Contractor dossier
145 projects on file, including joint ventures this contractor is part of.
Total projects
145
Total budget
₱4.9B
Average progress
91.4%
Completion rate
74.5%
Average risk score
49.4
Medium risk on average, out of 100
Flagged as unusual
12
8.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 143 | ₱4.9B | 49.5 | 12 | 91.3% |
| Region X | 2 | ₱19.2M | 44.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 46 | ₱1.2B | 42.8 | 1 | 86.9% |
| Buildings and Facilities | 36 | ₱713M | 42.5 | 1 | 93.8% |
| Flood Control and Drainage | 23 | ₱1.8B | 55.8 | 1 | 95.5% |
| Bridges | 17 | ₱210.9M | 46.0 | 0 | 98.0% |
| OTHER | 12 | ₱410.8M | 69.0 | 3 | 93.7% |
| GAA 2025 SSP | 5 | ₱210.6M | 93.6 | 4 | 68.2% |
| Water Provision and Storage | 4 | ₱13.3M | 28.3 | 0 | 100.0% |
| GAA 2025 OO-2 | 2 | ₱423.5M | 93.2 | 2 | 76.6% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25H00094CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JUBAY RIVER, LILOAN, CEBU | Region VII | Region VII | On-Going | ₱97M | 97% | High risk96 | Flagged0.017 |
| 25HG0091CONSTRUCTION OF ROAD, BRGY. DAKIT TO BRGY. PANDAN LEADING TO FIRING RANGE AND NATURE PARK, BOGO CITY, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱48M | 81% | High risk95 | Flagged0.016 |
| 25HN0106SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF NANGKA-TUGBONGGAN ROAD WITH SLOPE PROTECTION SYSTEM (PACKAGE 1), CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱49M | 31% | High risk95 | Flagged0.029 |
| 25H00049OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER (UPSTREAM), LILOAN, CEBU | Region VII | Region VII | On-Going | ₱269.2M | 69% | High risk93 | Flagged0.020 |
| 25H00048OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER, PHASE 2, LILOAN, CEBU | Region VII | Region VII | On-Going | ₱154.3M | 84% | High risk93 | Flagged0.002 |
| 25HN0108SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD AT BARANGAY. PILIPOG, CORDOVA, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱11.7M | 33% | High risk93 | Flagged0.027 |
| 25HN0031SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -REHABILITATION OF ROAD WITH DRAINAGE FACILITIES, BARANGAY PANOYPOY, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | High risk89 | —-0.023 |
| 24H00158CONSTRUCTION/COMPLETION OF ACADEMIC BUILDINGS, CEBU TECHNOLOGICAL UNIVERSITY (CTU) - LILOAN CAMPUS, CEBU TECHNOLOGICAL UNIVERSITY | Region VII | Region VII | On-Going | ₱49.7M | 68% | High risk88 | Flagged0.062 |
| 24HN0228CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD, BARANGAY LAMAC, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.2M | 63% | High risk88 | Flagged0.058 |
| 24H00188CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER BRGY. CASUNTINGAN TO BRG. CABANCALAN (PHASE III | Region VII | Region VII | On-Going | ₱48.2M | 67% | High risk76 | Flagged0.047 |
| 23H00123OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAGATAYAM RIVER, SOGOD, CEBU | Region VII | Region VII | On-Going | ₱79.5M | 94% | High risk71 | Flagged0.004 |
| 23HN0099CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD WITH DRAINAGE FACILITIES, BRGY UMAPAD, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱98.9M | 100% | High risk70 | —-0.016 |
| 21HN0021LP - LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS - CONCRETING OF POLOG - PANOYPOY ROAD 3, INCLUDING DRAINAGE, CONNECTING TO CEBU NORTH HAGNAYA WHARF ROAD, POLOG & PANOYPOY, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱74.3M | 100% | High risk68 | —-0.027 |
| 25HI0018OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER (DOWNSTREAM), LILOAN, CEBU | Region VII | Cebu 5th DEO | On-Going | ₱144.7M | 73% | High risk67 | —-0.014 |
