Opening the dossier…
Opening the dossier…
Contractor dossier
156 projects on file, including joint ventures this contractor is part of.
Total projects
156
Total budget
₱6.7B
Average progress
89.5%
Completion rate
69.2%
Below 70%
Average risk score
49.7
Medium risk on average, out of 100
Flagged as unusual
7
4.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 142 | ₱5.7B | 48.6 | 6 | 89.0% |
| Region IX | 11 | ₱695.6M | 61.8 | 1 | 95.1% |
| Region VI | 2 | ₱190.9M | 60.2 | 0 | 100.0% |
| Region VII | 1 | ₱49M | 50.8 | 0 | 89.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 61 | ₱2.8B | 47.9 | 0 | 96.4% |
| Buildings and Facilities | 30 | ₱805.6M | 35.6 | 0 | 86.0% |
| Flood Control and Drainage | 28 | ₱1.7B | 53.0 | 1 | 90.5% |
| Bridges | 11 | ₱133.8M | 34.9 | 0 | 99.5% |
| Water Provision and Storage | 7 | ₱203.6M | 39.5 | 0 | 86.6% |
| GAA 2025 SSP | 6 | ₱48.2M | 93.1 | 5 | 46.7% |
| OTHER | 5 | ₱469M | 75.0 | 0 | 100.0% |
| GAA 2025 OO-1 | 4 | ₱174.3M | 92.6 | 1 | 60.5% |
| GAA 2025 OO-2 | 2 | ₱100.8M | 88.9 | 0 | 49.7% |
| Bridges, Roads | 2 | ₱230.1M | 69.8 | 0 | 77.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KI0052BASIC INFRASTRUCTURE PROGRAM - BIP - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY PROPER LANGCANGAN, OROQUIETA CITY, MISAMIS OCCIDENTAL. | Region X | Misamis Occidental 1st DEO | On-Going | ₱14.7M | 90% | High risk95 | —-0.004 |
| 25KJ0096ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES, CONCRETING OF BARANGAY ROAD, PUROK 6, BRGY. CARANGAN, OZAMIZ CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱11.6M | 34% | High risk95 | Flagged0.010 |
| 25KJ0056CONSTRUCTION OF OVERPASS, BRGY. PANGABUAN, TANGUB CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱14.6M | 36% | High risk95 | Flagged0.011 |
| 25KJ0117ROAD WIDENING - PRIMARY ROADS OZAMIZ - PAGADIAN RD., K1669+287 - K1669+516.5, K1669+545.5 - K1670+070, K1691+324 - K1692+124.5, K1692+145.5 - K1692+566.982, K1692+678.941- K1692+789 | Region X | Misamis Occidental 2nd DEO | On-Going | ₱82.1M | 1% | High risk94 | Flagged0.019 |
| 25KJ0104CONSTRUCTION OF BY-PASS AND DIVERSION ROADS PANGUIL BAY COASTAL ROAD (OZAMIZ - TANGUB SECTION) | Region X | Misamis Occidental 2nd DEO | On-Going | ₱47.8M | 85% | High risk94 | —-0.010 |
| 25KE0011CONSTRUCTION OF RIVER CONTROL ALONG LUMAD BRIDGE, MAMBAJAO, CAMIGUIN | Region X | Camiguin DEO | On-Going | ₱96M | 95% | High risk93 | —-0.017 |
| 25KJ0046CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING (BARANGAY HEALTH STATION), BRGY. BALATACAN, TANGUB CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱2.5M | 25% | High risk92 | Flagged0.016 |
| 25KJ0108CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HEALTH STATION), BRGY. TUNO, DON VICTORIANO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱2.4M | 58% | High risk92 | Flagged0.008 |
| 25KJ0073CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MOUNTAIN BYPASS ROAD (SITIO TIGBAKAN TO SITIO MORALONG SECTION, DON VICTORIANO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱19.4M | 85% | High risk91 | —-0.012 |
| 25KI0039BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - TIPALAC BR. (B00378MN) ALONG OROQUIETA CITY-CALAMBA MT. RD | Region X | Misamis Occidental 1st DEO | On-Going | ₱25.1M | 70% | High risk91 | —-0.007 |
| 25KJ0053CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING (BARANGAY HEALTH STATION), BRGY. VAHAYAG, TUDELA MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱2.5M | 37% | High risk90 | Flagged0.011 |
| 25KJ0103CONSTRUCTION OF ROAD CANAL, BRGY. STO. NIÑO, TANGUB CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱4.8M | 4% | High risk85 | —-0.003 |
| 18KJ0190CONSTRUCTION OF USUGAN RIVER RIVER CONTROL INCLUDING BRIDGE, BONIFACIO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱233.2M | 100% | High risk79 | —-0.003 |
| 24KL0001CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SOLANA RIVER (UPSTREAM & DOWNSTREAM OF SOLANA BY-PASS BRIDGE) PACKAGE 2, JASAAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱96.5M | 100% | High risk78 | —-0.025 |
