Contractor dossier
90 projects on file, including joint ventures this contractor is part of.
Total projects
90
Total budget
₱3.3B
Average progress
94.7%
Completion rate
81.1%
Average risk score
52.1
Medium risk on average, out of 100
Flagged as unusual
5
5.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 67 | ₱2.8B | 52.5 | 4 | 94.9% |
| Region V | 23 | ₱505.6M | 51.1 | 1 | 94.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 75 | ₱2.9B | 49.7 | 0 | 96.6% |
| GAA 2025 SSP | 5 | ₱229.9M | 92.7 | 5 | 71.4% |
| Roads | 5 | ₱151.7M | 48.4 | 0 | 100.0% |
| Flood Control and Drainage | 2 | ₱9.6M | 48.9 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱28M | 86.7 | 0 | 24.1% |
| Bridges | 1 | ₱38.6M | 48.8 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱3M | 29.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OB0353CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY WACKWACK PACKAGE 7, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱97M | 55% | High risk95 | Flagged0.022 |
| 25OB0310CONSTRUCTION (COMPLETION) OF SENATE PRESIDENT NEPTALI GONZALES GENERAL HOSPITAL AT BARANGAY MAUWAY PACKAGE 7, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94.5M | 51% | High risk94 | Flagged0.023 |
| 25OB0374CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, BARANGAY BAGONG SILANG, MANDALUYONG CITY, PHASE | National Capital Region | Metro Manila 1st DEO | On-Going | ₱19.4M | 77% | High risk93 | Flagged0.008 |
| 25OB0382CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING INCLUDING COVERED WALKWAY, STP AND ELECTRICAL FACILITIES AT MANDALUYONG COLLEGE OF SCIENCE AND TECHNOLOGY, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱14.6M | 92% | High risk93 | Flagged0.001 |
| 25FH0047BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING,BARANGAY SAN ISIDRO VILLAGE,VIRAC,CATANDUANES | Region V | Catanduanes DEO | On-Going | ₱4.4M | 83% | High risk88 | Flagged0.000 |
| 25FH0078ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION (COMPLETION) OF SEAWALL, COMAGAYCAY, SAN ANDRES, CATANDU | Region V | Catanduanes DEO | On-Going | ₱28M | 24% | High risk87 | —-0.002 |
| 25OB0025CONSTRUCTION OF MULTI-PURPOSE BUILDING AT RIZAL TECHNOLOGICAL UNIVERSITY LIBRARY, BARANGAY MALAMIG, MANDALUYONG CITY (PACKAGE 3) | National Capital Region | Metro Manila 1st DEO | On-Going | ₱95.1M | 0% | High risk63 | —-0.020 |
| 24OB0358CONSTRUCTION OF MULTI-PURPOSE BUILDING AT THE NATIONAL CENTER FOR MENTAL HEALTH (PACKAGE 6) DESIGNATED AS THE SENATE PRESIDENT NEPTALI A. GONZALES GENERAL HOSPITAL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱95.1M | 100% | High risk63 | —-0.080 |
| 24OB0357CONSTRUCTION OF MULTI-PURPOSE BUILDING AT THE NATIONAL CENTER FOR MENTAL HEALTH (PACKAGE 5) DESIGNATED AS THE SENATE PRESIDENT NEPTALI A. GONZALES GENERAL HOSPITAL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱95M | 100% | High risk63 | —-0.080 |
| 24OB0354CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (10-STOREY LIBRARY BUILDING, WITH BASEMENT) AT RIZAL TECHNOLOGICAL UNIVERSITY PACKAGE 2, MALAMIG, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱95.1M | 100% | High risk63 | —-0.082 |
| 24OB0353CONSTRUCTION (COMPLETION) OF MULTI- PURPOSE BUILDING (10-STOREY LIBRARY BUILDING, WITH BASEMENT) AT RIZAL TECHNOLOGICAL UNIVERSITY PACKAGE 1, MALAMIG, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱95.1M | 100% | High risk63 | —-0.082 |
| 22OB0046CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. WACK WACK, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱93.6M | 100% | High risk62 | —-0.080 |
| 23OB0015CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY WACK-WACK, PACKAGE 3, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱93.6M | 100% | High risk62 | —-0.083 |
