Contractor dossier
145 projects on file, including joint ventures this contractor is part of.
Total projects
145
Total budget
₱4.9B
Average progress
91.4%
Completion rate
74.5%
Average risk score
49.4
Medium risk on average, out of 100
Flagged as unusual
12
8.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 143 | ₱4.9B | 49.5 | 12 | 91.3% |
| Region X | 2 | ₱19.2M | 44.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 46 | ₱1.2B | 42.8 | 1 | 86.9% |
| Buildings and Facilities | 36 | ₱713M | 42.5 | 1 | 93.8% |
| Flood Control and Drainage | 23 | ₱1.8B | 55.8 | 1 | 95.5% |
| Bridges | 17 | ₱210.9M | 46.0 | 0 | 98.0% |
| OTHER | 12 | ₱410.8M | 69.0 | 3 | 93.7% |
| GAA 2025 SSP | 5 | ₱210.6M | 93.6 | 4 | 68.2% |
| Water Provision and Storage | 4 | ₱13.3M | 28.3 | 0 | 100.0% |
| GAA 2025 OO-2 | 2 | ₱423.5M | 93.2 | 2 | 76.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25H00094CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JUBAY RIVER, LILOAN, CEBU | Region VII | Region VII | On-Going | ₱97M | 97% | High risk96 | Flagged0.017 |
| 25HG0091CONSTRUCTION OF ROAD, BRGY. DAKIT TO BRGY. PANDAN LEADING TO FIRING RANGE AND NATURE PARK, BOGO CITY, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱48M | 81% | High risk95 | Flagged0.016 |
| 25HN0106SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF NANGKA-TUGBONGGAN ROAD WITH SLOPE PROTECTION SYSTEM (PACKAGE 1), CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱49M | 31% | High risk95 | Flagged0.029 |
| 25H00049OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER (UPSTREAM), LILOAN, CEBU | Region VII | Region VII | On-Going | ₱269.2M | 69% | High risk93 | Flagged0.020 |
| 25H00048OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER, PHASE 2, LILOAN, CEBU | Region VII | Region VII | On-Going | ₱154.3M | 84% | High risk93 | Flagged0.002 |
| 25HN0108SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD AT BARANGAY. PILIPOG, CORDOVA, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱11.7M | 33% | High risk93 | Flagged0.027 |
| 25HN0031SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -REHABILITATION OF ROAD WITH DRAINAGE FACILITIES, BARANGAY PANOYPOY, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | High risk89 | —-0.023 |
| 24H00158CONSTRUCTION/COMPLETION OF ACADEMIC BUILDINGS, CEBU TECHNOLOGICAL UNIVERSITY (CTU) - LILOAN CAMPUS, CEBU TECHNOLOGICAL UNIVERSITY | Region VII | Region VII | On-Going | ₱49.7M | 68% | High risk88 | Flagged0.062 |
| 24HN0228CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD, BARANGAY LAMAC, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.2M | 63% | High risk88 | Flagged0.058 |
| 24H00188CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER BRGY. CASUNTINGAN TO BRG. CABANCALAN (PHASE III | Region VII | Region VII | On-Going | ₱48.2M | 67% | High risk76 | Flagged0.047 |
| 23H00123OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAGATAYAM RIVER, SOGOD, CEBU | Region VII | Region VII | On-Going | ₱79.5M | 94% | High risk71 | Flagged0.004 |
| 23HN0099CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD WITH DRAINAGE FACILITIES, BRGY UMAPAD, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱98.9M | 100% | High risk70 | —-0.016 |
| 21HN0021LP - LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS - CONCRETING OF POLOG - PANOYPOY ROAD 3, INCLUDING DRAINAGE, CONNECTING TO CEBU NORTH HAGNAYA WHARF ROAD, POLOG & PANOYPOY, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱74.3M | 100% | High risk68 | —-0.027 |
| 25HI0018OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER (DOWNSTREAM), LILOAN, CEBU | Region VII | Cebu 5th DEO | On-Going | ₱144.7M | 73% | High risk67 | —-0.014 |
| 24HN0032OO2: -FLOOD MANAGEMENT PROGRAM - CONST./ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY POLOG TO BARANGAY PANOYPOY, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135.1M | 100% | High risk66 | —-0.019 |
| 25HN0090OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST. OF FLOOD MITIGATION RIVERBANK FACILITIES ALONG CANSAGA RIVER, PACKAGE I, GARING, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 89% | High risk66 | —-0.022 |
