPIT, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱19.3M | 100% | Low risk28 | —-0.051 |
| 205 | 18ID0078WIDENING OF BRIDGE-JUGABAN BRIDGE(B00532LT) ALONG PALO-CARIGARA-ORMOC ROAD | Region VIII | Leyte 2nd DEO | Completed | ₱4.3M | 100% | Low risk23 | —-0.060 |
| 206 | 18MC0126CONCRETING OF NUEVA VIDA-LUZ VILLAGE FMR, MLANG, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱39.8M | 100% | Low risk23 | —-0.026 |
| 207 | 18MC0125CONCRETING OF LIKA-NEW LAWAAN FMR, BRGY. LIKA AND NEW LAWAAN, MLANG, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱39.8M | 100% | Low risk23 | —-0.026 |
| 208 | 18MC0127CONCRETING OF NUEVA VIDA- NEW ESPERANZA-CALUNASAN FMR, MLANG, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱39.8M | 100% | Low risk23 | —-0.026 |
| 209 | 18MC0128CONCRETING OF BRGY. INAS-BRGY. NEW ANTIQUE FMR, BRGY. INAS, MLANG, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱19.9M | 100% | Low risk22 | —-0.031 |
| 210 | 18MC0131CONCRETING OF CROSSING GAMBODES-PROPER FMR, ARAKAN, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱19.9M | 100% | Low risk22 | —-0.032 |
| 211 | 19IC0058CONST. OF MULTI-PURPOSE BUILDING (BRGY. HALL), BRGY. SALVACION, PALO, LEYTE | Region VIII | Leyte 1st DEO | Completed | ₱1.9M | 100% | Low risk21 | —-0.097 |
| 212 | 17ID0032CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS REHABILITATION/MAJOR REPAIR OF EXISTING PERMANENT BRIDGES MALIRONG BRIDGE(B00620LT) ALONG STA. FE-PASTRANA-DAGAMI ROAD,PASTRANA,LEYTE | Region VIII | Leyte 2nd DEO | Completed | ₱830.7K | 100% | Low risk20 | —-0.032 |
| 213 | 19IG0082CONSTRUCTION OF WATER SYSTEM - LEVEL II, JAVIER (BUGHO) LEYTE | Region VIII | Leyte 5th DEO | Completed | ₱979.5K | 100% | Low risk20 | —-0.059 |
| 214 | 18MC0124CONCRETING OF BUAYAN FMR GOING TO SLAUGHTERHOUSE, BRGY. BUAYAN, MLANG, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱11.9M | 100% | Low risk20 | —-0.032 |
| 215 | 20IA0014CONSTRUCTION OF ACCESS ROAD (CAPITOL COMPOUND) BRGY. CALUMPANG | Region VIII | Biliran DEO | Completed | ₱1.9M | 100% | Low risk19 | —-0.094 |
| 216 | 18HH0002CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AT BRGY. PAHINA SAN NICOLAS, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱1.9M | 100% | Low risk18 | —-0.078 |
| 217 | 18HH0033COMPLETION OF MULTI PURPOSE BUILDING (ABELLANA ELEMENTARY SCHOOL), BRGY. SAMBAG I, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱488.3K | 100% | Low risk13 | —-0.091 |