| 24HN0032OO2: -FLOOD MANAGEMENT PROGRAM - CONST./ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST. OF FLOOD CONTROL STRUCTURE ALONG CANSAGA RIVER, BARANGAY POLOG TO BARANGAY PANOYPOY, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135.1M | 100% | High risk66 | —-0.019 |
| 25HN0090OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONST. OF FLOOD MITIGATION RIVERBANK FACILITIES ALONG CANSAGA RIVER, PACKAGE I, GARING, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 89% | High risk66 | —-0.022 |
| 24HI0061CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER, COMPOSTELA, CEBU | Region VII | Cebu 5th DEO | Completed | ₱140.2M | 100% | High risk66 | —-0.056 |
| 21HI0009CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DANAO BRIDGE I, DANAO CITY, CEBU | Region VII | Cebu 5th DEO | Completed | ₱94.9M | 100% | High risk65 | —-0.061 |
| 23HN0063CSSP: BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD AT BARANGAY PILIPOG, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | High risk64 | —-0.034 |
| 25H00057OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG., CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE ALONG PANOYPOY RIVER LEADING TO SANITARY LANDFILL AND CRUSHING PLANT | Region VII | Region VII | On-Going | ₱96.4M | 69% | High risk64 | —-0.024 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24H00158CONSTRUCTION/COMPLETION OF ACADEMIC BUILDINGS, CEBU TECHNOLOGICAL UNIVERSITY (CTU) - LILOAN CAMPUS, CEBU TECHNOLOGICAL UNIVERSITY | Region VII | Region VII | On-Going | ₱49.7M | 68% | High risk88 | Flagged0.062 |
| 24HN0228CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD, BARANGAY LAMAC, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.2M | 63% | High risk88 | Flagged0.058 |
| 24H00188CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONST. OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER BRGY. CASUNTINGAN TO BRG. CABANCALAN (PHASE III | Region VII | Region VII | On-Going | ₱48.2M | 67% | High risk76 | Flagged0.047 |
| 24HI0100CONSTRUCTION OF LILOAN CHILDRENS HOSPITAL, LILOAN, CEBU | Region VII | Cebu 5th DEO | On-Going | ₱35.8M | 0% | Medium risk47 | Flagged0.034 |
| 25HN0106SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF NANGKA-TUGBONGGAN ROAD WITH SLOPE PROTECTION SYSTEM (PACKAGE 1), CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱49M | 31% | High risk95 | Flagged0.029 |
| 25HN0108SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD AT BARANGAY. PILIPOG, CORDOVA, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱11.7M | 33% | High risk93 | Flagged0.027 |
| 25H00049OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER (UPSTREAM), LILOAN, CEBU | Region VII | Region VII | On-Going | ₱269.2M | 69% | High risk93 | Flagged0.020 |
| 25H00094CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JUBAY RIVER, LILOAN, CEBU | Region VII | Region VII | On-Going | ₱97M | 97% | High risk96 | Flagged0.017 |
| 25HG0091CONSTRUCTION OF ROAD, BRGY. DAKIT TO BRGY. PANDAN LEADING TO FIRING RANGE AND NATURE PARK, BOGO CITY, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱48M | 81% | High risk95 | Flagged0.016 |
| 23H00123OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAGATAYAM RIVER, SOGOD, CEBU | Region VII | Region VII | On-Going | ₱79.5M | 94% | High risk71 | Flagged0.004 |
| 25H00048OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER, PHASE 2, LILOAN, CEBU | Region VII | Region VII | On-Going | ₱154.3M | 84% | High risk93 | Flagged0.002 |
| 24HH0106CONCRETING OF SITIO LUTON BRGY. MABINI FMR, BRGY. MABINI, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱16.9M | 100% | Medium risk46 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 19HI0067CONCRETING OF BRGY. PANALIPAN FMR, BRGY. PANALIPAN, CATMON, CEBU | Region VII | Cebu 5th DEO | Completed | ₱4.7M | 100% | Medium risk36 | —-0.042 |
