Contractor dossier
156 projects on file, including joint ventures this contractor is part of.
Total projects
156
Total budget
₱6.7B
Average progress
89.5%
Completion rate
69.2%
Below 70%
Average risk score
49.7
Medium risk on average, out of 100
Flagged as unusual
7
4.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 142 | ₱5.7B | 48.6 | 6 | 89.0% |
| Region IX | 11 | ₱695.6M | 61.8 | 1 | 95.1% |
| Region VI | 2 | ₱190.9M | 60.2 | 0 | 100.0% |
| Region VII | 1 | ₱49M | 50.8 | 0 | 89.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 61 | ₱2.8B | 47.9 | 0 | 96.4% |
| Buildings and Facilities | 30 | ₱805.6M | 35.6 | 0 | 86.0% |
| Flood Control and Drainage | 28 | ₱1.7B | 53.0 | 1 | 90.5% |
| Bridges | 11 | ₱133.8M | 34.9 | 0 | 99.5% |
| Water Provision and Storage | 7 | ₱203.6M | 39.5 | 0 | 86.6% |
| GAA 2025 SSP | 6 | ₱48.2M | 93.1 | 5 | 46.7% |
| OTHER | 5 | ₱469M | 75.0 | 0 | 100.0% |
| GAA 2025 OO-1 | 4 | ₱174.3M | 92.6 | 1 | 60.5% |
| GAA 2025 OO-2 | 2 | ₱100.8M | 88.9 | 0 | 49.7% |
| Bridges, Roads | 2 | ₱230.1M | 69.8 | 0 | 77.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KI0052BASIC INFRASTRUCTURE PROGRAM - BIP - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY PROPER LANGCANGAN, OROQUIETA CITY, MISAMIS OCCIDENTAL. | Region X | Misamis Occidental 1st DEO | On-Going | ₱14.7M | 90% | High risk95 | —-0.004 |
| 25KJ0096ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES, CONCRETING OF BARANGAY ROAD, PUROK 6, BRGY. CARANGAN, OZAMIZ CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱11.6M | 34% | High risk95 | Flagged0.010 |
| 25KJ0056CONSTRUCTION OF OVERPASS, BRGY. PANGABUAN, TANGUB CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱14.6M | 36% | High risk95 | Flagged0.011 |
| 25KJ0117ROAD WIDENING - PRIMARY ROADS OZAMIZ - PAGADIAN RD., K1669+287 - K1669+516.5, K1669+545.5 - K1670+070, K1691+324 - K1692+124.5, K1692+145.5 - K1692+566.982, K1692+678.941- K1692+789 | Region X | Misamis Occidental 2nd DEO | On-Going | ₱82.1M | 1% | High risk94 | Flagged0.019 |
| 25KJ0104CONSTRUCTION OF BY-PASS AND DIVERSION ROADS PANGUIL BAY COASTAL ROAD (OZAMIZ - TANGUB SECTION) | Region X | Misamis Occidental 2nd DEO | On-Going | ₱47.8M | 85% | High risk94 | —-0.010 |
| 25KE0011CONSTRUCTION OF RIVER CONTROL ALONG LUMAD BRIDGE, MAMBAJAO, CAMIGUIN | Region X | Camiguin DEO | On-Going | ₱96M | 95% | High risk93 | —-0.017 |
| 25KJ0046CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING (BARANGAY HEALTH STATION), BRGY. BALATACAN, TANGUB CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱2.5M | 25% | High risk92 | Flagged0.016 |
| 25KJ0108CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HEALTH STATION), BRGY. TUNO, DON VICTORIANO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱2.4M | 58% | High risk92 | Flagged0.008 |
| 25KJ0073CONSTRUCTION OF BY-PASS AND DIVERSION ROADS MOUNTAIN BYPASS ROAD (SITIO TIGBAKAN TO SITIO MORALONG SECTION, DON VICTORIANO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱19.4M | 85% | High risk91 | —-0.012 |
| 25KI0039BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - TIPALAC BR. (B00378MN) ALONG OROQUIETA CITY-CALAMBA MT. RD | Region X | Misamis Occidental 1st DEO | On-Going | ₱25.1M | 70% | High risk91 | —-0.007 |
| 25KJ0053CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING (BARANGAY HEALTH STATION), BRGY. VAHAYAG, TUDELA MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱2.5M | 37% | High risk90 | Flagged0.011 |
| 25KJ0103CONSTRUCTION OF ROAD CANAL, BRGY. STO. NIÑO, TANGUB CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱4.8M | 4% | High risk85 | —-0.003 |
| 18KJ0190CONSTRUCTION OF USUGAN RIVER RIVER CONTROL INCLUDING BRIDGE, BONIFACIO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱233.2M | 100% | High risk79 | —-0.003 |
| 24KL0001CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SOLANA RIVER (UPSTREAM & DOWNSTREAM OF SOLANA BY-PASS BRIDGE) PACKAGE 2, JASAAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱96.5M | 100% | High risk78 | —-0.025 |