| 24HI0061CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER, COMPOSTELA, CEBU | Region VII | Cebu 5th DEO | Completed | ₱140.2M | 100% | High risk66 | —-0.056 |
| 21HI0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DANAO BRIDGE I, DANAO CITY, CEBU | Region VII | Cebu 5th DEO | Completed | ₱94.9M | 100% | High risk65 | —-0.061 |
| 23HN0063CSSP: BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD AT BARANGAY PILIPOG, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | High risk64 | —-0.034 |
| 25H00057OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG., CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE ALONG PANOYPOY RIVER LEADING TO SANITARY LANDFILL AND CRUSHING PLANT | Region VII | Region VII | On-Going | ₱96.4M | 69% | High risk64 | —-0.024 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24H00158CONSTRUCTION/COMPLETION OF ACADEMIC BUILDINGS, CEBU TECHNOLOGICAL UNIVERSITY (CTU) - LILOAN CAMPUS, CEBU TECHNOLOGICAL UNIVERSITY | Region VII | Region VII | On-Going | ₱49.7M | 68% | High risk88 | Flagged0.062 |
| 24HN0228CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD, BARANGAY LAMAC, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.2M | 63% | High risk88 | Flagged0.058 |
| 24H00188CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER BRGY. CASUNTINGAN TO BRG. CABANCALAN (PHASE III | Region VII | Region VII | On-Going | ₱48.2M | 67% | High risk76 | Flagged0.047 |
| 24HI0100CONSTRUCTION OF LILOAN CHILDRENS HOSPITAL, LILOAN, CEBU | Region VII | Cebu 5th DEO | On-Going | ₱35.8M | 0% | Medium risk47 | Flagged0.034 |
| 25HN0106SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF NANGKA-TUGBONGGAN ROAD WITH SLOPE PROTECTION SYSTEM (PACKAGE 1), CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱49M | 31% | High risk95 | Flagged0.029 |
| 25HN0108SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD AT BARANGAY. PILIPOG, CORDOVA, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱11.7M | 33% | High risk93 | Flagged0.027 |
| 25H00049OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER (UPSTREAM), LILOAN, CEBU | Region VII | Region VII | On-Going | ₱269.2M | 69% | High risk93 | Flagged0.020 |
| 25H00094CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JUBAY RIVER, LILOAN, CEBU | Region VII | Region VII | On-Going | ₱97M | 97% | High risk96 | Flagged0.017 |
| 25HG0091CONSTRUCTION OF ROAD, BRGY. DAKIT TO BRGY. PANDAN LEADING TO FIRING RANGE AND NATURE PARK, BOGO CITY, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱48M | 81% | High risk95 | Flagged0.016 |
| 23H00123OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAGATAYAM RIVER, SOGOD, CEBU | Region VII | Region VII | On-Going | ₱79.5M | 94% | High risk71 | Flagged0.004 |
| 25H00048OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER, PHASE 2, LILOAN, CEBU | Region VII | Region VII | On-Going | ₱154.3M | 84% | High risk93 | Flagged0.002 |
| 24HH0106CONCRETING OF SITIO LUTON BRGY. MABINI FMR, BRGY. MABINI, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱16.9M | 100% | Medium risk46 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 24HI0029CONSTRUCTION OF CONCRETE ROAD-POBLACION-DANASAN ROAD LEADING TO DANASAN ECO PARK, DANAO CITY, CEBU | Region VII | Cebu 5th DEO | Completed | ₱34.3M | 100% | Medium risk49 | —-0.095 |
| 52 | 23HI0001CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER, COMPOSTELA, CEBU | Region VII | Cebu 5th DEO | Completed | ₱48.9M | 100% | Medium risk49 | —-0.079 |
| 53 | 24HI0062CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAWO RIVER, SOGOD, CEBU | Region VII | Cebu 5th DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.078 |
| 54 | 23HI0003CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER, LILOAN, CEBU | Region VII | Cebu 5th DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.079 |