| 127 | 16HN0130REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGE - PILIPOG BR.1 (B00580CB) ALONG MACTAN CIRCUMFERENTIAL ROAD, PILIPOG, CORDOVA | Region VII | Cebu 6th DEO | Completed | ₱2.2M | 100% | Low risk23 | —-0.006 |
| 128 | 21HI0141CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTOR SYSTEM 1. STA. CRUZ ES, LILOAN 2. CALERO IS, LILOAN 3. CATARMAN IS, LILOAN 4. CARMEN NHS 5. PEDRO ERONG ES, CARMEN 6. TINABYONAN NHS, CATMON 7. SOGOD CES 8. DPWH CEBU 5TH | Region VII | Cebu 5th DEO | Completed | ₱4.4M | 100% | Low risk23 | —-0.060 |
| 129 | 19HH0161OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURES AT BRGY. KINASANG-AN, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱4.7M | 100% | Low risk23 | —-0.077 |
| 130 | 18HN0027REHABILITATION/IMPROVEMENT OF ROAD, BRGY. GABI, CORDOVA | Region VII | Cebu 6th DEO | Completed | ₱3.6M | 100% | Low risk22 | —-0.096 |
| 131 | 21HN0060LP -LOCAL INFRASTRUCTURE PROGRAM -LOCAL ROADS AND BRIDGES-LOCAL ROADS-ROAD CONCRETING YLAYA TO CENTRO, BARANGAY IBABAO, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱2.8M | 100% | Low risk22 | —-0.096 |
| 132 | 20HI0040CONSTRUCTION OF WATER SYSTEM, LEVEL II, BRGY. DAPDAP, COMPOSTELA, CEBU | Region VII | Cebu 5th DEO | Completed | ₱2M | 100% | Low risk22 | —-0.060 |
| 133 | 20HI0049CONSTRUCTION OF WATER SYSTEM, LEVEL II, BRGY. TAGUBI, COMPOSTELA, CEBU | Region VII | Cebu 5th DEO | Completed | ₱2M | 100% | Low risk21 | —-0.062 |
| 134 | 21HI0018CONSTRUCTION OF CONCRETE ROAD - BARANGAY ROAD ALONG SABANG IN SUPPORT OF MITSUMI AND REPUBLIC CEMENT, DANAO CITY, CEBU | Region VII | Cebu 5th DEO | Completed | ₱2M | 100% | Low risk20 | —-0.092 |
| 135 | 19HN0034LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE FACILITIES -CONSTRUCTION OF MULTI-PURPOSE BUILDING- CONSTRUCTION OF MULTI-PURPOSE BUILDING(COVERED COURT), BRGY. DAY-AS, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱2.9M | 100% | Low risk19 | —-0.096 |
| 136 | 21HN0007LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL-PHASE II), BARANGAY IBABAO, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱3M | 100% | Low risk19 | —-0.088 |
| 137 | 20HN0101LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. IBABAO, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱2.9M | 100% | Low risk19 | —-0.096 |
| 138 | 18HI0053CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. LOBO, SOGOD, CEBU | Region VII | Cebu 5th DEO | Completed | ₱2.4M | 100% | Low risk19 | —-0.095 |
| 139 | 18HD0095CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY DON VIRGILIO GONZALES, MEDILLIN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱2.8M | 100% | Low risk19 | —-0.093 |
| 140 | 18HI0042CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CABALAWAN, SOGOD, CEBU | Region VII | Cebu 5th DEO | Completed | ₱2.3M | 100% | Low risk19 | —-0.095 |
| 141 | 20HI0035AMANCION ROAD OPENING, BRGY. AMANCION, CATMON, CEBU | Region VII | Cebu 5th DEO | Completed | ₱1.9M | 100% | Low risk17 | —-0.092 |
| 142 | 21HN0036LP - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - ROAD CONCRETING, PUROK 7,BARANGAY SAN MIGUEL, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱1.9M | 100% | Low risk17 | —-0.093 |
| 143 | 21HN0035LP - LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - ROAD CONCRETING, BARANGAY PILIPOG, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱1.9M | 100% | Low risk17 | —-0.093 |
| 144 | 21HN0034LP -LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS -ROAD CONCRETING, PUROK CALAN 2, BARANGAY POBLACION, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱1.9M | 100% | Low risk17 | —-0.093 |
| 145 | 19HH0123LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURE - MULTI PURPOSE / FACILITIES - REHABILITATION OF MULTI - PURPOSE BUILDING, BRGY. TALAMBAN, CEBU CITY, CEBU | Region VII | Cebu City DEO | Completed | ₱1.9M | 100% | Low risk14 | —-0.096 |