| 23KC0044ROAD WIDENING ALONG SAYRE HIGHWAY - K1455+562-K1456+467, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱72.4M | 100% | High risk75 | —-0.031 |
| 23J00104CONSTRUCTION OF NEW BRIDGES - LIBA BRIDGE ALONG SINDANGAN-BAYOG-LAKEWOOD ROAD (PHASE II) | Region IX | Region IX | On-Going | ₱144M | 54% | High risk75 | —-0.004 |
| 18J00042CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SEAWALL, BAYBAY, LILOY, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱106.1M | 92% | High risk72 | Flagged0.009 |
| 24KC0022ROAD WIDENING JCT. SH AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) - K1515+320-K1515+720, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱33.1M | 100% | High risk72 | —-0.039 |
| 23KD0015ROAD WIDENING BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY ROAD K1424+831 TO K1425+831 | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱33.8M | 100% | High risk71 | —-0.028 |
| 24J00069CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - IPIL CIRCUMFERENTIAL ROAD PACKAGE 3, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱118.9M | 100% | High risk70 | —-0.040 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KJ0117ROAD WIDENING - PRIMARY ROADS OZAMIZ - PAGADIAN RD., K1669+287 - K1669+516.5, K1669+545.5 - K1670+070, K1691+324 - K1692+124.5, K1692+145.5 - K1692+566.982, K1692+678.941- K1692+789 | Region X | Misamis Occidental 2nd DEO | On-Going | ₱82.1M | 1% | High risk94 | Flagged0.019 |
| 25KJ0046CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING (BARANGAY HEALTH STATION), BRGY. BALATACAN, TANGUB CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱2.5M | 25% | High risk92 | Flagged0.016 |
| 25KJ0053CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING (BARANGAY HEALTH STATION), BRGY. VAHAYAG, TUDELA MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱2.5M | 37% | High risk90 | Flagged0.011 |
| 25KJ0056CONSTRUCTION OF OVERPASS, BRGY. PANGABUAN, TANGUB CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱14.6M | 36% | High risk95 | Flagged0.011 |
| 25KJ0096ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES, CONCRETING OF BARANGAY ROAD, PUROK 6, BRGY. CARANGAN, OZAMIZ CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱11.6M | 34% | High risk95 | Flagged0.010 |
| 18J00042CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SEAWALL, BAYBAY, LILOY, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱106.1M | 92% | High risk72 | Flagged0.009 |
| 25KJ0108CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HEALTH STATION), BRGY. TUNO, DON VICTORIANO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱2.4M | 58% | High risk92 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25KI0052BASIC INFRASTRUCTURE PROGRAM - BIP - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY PROPER LANGCANGAN, OROQUIETA CITY, MISAMIS OCCIDENTAL. | Region X | Misamis Occidental 1st DEO | On-Going | ₱14.7M | 90% | High risk95 | —-0.004 |
| 2 | 25KJ0096ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES, CONCRETING OF BARANGAY ROAD, PUROK 6, BRGY. CARANGAN, OZAMIZ CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱11.6M | 34% | High risk95 | Flagged0.010 |
| 3 | 25KJ0056CONSTRUCTION OF OVERPASS, BRGY. PANGABUAN, TANGUB CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱14.6M | 36% | High risk95 | Flagged0.011 |
| 4 | 25KJ0117ROAD WIDENING - PRIMARY ROADS OZAMIZ - PAGADIAN RD., K1669+287 - K1669+516.5, K1669+545.5 - K1670+070, K1691+324 - K1692+124.5, K1692+145.5 - K1692+566.982, K1692+678.941- K1692+789 | Region X | Misamis Occidental 2nd DEO | On-Going | ₱82.1M | 1% | High risk94 | Flagged0.019 |
| 5 | 25KJ0104CONSTRUCTION OF BY-PASS AND DIVERSION ROADS PANGUIL BAY COASTAL ROAD (OZAMIZ - TANGUB SECTION) | Region X | Misamis Occidental 2nd DEO | On-Going | ₱47.8M | 85% | High risk94 | —-0.010 |
| 6 | 25KE0011CONSTRUCTION OF RIVER CONTROL ALONG LUMAD BRIDGE, MAMBAJAO, CAMIGUIN | Region X | Camiguin DEO | On-Going | ₱96M | 95% | High risk93 | —-0.017 |