| 23OB0392CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY WACK WACK PACKAGE 4, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱93.6M | 100% | High risk62 | —-0.083 |
| 23OB0393CONSTRUCTION OF MULTI PURPOSE BUILDING AT BARANGAY BAGONG SILANG, MANDALUYONG CITY, PHASE 1 | National Capital Region | Metro Manila 1st DEO | Completed | ₱93.6M | 100% | High risk62 | —-0.069 |
| 23OB0399CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY BAGONG SILANG, MANDALUYONG CITY, PHASE 2 | National Capital Region | Metro Manila 1st DEO | Completed | ₱93.6M | 100% | High risk62 | —-0.071 |
| 24OB0394CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY WACK WACK PACKAGE 5, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱96.9M | 100% | High risk62 | —-0.083 |
| 17OB0360CONSTRUCTION OF MANDALUYONG CITY JAIL, COMPLETION OF FACILITIES INCLUDING GROUND IMPROVEMENT, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱251.7M | 100% | High risk62 | —-0.020 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OB0310CONSTRUCTION (COMPLETION) OF SENATE PRESIDENT NEPTALI GONZALES GENERAL HOSPITAL AT BARANGAY MAUWAY PACKAGE 7, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94.5M | 51% | High risk94 | Flagged0.023 |
| 25OB0353CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY WACKWACK PACKAGE 7, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱97M | 55% | High risk95 | Flagged0.022 |
| 25OB0374CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, BARANGAY BAGONG SILANG, MANDALUYONG CITY, PHASE | National Capital Region | Metro Manila 1st DEO | On-Going | ₱19.4M | 77% | High risk93 | Flagged0.008 |
| 25OB0382CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING INCLUDING COVERED WALKWAY, STP AND ELECTRICAL FACILITIES AT MANDALUYONG COLLEGE OF SCIENCE AND TECHNOLOGY, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱14.6M | 92% | High risk93 | Flagged0.001 |
| 25FH0047BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING,BARANGAY SAN ISIDRO VILLAGE,VIRAC,CATANDUANES | Region V | Catanduanes DEO | On-Going | ₱4.4M | 83% | High risk88 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25OB0353CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY WACKWACK PACKAGE 7, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱97M | 55% | High risk95 | Flagged0.022 |
| 2 | 25OB0310CONSTRUCTION (COMPLETION) OF SENATE PRESIDENT NEPTALI GONZALES GENERAL HOSPITAL AT BARANGAY MAUWAY PACKAGE 7, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱94.5M | 51% | High risk94 | Flagged0.023 |
| 3 | 25OB0374CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, BARANGAY BAGONG SILANG, MANDALUYONG CITY, PHASE | National Capital Region | Metro Manila 1st DEO | On-Going | ₱19.4M | 77% | High risk93 | Flagged0.008 |
| 4 | 25OB0382CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING INCLUDING COVERED WALKWAY, STP AND ELECTRICAL FACILITIES AT MANDALUYONG COLLEGE OF SCIENCE AND TECHNOLOGY, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱14.6M | 92% | High risk93 | Flagged0.001 |
| 5 | 25FH0047BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING,BARANGAY SAN ISIDRO VILLAGE,VIRAC,CATANDUANES | Region V | Catanduanes DEO | On-Going | ₱4.4M | 83% | High risk88 | Flagged0.000 |
| 6 | 25FH0078ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION (COMPLETION) OF SEAWALL, COMAGAYCAY, SAN ANDRES, CATANDU | Region V | Catanduanes DEO | On-Going | ₱28M | 24% | High risk87 | —-0.002 |
| 7 | 25OB0025CONSTRUCTION OF MULTI-PURPOSE BUILDING AT RIZAL TECHNOLOGICAL UNIVERSITY LIBRARY, BARANGAY MALAMIG, MANDALUYONG CITY (PACKAGE 3) | National Capital Region | Metro Manila 1st DEO | On-Going | ₱95.1M | 0% | High risk63 | —-0.020 |
