422 projects on file, including joint ventures this contractor is part of.
Total projects
422
Total budget
₱7.8B
Average progress
98.1%
Completion rate
89.8%
Average risk score
42.0
Medium risk on average, out of 100
Flagged as unusual
28
6.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 401 | ₱7.6B | 42.0 | 28 | 98.0% |
| Region VI | 11 | ₱106.7M | 46.2 | 0 | 99.9% |
| Region III | 9 | ₱87.9M | 34.2 | 0 | 100.0% |
| Region IV-B | 1 | ₱57.2M | 46.0 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 140 | ₱5.2B | 46.9 | 10 | 98.2% |
| Roads | 125 | ₱1.6B | 38.5 | 5 | 98.1% |
| Buildings and Facilities | 101 | ₱540.8M | 35.9 | 2 | 98.2% |
| Water Provision and Storage | 42 | ₱405.5M | 44.0 | 8 | 97.1% |
| Bridges | 6 | ₱56.6M | 38.9 | 0 | 100.0% |
| OTHER | 5 | ₱83.9M | 72.1 | 0 | 99.1% |
| GAA 2025 SSP | 2 | ₱14.2M | 94.6 | 2 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱28.4M | 87.0 | 1 | 70.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AF0122CONSTRUCTION OF BARANGAY HALL, BRGY. BAWANTA, BAUANG, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.009 |
| 25AF0129CONSTRUCTION OF ROAD, BRGY. ANGIN, NAGUILIAN, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱9.4M | 100% | High risk94 | Flagged0.008 |
| 25A00422CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF STA. CRUZ FLOOD CONTROL, BRGY. VILLA HERMOSA, STA. CRUZ, ILOCOS SUR | Region I | Region I | On-Going | ₱28.4M | 70% | High risk87 | Flagged0.004 |
| 25AD0021CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL IT)- KINMARIN-BOGUIBOG ROAD CONNECTING STA. CRUZ-SIGAY ROAD AND NATIONAL ROAD IN SUPPOR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱9.5M | 97% | High risk73 | —-0.002 |
| 24AD0066ASSET PRESERVATION-CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS- PRIMARY ROADS - MANILA NORTH ROAD DRAINAGE ALONG CALAOAAN-CALONGBUYAN CANAL | Region I | Ilocos Sur 2nd DEO | On-Going | ₱15.3M | 99% | High risk72 | —-0.001 |
| 22AD0042CONSTRUCTION OF SIDAOEN-BACSAYAN ROAD LEADING TO SANGBAY NI RAGSAK FALLS, BARANGAYS SIDAOEN AND BACSAYAN, STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.9M | 100% | High risk72 | —-0.029 |
| 21AD0080CONSTRUCTION/REHABILITATION OF ALILEM-SUDIPEN ROAD, ALILEM, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱29.4M | 100% | High risk72 | —-0.026 |
| 24AI0273CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE E) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0271CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE C) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0270CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE B) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0272CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE D) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0269CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE A) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 23AA0172CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM, BRGY. ESTER, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 70% | High risk71 | Flagged0.011 |
| 23AA0173CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM, POBLACION, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 100% | High risk71 | Flagged0.001 |
| 22AD0083CONSTRUCTION OF STA. LUCIA RIVER CONTROL,STA. LUCIA, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱19.8M | 100% | High risk71 | —-0.024 |
| 23AA0174CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM WITHIN VARIOUS BARANGAYS IN LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.8M | 96% | High risk71 | Flagged0.003 |
| 23AA0171CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF LEVEL III WATER SYSTEM IN LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱28.8M | 89% | High risk71 | Flagged0.007 |
| 23AA0043CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-WATER SUPPLY SYSTEMCONSTRUCTION OF WATER SYSTEM (LEVEL III), BRGY. SAOIT, PAGALI, PAAYAS, ABLAN, BAYOG, BUDUAN & POBLACION, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19M | 100% | High risk71 | Flagged0.003 |
| 23AA0175CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM, BRGY. CARUSIKIS, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.8M | 93% | High risk70 | Flagged0.006 |
