Opening the dossier…
Opening the dossier…
Contractor dossier
422 projects on file, including joint ventures this contractor is part of.
Total projects
422
Total budget
₱7.8B
Average progress
98.1%
Completion rate
89.8%
Average risk score
42.0
Medium risk on average, out of 100
Flagged as unusual
28
6.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 401 | ₱7.6B | 42.0 | 28 | 98.0% |
| Region VI | 11 | ₱106.7M | 46.2 | 0 | 99.9% |
| Region III | 9 | ₱87.9M | 34.2 | 0 | 100.0% |
| Region IV-B | 1 | ₱57.2M | 46.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 140 | ₱5.2B | 46.9 | 10 | 98.2% |
| Roads | 125 | ₱1.6B | 38.5 | 5 | 98.1% |
| Buildings and Facilities | 101 | ₱540.8M | 35.9 | 2 | 98.2% |
| Water Provision and Storage | 42 | ₱405.5M | 44.0 | 8 | 97.1% |
| Bridges | 6 | ₱56.6M | 38.9 | 0 | 100.0% |
| OTHER | 5 | ₱83.9M | 72.1 | 0 | 99.1% |
| GAA 2025 SSP | 2 | ₱14.2M | 94.6 | 2 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱28.4M | 87.0 | 1 | 70.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AF0122CONSTRUCTION OF BARANGAY HALL, BRGY. BAWANTA, BAUANG, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.009 |
| 25AF0129CONSTRUCTION OF ROAD, BRGY. ANGIN, NAGUILIAN, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱9.4M | 100% | High risk94 | Flagged0.008 |
| 25A00422CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF STA. CRUZ FLOOD CONTROL, BRGY. VILLA HERMOSA, STA. CRUZ, ILOCOS SUR | Region I | Region I | On-Going | ₱28.4M | 70% | High risk87 | Flagged0.004 |
| 25AD0021CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL IT)- KINMARIN-BOGUIBOG ROAD CONNECTING STA. CRUZ-SIGAY ROAD AND NATIONAL ROAD IN SUPPOR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱9.5M | 97% | High risk73 | —-0.002 |
| 24AD0066ASSET PRESERVATION-CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS- PRIMARY ROADS - MANILA NORTH ROAD DRAINAGE ALONG CALAOAAN-CALONGBUYAN CANAL | Region I | Ilocos Sur 2nd DEO | On-Going | ₱15.3M | 99% | High risk72 | —-0.001 |
| 22AD0042CONSTRUCTION OF SIDAOEN-BACSAYAN ROAD LEADING TO SANGBAY NI RAGSAK FALLS, BARANGAYS SIDAOEN AND BACSAYAN, STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.9M | 100% | High risk72 | —-0.029 |
| 21AD0080CONSTRUCTION/REHABILITATION OF ALILEM-SUDIPEN ROAD, ALILEM, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱29.4M | 100% | High risk72 | —-0.026 |
| 24AI0273CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE E) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0271CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE C) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0270CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE B) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0272CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE D) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0269CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE A) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 23AA0172CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM, BRGY. ESTER, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 70% | High risk71 | Flagged0.011 |
| 23AA0173CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM, POBLACION, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 100% | High risk71 | Flagged0.001 |
| 22AD0083CONSTRUCTION OF STA. LUCIA RIVER CONTROL,STA. LUCIA, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱19.8M | 100% | High risk71 | —-0.024 |
| 23AA0174CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM WITHIN VARIOUS BARANGAYS IN LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.8M | 96% | High risk71 | Flagged0.003 |
| 23AA0171CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF LEVEL III WATER SYSTEM IN LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱28.8M | 89% | High risk71 | Flagged0.007 |
| 23AA0043CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-WATER SUPPLY SYSTEMCONSTRUCTION OF WATER SYSTEM (LEVEL III), BRGY. SAOIT, PAGALI, PAAYAS, ABLAN, BAYOG, BUDUAN & POBLACION, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19M | 100% | High risk71 | Flagged0.003 |