| 55 | 19HI0036CONSTRUCTION OF OTHER BUILDING - REHABILITATION/IMPROVEMENT OF DPWH CEBU 5TH DISTRICT ENGINEERING OFFICE (MULTI-PURPOSE BUILDING AND OTHER FACILITIES) INCLUDING SITE DEVELOPMENT, DANAO CITY, CEBU | Region VII | Cebu 5th DEO | Completed | ₱27.4M | 100% | Medium risk49 | —-0.091 |
| 56 | 18H00061CONSTRUCTION OF INNOVATION CENTER IN TESDA TECHNOLOGY INSTITUTIONS (TTIS) CENTER, TESDA COMPOUND, ARCHBISHOP REYES AVENUE, LAHUG, CEBU CITY | Region VII | Region VII | Completed | ₱39.8M | 100% | Medium risk49 | —-0.039 |
| 57 | 25HI0019CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, PORO, CEBU | Region VII | Cebu 5th DEO | On-Going | ₱48.9M | 97% | Medium risk49 | —-0.059 |
| 58 | 20HI0028CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. JUBAY, LILOAN, CEBU | Region VII | Cebu 5th DEO | Completed | ₱19.2M | 100% | Medium risk48 | —-0.084 |
| 59 | 24HH0077CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI-PURPOSE BUILDING, BRGY. SAMBAG 1, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱4.9M | 100% | Medium risk48 | —-0.052 |
| 60 | 24HH0023CONVERGENCE AND SPECIAL SUPPORT PROGRAM -BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MABINI, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.096 |
| 61 | 24HH0025CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY PIT-OS, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.096 |
| 62 | 25HH0055CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF DITA-GUBA BRIDGE, BARANGAY PUL | Region VII | Cebu City DEO | On-Going | ₱29.4M | 67% | Medium risk48 | —-0.017 |
| 63 | 18HN0017RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES - OUANO BR. 2 (B00615CB) ALONG MANDAUE CAUSWAY (OUANO AVE), MANDAUE CITY | Region VII | Cebu 6th DEO | Completed | ₱4.8M | 100% | Medium risk48 | —-0.061 |
| 64 | 24HI0081CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BRGY. PUERTOBELLO, TUDELA, CAMOTES ISLANDS, CEBU | Region VII | Cebu 5th DEO | Completed | ₱29.7M | 100% | Medium risk48 | —-0.089 |
| 65 | 23HN0041CSSP: BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES -CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) AT BARANGAY IBABAO, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.096 |
| 66 | 25HN0048SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY IBABAO, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱7.9M | 100% | Medium risk48 | —-0.095 |
| 67 | 20HI0075CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. JUBAY, LILOAN, CEBU | Region VII | Cebu 5th DEO | Completed | ₱9.6M | 100% | Medium risk48 | —-0.093 |
| 68 | 18HN0016RETROFITTING / STRENGTHENING OF PERMANENT BRIDGES - OUANO BR.1(B00616CB) ALONG MANDAUE CAUSEWAY (OUANO AVE), MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.061 |
| 69 | 24HN0126CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY IBABAO, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱5.9M | 100% | Medium risk48 | —-0.096 |
| 70 | 25HN0020SSP: BASIC INFRASTRUTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (PHASE VI), BARANGAY IBABAO, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱6.9M | 100% | Medium risk48 | —-0.096 |
| 71 | 22HI0066CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) TAYTAY, DANAO CITY, CEBU | Region VII | Cebu 5th DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.094 |
| 72 | 19HH0018001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES, IMUS BRIDGE. 2 (B00406CB) ALONG IMUS RD., CEBU CITY | Region VII | Cebu City DEO | Completed | ₱6.1M | 100% | Medium risk48 | —-0.060 |
| 73 | 19HH0017001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES, IMUS BRIDGE 1 (B00404CB) ALONG IMUS RD., CEBU CITY | Region VII | Cebu City DEO | Completed | ₱5.8M | 100% | Medium risk48 | —-0.060 |
| 74 | 24HN0175CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - REHABILITATION OF WATER SYSTEM, BARANGAY COGON, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.061 |
| 75 | 21HH0036OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES - CANDUMAN BR. (B000401CB) ALONG GOV. CUENCO AVE., CEBU CITY | Region VII | Cebu City DEO | Completed | ₱14M | 100% | Medium risk47 | —-0.060 |