| 23AA0176CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM, BRGY. TONOTON, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 33% | High risk70 | Flagged0.022 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AD0077CONCRETING OF BRGY. TAMPUGO - BRGY. BESALAN-SITIO UBBOG, BRGY. CAMANGAAN FMR, BRGY. TAMPUGO, STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱14.5M | 33% | Medium risk44 | Flagged0.023 |
| 23AA0176CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM, BRGY. TONOTON, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 33% | High risk70 | Flagged0.022 |
| 24AI0273CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE E) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0271CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE C) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0270CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE B) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0272CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE D) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 24AI0269CONSTRUCTION OF RIVER SLOPE/BANK PROTECTION STRUCTURE, CABALANCIAN RIVER, BALUNGAO, PANGASINAN (PACKAGE A) | Region I | Pangasinan 3rd DEO | On-Going | ₱95.4M | 100% | High risk72 | Flagged0.020 |
| 25AD0078CONCRETING OF BRGY. BUGBUGA -BRGY. COSCOSNONG FMR, BRGY. BUGBUGA, STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱14.5M | 51% | Medium risk44 | Flagged0.018 |
| 23AF0179CONST OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER BASIN (ARINGAY-TUBAO ROAD), ARINGAY, LA UNION | Region I | La Union 2nd DEO | Completed | ₱48.2M | 100% | High risk64 | Flagged0.017 |
| 24A00591CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU - ARINGAY SUPER HEALTH CENTER, LA UNION | Region I | Region I | On-Going | ₱11.9M | 55% | Medium risk43 | Flagged0.013 |
| 23AA0172CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM, BRGY. ESTER, VINTAR, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.4M | 70% | High risk71 | Flagged0.011 |
| 25AF0122CONSTRUCTION OF BARANGAY HALL, BRGY. BAWANTA, BAUANG, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.009 |
| 25AF0129CONSTRUCTION OF ROAD, BRGY. ANGIN, NAGUILIAN, LA UNION | Region I | La Union 2nd DEO | On-Going | ₱9.4M | 100% | High risk94 | Flagged0.008 |
| 24AD0116CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS-BAGANI TOCGO ELEMENTARY SCHOOL, BRGY. BAGANI TOCGO, CANDON CITY, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | On-Going | ₱4.5M | 69% | Medium risk32 | Flagged0.008 |
| 23AA0171CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF LEVEL III WATER SYSTEM IN LAOAG CITY, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱28.8M | 89% | High risk71 | Flagged0.007 |
| 24AG0188CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BANK SLOPE ALONG BALINGCAGUING RIVER (ALOLENG SECTION) STA. 003+296.6 - STA. 003+791.5, BARANGAY ALOLENG, AGNO, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk59 | Flagged0.007 |
| 23AA0175CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF WATER SYSTEM, BRGY. CARUSIKIS, PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱9.8M | 93% | High risk70 | Flagged0.006 |
| 24AG0187CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BANK SLOPE ALONG ALAMINOS RIVER (PALAMIS SECTION) STA. 016+967.6 - STA. 017+351.2, BARANGAY PALAMIS, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | High risk60 | Flagged0.004 |
| 25A00422CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF STA. CRUZ FLOOD CONTROL, BRGY. VILLA HERMOSA, STA. CRUZ, ILOCOS SUR | Region I | Region I | On-Going | ₱28.4M | 70% | High risk87 | Flagged0.004 |
| 23AA0043CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-WATER SUPPLY SYSTEMCONSTRUCTION OF WATER SYSTEM (LEVEL III), BRGY. SAOIT, PAGALI, PAAYAS, ABLAN, BAYOG, BUDUAN & POBLACION, BURGOS, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱19M | 100% | High risk71 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 23GH0149CONSTRUCTION OF SOLAR WATER SYSTEM, BRGY. GRANADA, CARLES, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.047 |
| 152 | 23GH0147CONSTRUCTION OF SOLAR WATER SYSTEM, BRGY. ASLUMAN, CARLES, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.047 |
| 153 | 23GD0081CONSTRUCTION OF SOLAR WATER SYSTEM, PILAR, CAPIZ | Region VI | Capiz 1st DEO | On-Going | ₱9.8M | 100% | Medium risk46 | —-0.022 |
| 154 | 23AD0044CONSTRUCTION OF POBLACION SUR RIVER CONTROL, BARANGAY POBLACION SUR, SALCEDO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱29.4M | 100% | Medium risk46 | —-0.061 |