| 23AA0175CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM, BRGY. CARUSIKIS, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.8M | 93% | High risk70 | Flagged0.006 |
| 23AA0176CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM, BRGY. TONOTON, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 33% | High risk70 | Flagged0.022 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AD0077CONCRETING OF BRGY. TAMPUGO - BRGY. BESALAN-SITIO UBBOG, BRGY. CAMANGAAN FMR, BRGY. TAMPUGO, STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱14.5M | 33% | Medium risk44 | Flagged0.023 |
| 23AA0176CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM, BRGY. TONOTON, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 33% | High risk70 | Flagged0.022 |
| 24AI0273CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE E) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0271CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE C) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0270CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE B) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0272CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE D) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0269CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE A) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 25AD0078CONCRETING OF BRGY. BUGBUGA -BRGY. COSCOSNONG FMR, BRGY. BUGBUGA, STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱14.5M | 51% | Medium risk44 | Flagged0.018 |
| 23AF0179CONST OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER BASIN (ARINGAY-TUBAO ROAD), ARINGAY, LA UNION | Region I | La Union 2nd DEO | Completed | ₱48.2M | 100% | High risk64 | Flagged0.017 |
| 24A00591CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU - ARINGAY SUPER HEALTH CENTER, LA UNION | Region I | Region I | On-Going | ₱11.9M | 55% | Medium risk43 | Flagged0.013 |
| 23AA0172CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM, BRGY. ESTER, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 70% | High risk71 | Flagged0.011 |
| 25AF0122CONSTRUCTION OF BARANGAY HALL, BRGY. BAWANTA, BAUANG, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.009 |
| 25AF0129CONSTRUCTION OF ROAD, BRGY. ANGIN, NAGUILIAN, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱9.4M | 100% | High risk94 | Flagged0.008 |
| 24AD0116CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS-BAGANI TOCGO ELEMENTARY SCHOOL, BRGY. BAGANI TOCGO, CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱4.5M | 69% | Medium risk32 | Flagged0.008 |
| 23AA0171CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF LEVEL III WATER SYSTEM IN LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱28.8M | 89% | High risk71 | Flagged0.007 |
| 24AG0188CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BANK SLOPE ALONG BALINGCAGUING RIVER (ALOLENG SECTION) STA. 003+296.6 - STA. 003+791.5, BARANGAY ALOLENG, AGNO, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk59 | Flagged0.007 |
| 23AA0175CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM, BRGY. CARUSIKIS, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.8M | 93% | High risk70 | Flagged0.006 |
| 24AG0187CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BANK SLOPE ALONG ALAMINOS RIVER (PALAMIS SECTION) STA. 016+967.6 - STA. 017+351.2, BARANGAY PALAMIS, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | High risk60 | Flagged0.004 |
| 25A00422CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF STA. CRUZ FLOOD CONTROL, BRGY. VILLA HERMOSA, STA. CRUZ, ILOCOS SUR | Region I | Region I | On-Going | ₱28.4M | 70% | High risk87 | Flagged0.004 |
| 23AA0043CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-WATER SUPPLY SYSTEMCONSTRUCTION OF WATER SYSTEM (LEVEL III), BRGY. SAOIT, PAGALI, PAAYAS, ABLAN, BAYOG, BUDUAN & POBLACION, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19M | 100% | High risk71 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 301 | 19AF0085CONCRETING BRGY. TAY-AC FMR, BRGY. TAY-AC, ROSARIO,LU | Region I | La Union 2nd DEO | Completed | ₱4.8M | 100% | Medium risk40 | —-0.034 |