| 7 | 25KJ0046CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING (BARANGAY HEALTH STATION), BRGY. BALATACAN, TANGUB CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱2.5M | 25% | High risk92 | Flagged0.016 |
| 8 | 25KJ0108CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HEALTH STATION), BRGY. TUNO, DON VICTORIANO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱2.4M | 58% | High risk92 | Flagged0.008 |
| 9 | 25KJ0073CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MOUNTAIN BYPASS ROAD (SITIO TIGBAKAN TO SITIO MORALONG SECTION, DON VICTORIANO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱19.4M | 85% | High risk91 | —-0.012 |
| 10 | 25KI0039BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - TIPALAC BR. (B00378MN) ALONG OROQUIETA CITY-CALAMBA MT. RD | Region X | Misamis Occidental 1st DEO | On-Going | ₱25.1M | 70% | High risk91 | —-0.007 |
| 11 | 25KJ0053CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING (BARANGAY HEALTH STATION), BRGY. VAHAYAG, TUDELA MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱2.5M | 37% | High risk90 | Flagged0.011 |
| 12 | 25KJ0103CONSTRUCTION OF ROAD CANAL, BRGY. STO. NIÑO, TANGUB CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱4.8M | 4% | High risk85 | —-0.003 |
| 13 | 18KJ0190CONSTRUCTION OF USUGAN RIVER RIVER CONTROL INCLUDING BRIDGE, BONIFACIO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱233.2M | 100% | High risk79 | —-0.003 |
| 14 | 24KL0001CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SOLANA RIVER (UPSTREAM & DOWNSTREAM OF SOLANA BY-PASS BRIDGE) PACKAGE 2, JASAAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱96.5M | 100% | High risk78 | —-0.025 |
| 15 | 23KC0044ROAD WIDENING ALONG SAYRE HIGHWAY - K1455+562-K1456+467, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱72.4M | 100% | High risk75 | —-0.031 |
| 16 | 23J00104CONSTRUCTION OF NEW BRIDGES - LIBA BRIDGE ALONG SINDANGAN-BAYOG-LAKEWOOD ROAD (PHASE II) | Region IX | Region IX | On-Going | ₱144M | 54% | High risk75 | —-0.004 |
| 17 | 18J00042CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SEAWALL, BAYBAY, LILOY, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱106.1M | 92% | High risk72 | Flagged0.009 |
| 18 | 24KC0022ROAD WIDENING JCT. SH AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) - K1515+320-K1515+720, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱33.1M | 100% | High risk72 | —-0.039 |
| 19 | 23KD0015ROAD WIDENING BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY ROAD K1424+831 TO K1425+831 | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱33.8M | 100% | High risk71 | —-0.028 |
| 20 | 24J00069CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - IPIL CIRCUMFERENTIAL ROAD PACKAGE 3, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱118.9M | 100% | High risk70 | —-0.040 |
| 21 | 22J00054CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - IPIL CIRCUMFERENTIAL ROAD, VETERANS-TIAYON-DON ANDRES SECTION, PACKAGE I, INCLUDING BRIDGE, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱86M | 100% | High risk65 | —-0.015 |
| 22 | 24KE0055CONSTRUCTION OF DINANGASAN RIVER CONTROL, INCL. ROW, PACKAGE 2, CATARMAN, CAMIGUIN | Region X | Camiguin DEO | On-Going | ₱140.5M | 99% | High risk63 | —-0.026 |
| 23 | 16JB0068CONSTRUCTION OF DIPOLOG RIVER FLOOD CONTROL DEVELOPMENT PROJECT, BRGY. TURNO, DIPOLOG CITY, ZAMBOANGA DEL NORTE 2ND LD. | Region IX | Zamboanga del Norte 2nd DEO | Completed | ₱38.9M | 100% | High risk63 | —-0.045 |
| 24 | 22J00055CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - IPIL CIRCUMFERENTIAL ROAD, VETERANS - TIAYON - DON ANDRES SECTION, PACKAGE II, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱85.9M | 100% | High risk63 | —-0.022 |
| 25 | 17JE0067CONST./MAINT. OF FLOOD MITIGATION STRUCTURE & DRAINAGE SYSTEM, CONST. OF FLOOD CONTROL LOWER LANDING BRIDGE(DOWNSTREAM) ALONG MAHAYAG-STRUCT DUMINGAG ROAD, DUMINGAG, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 1st DEO | Completed | ₱23.8M | 100% | High risk62 | —-0.048 |