| 23KC0044ROAD WIDENING ALONG SAYRE HIGHWAY - K1455+562-K1456+467, MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱72.4M | 100% | High risk75 | —-0.031 |
| 23J00104CONSTRUCTION OF NEW BRIDGES - LIBA BRIDGE ALONG SINDANGAN-BAYOG-LAKEWOOD ROAD (PHASE II) | Region IX | Region IX | On-Going | ₱144M | 54% | High risk75 | —-0.004 |
| 18J00042CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SEAWALL, BAYBAY, LILOY, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱106.1M | 92% | High risk72 | Flagged0.009 |
| 24KC0022ROAD WIDENING JCT. SH AGLAYAN-ALANIB-TICALAAN ROAD (TICALAAN-PAGANAN SECT.) - K1515+320-K1515+720, TALAKAG, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱33.1M | 100% | High risk72 | —-0.039 |
| 23KD0015ROAD WIDENING BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY ROAD K1424+831 TO K1425+831 | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱33.8M | 100% | High risk71 | —-0.028 |
| 24J00069CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - IPIL CIRCUMFERENTIAL ROAD PACKAGE 3, ZAMBOANGA SIBUGAY | Region IX | Region IX | On-Going | ₱118.9M | 100% | High risk70 | —-0.040 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KJ0117ROAD WIDENING - PRIMARY ROADS OZAMIZ - PAGADIAN RD., K1669+287 - K1669+516.5, K1669+545.5 - K1670+070, K1691+324 - K1692+124.5, K1692+145.5 - K1692+566.982, K1692+678.941- K1692+789 | Region X | Misamis Occidental 2nd DEO | On-Going | ₱82.1M | 1% | High risk94 | Flagged0.019 |
| 25KJ0046CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING (BARANGAY HEALTH STATION), BRGY. BALATACAN, TANGUB CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱2.5M | 25% | High risk92 | Flagged0.016 |
| 25KJ0053CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING (BARANGAY HEALTH STATION), BRGY. VAHAYAG, TUDELA MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱2.5M | 37% | High risk90 | Flagged0.011 |
| 25KJ0056CONSTRUCTION OF OVERPASS, BRGY. PANGABUAN, TANGUB CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱14.6M | 36% | High risk95 | Flagged0.011 |
| 25KJ0096ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES, CONCRETING OF BARANGAY ROAD, PUROK 6, BRGY. CARANGAN, OZAMIZ CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱11.6M | 34% | High risk95 | Flagged0.010 |
| 18J00042CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SEAWALL, BAYBAY, LILOY, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱106.1M | 92% | High risk72 | Flagged0.009 |
| 25KJ0108CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HEALTH STATION), BRGY. TUNO, DON VICTORIANO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱2.4M | 58% | High risk92 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 25KM0026CONSTRUCTION (COMPLETION) OF ILIGAN CITY DEO BUILDING, ILIGAN CITY, LANAO DEL NORTE | Region X | Iligan City DEO | On-Going | ₱47.8M | 11% | Medium risk51 | —-0.029 |
| 52 | 25HO0009CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG BASAK RIVER (DOWNSTREAM RIGHT SIDE), BADI | Region VII | Cebu 7th DEO | On-Going | ₱49M | 90% | Medium risk51 | —-0.039 |
| 53 | 24KM0063CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANDULOG RIVER AT DIGKILAAN BRIDGE, ILIGAN CITY | Region X | Iligan City DEO | Completed | ₱77.2M | 100% | Medium risk51 | —-0.076 |
| 54 | 17K00401CONST. OF BY-PASSES/DIVERSION RDS,INCL.ROW,PANGUIL BAY ACCESS RD(TANGUB-COASTAL SECT),PACKAGE 1,MIS. | Region X | Region X | Completed | ₱132.8M | 100% | Medium risk51 | —-0.033 |
| 55 | 22KE0011CONSTRUCTION OF DINANGGASAN RIVER CONTROL, PACKAGE 2 | Region X | Camiguin DEO | Completed | ₱66.4M | 100% | Medium risk50 | —-0.076 |
| 56 | 23KC0033ROAD WIDENING ALONG SAYRE HIGHWAY K1458+374-K1458+844 , MANOLO FORTICH, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱54M | 100% | Medium risk50 | —-0.089 |
| 57 | 20KK0138CONSTRUCTION OF FLOOD CONTROL ALONG GAHUB RIVER DOWNSTREAM, GINGOOG CITY, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱77.6M | 100% | Medium risk50 | —-0.072 |