| 302 | 21AD0019CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONSTRUCTION OF CABUGAO ROAD, BRGY. CABUGAO, SUYO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱4.7M | 100% | Medium risk40 | —-0.090 |
| 303 | 20AF0078CONCRETING OF BGRY. GALLANO FMR, GALLANO, ARINGAY, LU | Region I | La Union 2nd DEO | Completed | ₱12M | 100% | Medium risk39 | —-0.035 |
| 304 | 20AF0081CONCRETING OF BRGY AMLANG FMR, BRGY. ALANG, ROSARIO, LU | Region I | La Union 2nd DEO | Completed | ₱9.6M | 100% | Medium risk39 | —-0.036 |
| 305 | 19AF0083CONCRETING OF BRGY. PUROK - SAN ISIDRO FMR, BRGY PUROK & SAN ISIDRO, AGOO, LU | Region I | La Union 2nd DEO | Completed | ₱9.2M | 100% | Medium risk39 | —-0.033 |
| 306 | 22AF0049CONCRETING OF SITIO KAIMPUNGAN, BRGY. STA. RITA SUR FMR, BGRY. STA RITA SUR, AGOO, LA UNION | Region I | La Union 2nd DEO | Completed | ₱11.8M | 100% | Medium risk39 | —-0.032 |
| 307 | 23AE0094CONSTRUCTION OF PUROK 3 FMR, BRGY. CABARSICAN, CITY OF SAN FERNANDO, LA UNION | Region I | La Union 1st DEO | Completed | ₱9.9M | 100% | Medium risk39 | —-0.035 |
| 308 | 19AF0084CONCRETING OF SITIO AMBITAY, BRGY SAN ROQUE WEST FMR, BRGY. SAN ROQUE WEST | Region I | La Union 2nd DEO | Completed | ₱5.3M | 100% | Medium risk39 | —-0.034 |
| 309 | 24AI0168CONCRETING OF BRGY. MAAMBAL TO BRGY. HAWAY FMR, BRGY. HAWAY, POZORRUBIO, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱12.4M | 100% | Medium risk39 | —-0.037 |
| 310 | 21AD0116CONCRETING OF BRGY. SAN TIBURCIO FMR, BRGY. SAN TIBURCIO, SALCEDO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱11.9M | 100% | Medium risk39 | —-0.030 |
| 311 | 20AF0082CONCRETING OF SITIO BULALACAO, BRGY. BASCA FMR, BRGY. BASCA, ARINGAY, LU | Region I | La Union 2nd DEO | Completed | ₱9.7M | 100% | Medium risk39 | —-0.036 |
| 312 | 22AD0135CONCRETING OF BRGY. BATBATO FMR, BRGY. BATBATO, ALILEM, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱11.6M | 100% | Medium risk39 | —-0.032 |
| 313 | 17AI0353CONSTN OF TWO STRY FOUR CL SB AT BALUNGAO CENTRAL E/S, BALUNGAO, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱9.6M | 100% | Medium risk38 | —-0.020 |
| 314 | 17AD0126CONSTRUCTION OF CLASSROOMS MAYNGANAY ES, STA. MARIA, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱5.6M | 100% | Medium risk37 | —-0.017 |
| 315 | 17AI0620CONSTN OF TWO STRY SIX CL SB AT SAN LEON E/S, BALUNGAO, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱12.5M | 100% | Medium risk37 | —-0.018 |
| 316 | 17AI0552CONSTN OF TWO STRY FOUR CL SB AT RAJAL-ANGAYAN E/S, BALUNGAO, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱9.6M | 100% | Medium risk37 | —-0.019 |
| 317 | 17AI0313CONSTN OF TWO STRY FOUR CL SB AT MAUBAN E/S, BALUNGAO, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱9.6M | 100% | Medium risk37 | —-0.020 |
| 318 | 23CE0150CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY GEN. LUNA, CARRANGLAN, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱9.7M | 100% | Medium risk37 | —-0.068 |
| 319 | 23CE0149CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY PARISTA, LUPAO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱9.7M | 100% | Medium risk37 | —-0.068 |
| 320 | 23CE0147CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY LIGAYA, LLANERA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱9.8M | 100% | Medium risk36 | —-0.069 |
| 321 | 23CE0148CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY PACO ROMAN, RIZAL, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱9.8M | 100% | Medium risk35 | —-0.069 |
| 322 | 23CE0214CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY CONCEPCION, STO. DOMINGO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱9.8M | 100% | Medium risk33 | —-0.067 |
| 323 | 23CE0212CONSTRUCTION OF SOLAR WATER SYSTEM, ALIAGA NATIONAL HIGH, MUNICIPALITY OF ALIAGA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱9.8M | 100% | Medium risk33 | —-0.068 |
| 324 | 23CE0213CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY BIBICLAT, ALIAGA, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱9.8M | 100% | Medium risk33 | —-0.067 |
| 325 | 23CE0215CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY AQUINO, LICAB, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱9.8M | 100% | Medium risk33 | —-0.068 |