| 8 | 24OB0358CONSTRUCTION OF MULTI-PURPOSE BUILDING AT THE NATIONAL CENTER FOR MENTAL HEALTH (PACKAGE 6) DESIGNATED AS THE SENATE PRESIDENT NEPTALI A. GONZALES GENERAL HOSPITAL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱95.1M | 100% | High risk63 | —-0.080 |
| 9 | 24OB0357CONSTRUCTION OF MULTI-PURPOSE BUILDING AT THE NATIONAL CENTER FOR MENTAL HEALTH (PACKAGE 5) DESIGNATED AS THE SENATE PRESIDENT NEPTALI A. GONZALES GENERAL HOSPITAL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱95M | 100% | High risk63 | —-0.080 |
| 10 | 24OB0354CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (10-STOREY LIBRARY BUILDING, WITH BASEMENT) AT RIZAL TECHNOLOGICAL UNIVERSITY PACKAGE 2, MALAMIG, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱95.1M | 100% | High risk63 | —-0.082 |
| 11 | 24OB0353CONSTRUCTION (COMPLETION) OF MULTI- PURPOSE BUILDING (10-STOREY LIBRARY BUILDING, WITH BASEMENT) AT RIZAL TECHNOLOGICAL UNIVERSITY PACKAGE 1, MALAMIG, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱95.1M | 100% | High risk63 | —-0.082 |
| 12 | 22OB0046CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. WACK WACK, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱93.6M | 100% | High risk62 | —-0.080 |
| 13 | 23OB0015CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY WACK-WACK, PACKAGE 3, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱93.6M | 100% | High risk62 | —-0.083 |
| 14 | 23OB0392CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY WACK WACK PACKAGE 4, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱93.6M | 100% | High risk62 | —-0.083 |
| 15 | 23OB0393CONSTRUCTION OF MULTI PURPOSE BUILDING AT BARANGAY BAGONG SILANG, MANDALUYONG CITY, PHASE 1 | National Capital Region | Metro Manila 1st DEO | Completed | ₱93.6M | 100% | High risk62 | —-0.069 |
| 16 | 23OB0399CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY BAGONG SILANG, MANDALUYONG CITY, PHASE 2 | National Capital Region | Metro Manila 1st DEO | Completed | ₱93.6M | 100% | High risk62 | —-0.071 |
| 17 | 24OB0394CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY WACK WACK PACKAGE 5, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱96.9M | 100% | High risk62 | —-0.083 |
| 18 | 17OB0360CONSTRUCTION OF MANDALUYONG CITY JAIL, COMPLETION OF FACILITIES INCLUDING GROUND IMPROVEMENT, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱251.7M | 100% | High risk62 | —-0.020 |
| 19 | 23F00216CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF CATANDUANES PEOPLE'S CENTER IN VIRAC, CATANDUANES, VIRAC, CATANDUANES (LONE DISTRICT) | Region V | Region V | On-Going | ₱47.9M | 81% | Medium risk59 | —-0.042 |
| 20 | 23OB0397CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT) AT BARANGAY HULO, PACKAGE 1, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱80.8M | 100% | Medium risk58 | —-0.046 |
| 21 | 23OB0398CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT) AT BARANGAY HULO, PACKAGE 2, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱80.8M | 100% | Medium risk58 | —-0.046 |
| 22 | 23OB0387CONSTRUCTION OF MULTI-PURPOSE BUILDING AT THE NATIONAL CENTER FOR MENTAL HEALTH (PACKAGE 3) DESIGNATED AS THE SENATE PRESIDENT NEPTALI A. GONZALES GENERAL HOSPITAL, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱71.3M | 100% | Medium risk58 | —-0.091 |
| 23 | 25OB0022:CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY WACK-WACK, PACKAGE 6, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱78M | 83% | Medium risk58 | —-0.053 |
| 24 | 23OB0395CONSTRUCTION OF MULTI-PURPOSE BLDG. (VARIOUS OFFICES) IN BARANGAY MAUWAY, MANDALUYONG CITY (PHASE 1) | National Capital Region | Metro Manila 1st DEO | On-Going | ₱70.2M | 100% | Medium risk58 | —-0.053 |
| 25 | 23OB0396CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MAUWAY, MANDALUYONG CITY (PHASE 2) | National Capital Region | Metro Manila 1st DEO | On-Going | ₱70.2M | 100% | Medium risk58 | —-0.053 |