| 58 | 18KJ0006CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS OZAMIZ-CLARIN-TANGUB-BONIFACIO-DON VICTORIANO AGRO ECO TOURISM HINTERLAND PROJECTS (SECTION2) BRGY. SEGATIC TO BRGY. STIMSON ABORDO, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱55M | 100% | Medium risk50 | —-0.088 |
| 59 | 18KJ0194CONCRETING OF ACCESS ROAD LEADING TO GALA WATER FALLS, BARANGAY LUPAGAN, CLARIN TO BARANGAY GALA, TUDELA, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱55M | 100% | Medium risk50 | —-0.090 |
| 60 | 23KD0018CONST. OF BY PASS RD-JCT. BCIR-AGUSAN-BALUBAL-SAYRE HIGHWAY, PACKAGE 3 CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱47.5M | 100% | Medium risk49 | —-0.091 |
| 61 | 24K00099CONST. OF BY-PASS AND DIVERSION ROADS-PUERTO-CLAVERIA BY-PASS ROAD, TAGOLOAN BRIDGE 3 (PHASE III), MISAMIS ORIENTAL | Region X | Region X | On-Going | ₱49.1M | 100% | Medium risk49 | —-0.029 |
| 62 | 22KJ0088IMPROVEMENT OF ROAD, AGUADA 5OTH DISRICT-CARMEN SECTION WITH STREETLIGHTS, OZAMIZ CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱47.5M | 100% | Medium risk49 | —-0.092 |
| 63 | 24KJ0139COMPLETION OF MULTI-PURPOSE BUILDING WITH SITE DEVELOPMENT, TUDELA, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱38.4M | 97% | Medium risk49 | —-0.055 |
| 64 | 22KL0053CONSTRUCTION OF ROAD (WITH CANAL) AT BARANGAY SAN ANTONIO TO BARANGAY DANAO, JASAAN, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.094 |
| 65 | 22KL0055CONSTRUCTION OF ROAD (WITH CANAL) AT BARANGAY HINAPLANAN TO BARANGAY ANI-E, CLAVERIA, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.094 |
| 66 | 24KM0088CONSTRUCTION OF BY-PASS AND DIVERSION ROADS AT ILIGAN CITY CIRCUMFERENTIAL ROAD (C3), PHASE II, ILIGAN CITY | Region X | Iligan City DEO | On-Going | ₱46.8M | 65% | Medium risk49 | —-0.046 |
| 67 | 18KJ0192REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS, OZAMIZ-PAGADIAN ROAD-K1661+000-K1662+052, K1696+687-K1697+380, K1672+324-K1673+054 (INCLUDING THE OLD NATIONAL HIGHWAY SUMIRAP SECTION) MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱50.1M | 100% | Medium risk49 | —-0.085 |
| 68 | 17KJ0056CONSTRUCTION/UPGRADING/REHBAILITATION OF DRAINAGE ALONG NATIONAL ROADS, TAN AVENUE K1685+435-K1687+1071, TAN AVENUE, TANGUB CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | Completed | ₱83.9M | 100% | Medium risk49 | —-0.051 |
| 69 | 24KJ0138CONSTRUCTION OF MULTI-PURPOSE BUILDING (CITY JAIL), OZAMIZ CITY, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 2nd DEO | On-Going | ₱28.8M | 0% | Medium risk48 | —-0.024 |
| 70 | 18KI0027CONSTRUCTION OF COASTAL PROTECTION, PANAON, MISAMIS OCCIDENTAL | Region X | Misamis Occidental 1st DEO | Completed | ₱47M | 100% | Medium risk48 | —-0.074 |
| 71 | 23KD0046CONSTRUCTION OF WATER SUPPLY SYSTEM IN BARANGAY BALUBAL CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱47.8M | 100% | Medium risk48 | —-0.049 |
| 72 | 23KD0045CONSTRUCTION OF WATER SUPPLY SYSTEM BARANGAY CUGMAN, CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 2nd DEO | Completed | ₱47.7M | 100% | Medium risk48 | —-0.055 |
| 73 | 16KJ0086CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS, LABUYO-TANGUB-SILANGA ACCESS ROAD LEADING TO SILANGA PORT, TANGUB CITY, MIS. OCC. 2ND LD, K1684+704.00-K1687+040.00 | Region X | Misamis Occidental 2nd DEO | Completed | ₱47.8M | 100% | Medium risk48 | —-0.066 |
| 74 | 17KI0005REHAB/RECONS. OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES, OROQ. CITY - CAL. MT. ROAD, K1748+091 -1748+125; 1749+267 -K1749+287; 1752+160 - K1752+220; K1752+165-K1752+250; K1755+120-K1755+165; K1759+312-K1759+396; K1761+912-K1761+943; K176 | Region X | Misamis Occidental 1st DEO | Completed | ₱21M | 100% | Medium risk47 | —-0.069 |
| 75 | 17KI0001REHAB./RECONST./UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON HDM-4, OROQUIETA CITY - CALAMABA MT. ROAD, K1746+267 TO K1747+000 ; K1773+760 TO K1774+000 | Region X | Misamis Occidental 1st DEO | Completed | ₱27.1M | 100% | Medium risk47 | —-0.067 |