| 155 | 23EH0052REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG LUBI-BINOOG ROAD, K0065+440 - K00065+480, K00065+620 - K0065+736, K0065+810 - K0065+894, TABLAS ISLAND, ROMBLON | Region IV-B | Romblon DEO | Completed | ₱57.2M | 100% | Medium risk46 | —-0.088 |
| 156 | 23GH0111CONSTRUCTION OF SOLAR WATER SYSTEM, NORTHERN ILOILO STATE UNIVERSITY (NISU) CONCEPCION CAMPUS, BRGY. POBLACION CONCEPCION, ILOILO | Region VI | Iloilo 3rd DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.048 |
| 157 | 22AD0082CONSTRUCTION OF SUGPON RIVER CONTROL, SUGPON, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱19.8M | 100% | Medium risk46 | —-0.064 |
| 158 | 19AI0310CONCRETING OF ROAD, BRGY. PUGARO-POBLACION LINE, BALUNGAO, PANGASINAN | Region I | Pangasinan 3rd DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.090 |
| 159 | 23GI0100CONSTRUCTION OF SOLAR WATER SYSTEM, ZARRAGA, ILOILO | Region VI | Iloilo 4th DEO | Completed | ₱9.7M | 100% | Medium risk46 | —-0.055 |
| 160 | 23GI0101CONSTRUCTION OF SOLAR WATER SYSTEM, PAVIA, ILOILO | Region VI | Iloilo 4th DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.055 |
| 161 | 23GI0098CONSTRUCTION OF SOLAR WATER SYSTEM, ALIMODIAN, ILOILO | Region VI | Iloilo 4th DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.056 |
| 162 | 22AD0079CONSTRUCTION OF ATABAY FLOOD CONTROL, SALCEDO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱14.7M | 100% | Medium risk46 | —-0.071 |
| 163 | 22AD0098CONSTRUCTION OF BALIDBID FLOOD CONTROL, SALCEDO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱14.7M | 100% | Medium risk46 | —-0.071 |
| 164 | 23GI0099CONSTRUCTION OF SOLAR WATER SYSTEM, LEON, ILOILO | Region VI | Iloilo 4th DEO | Completed | ₱9.7M | 100% | Medium risk46 | —-0.056 |
| 165 | 22AD0068ACCESS ROAD LEADING TO MADARANG FALLS, SALCEDO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱39.2M | 100% | Medium risk46 | —-0.071 |
| 166 | 21AD0048CONSTRUCTION OF ATABAY RIVER CONTROL , BRGY. ATABAY, SALCEDO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.067 |
| 167 | 22AF0001CONST./REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL STRUCTURES ALONG BAUANG RIVER BASIN, STA.0+000-STA0+900, BRGY. SUGUIDAN SUR, NAG., LU | Region I | La Union 2nd DEO | Completed | ₱45.1M | 100% | Medium risk45 | —-0.070 |
| 168 | 24AF0049BIP - FLOOD MITIGATION STRUC. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES - CONST. OF FLOOD CONTROL STRUC. ALONG ARINGAY RIVER BASIN, BRGY. LEONES EAST, TUBAO, LA UNION | Region I | La Union 2nd DEO | Completed | ₱29.7M | 100% | Medium risk45 | —-0.067 |
| 169 | 24AF0052BIP-FLOOD MITIGATION STRUC. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES - CONST OF FLOOD CONTROL STRUC. ALONG ARINGAY RIVER BASIN, BRGY. HALOG WEST, TUBAO, LA UNION | Region I | La Union 2nd DEO | Completed | ₱29.7M | 100% | Medium risk45 | —-0.067 |
| 170 | 24AF0051BIP-FLOOD MITIGATION STRUC. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES - CONST OF FLOOD CONTROL STRUC. ALONG ARINGAY RIVER BASIN. BRGY. MAGSAYSAY, TUBAO, LA UNION (PACKAGE 4) | Region I | La Union 2nd DEO | Completed | ₱29.7M | 100% | Medium risk45 | —-0.067 |
| 171 | 22AF0002CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURES ALONG BAUANG RIVER BASIN, STA.0+000-STA.0+900, BRGY. CABARITAN SUR, NAG, LU | Region I | La Union 2nd DEO | Completed | ₱45.1M | 100% | Medium risk45 | —-0.057 |
| 172 | 22AF0012CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BAUANG RIVER BASIN, STA 0+000-STA 0+900, BRGY. NATIVIDAD, NAG., LU | Region I | La Union 2nd DEO | Completed | ₱45M | 100% | Medium risk45 | —-0.070 |
| 173 | 20AD0089CONTINUATION OF LIDLIDDA FLOOD CONTROL ALONG SILAG-STA. MARIA RIVER, LIDLIDDA, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱12.5M | 100% | Medium risk45 | —-0.065 |
| 174 | 24AF0050BIP-FLOOD MITIGATION STRUC. PROTECTING MAJOR/STRATEGIC PUBLIC BLDGS/FACILITIES - CONST OF FLOOD CONTROL STRUC. ALONG ARINGAY RIVER BASIN, BRGY. LLOREN, TUBAO, LA UNION | Region I | La Union 2nd DEO | Completed | ₱29.7M | 100% | Medium risk45 | —-0.067 |
| 175 | 25A00132BASIC INFRASTRUCTURE PROGRAM (BIP) - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY HALOG EAST, TUBAO, LA UNION | Region I | Region I | Completed | ₱33.6M | 100% | Medium risk45 | —-0.068 |