Contractor dossier
525 projects on file, including joint ventures this contractor is part of.
Total projects
525
Total budget
₱27.9B
Average progress
87.5%
Completion rate
62.1%
Below 70%
Average risk score
55.9
Medium risk on average, out of 100
Flagged as unusual
49
9.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 464 | ₱22.2B | 54.7 | 34 | 91.2% |
| Region V | 53 | ₱5.3B | 67.0 | 15 | 54.4% |
| Region IV-B | 4 | ₱80.9M | 36.5 | 0 | 100.0% |
| Region III | 3 | ₱260.4M | 76.7 | 0 | 85.2% |
| National Capital Region | 1 | ₱112M | 60.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 259 | ₱15.9B | 53.8 | 6 | 91.2% |
| Buildings and Facilities | 98 | ₱1.5B | 43.2 | 1 | 97.2% |
| Flood Control and Drainage | 62 | ₱4.5B | 56.5 | 6 | 80.8% |
| GAA 2025 OO-1 | 27 | ₱2.3B | 95.2 | 11 | 71.3% |
| Bridges | 25 | ₱995.1M | 51.0 | 4 | 70.0% |
| Water Provision and Storage | 22 | ₱661.7M | 52.1 | 1 | 89.9% |
| OTHER | 19 | ₱1.5B | 79.2 | 15 | 66.8% |
| GAA 2025 SSP | 12 | ₱392.7M | 94.3 | 5 | 71.4% |
| Bridges, Roads | 1 | ₱117M | 70.6 | 0 | 29.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25FC0023CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CABUSAY, LABO CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱140.4M | 69% | High risk96 | Flagged0.021 |
| 25FC0076CONSTRUCTION OF ROAD AT BARANGAY BAGONG SILANG III, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱48M | 18% | High risk96 | Flagged0.019 |
| 25DL0130ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE- TERTIARY ROADS, MSR JCT LOPEZ-CATANAUAN RD., K0233+745-K0235+200, K0235+350-K0236+128, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱93.1M | 72% | High risk96 | Flagged0.001 |
| 25DM0145ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN. NARCISO RD - K0259 + 000 - K0252 + 500, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 71% | High risk96 | Flagged0.003 |
| 25DM0112ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MULANAY- SAN FRANCISCO RD K0302+000-K0303+000, K0305+000-K0306+387,K0307+000 K0308+000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.7M | 91% | High risk96 | —-0.004 |
| 25DM0084ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - GUMACA-PITOGO-MULANAY-SN. NARCISO RD., K0299 + 000 - K0301 + 562, K0302 + 000 - K0303 + 000, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 91% | High risk96 | —-0.004 |
| 25DM0119ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0351 + 000 - K0352 + 998 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 93% | High risk96 | —-0.005 |
| 25DM0083ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0397 + 120 - K0399 + 200, K0400 + 450 - K0401 + 800 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 94% | High risk96 | —-0.005 |
| 25DM0098ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GUMACA-PITOGO-MULANAY- SAN NARCISO RD - K0266+277 - K0270 + 000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 32% | High risk96 | Flagged0.012 |
| 25DM0099ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GUMACA-PITOGO-MULANAY- SN NARCISO RD - K0253 + 363 - K0255 + 052, K0262 + 180 - K0263 + 788 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 72% | High risk96 | Flagged0.002 |
| 25DM0096ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE -SECONDARY ROADS - GUMACA-PITOGO-MULANAY- SAN NARCISO RD - K0237+789-K0240+129, K0245+000-K0246+000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 81% | High risk96 | —-0.002 |
| 25DM0101ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MULANAY - SAN FRANCISCO RD - K0296 + 431 - K0299 + 882 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 90% | High risk96 | —-0.004 |
| 25DM0097ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GUMACA- PITOGO-MULANAY-SN NARCISO RD - K0297 + 342 - K0301 + 000 | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.6M | 92% | High risk96 | —-0.004 |
| 25FC0083CONSTRUCTION OF ROAD AT BARANGAY BAGONG SILANG I, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱48M | 1% | High risk96 | Flagged0.024 |
| 25DL0168ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - TERTIARY ROADS, QUEZON-ALABAT-PEREZ RD - K0040+463 - K0043+000 | Region IV-A | Quezon 4th DEO | On-Going | ₱93.3M | 76% | High risk96 | —-0.002 |
| 25DL0167ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - TERTIARY ROADS, QUEZON-ALABAT-PEREZ RD - K0032+898 - K0033+348, K0033+411 - K0033+892, K0034+000 - K0034+162, K0034+391 - K0034+ | Region IV-A | Quezon 4th DEO | On-Going | ₱93.5M | 76% | High risk96 | —-0.002 |
| 25DL0128ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - SECONDARY ROADS, LOPEZ BYPASS ROAD, K0216+(-)955 - K0216+(-)321 LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱93.6M | 71% | High risk96 | Flagged0.001 |
| 25DL0129ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - SECONDARY ROADS, LOPEZ BYPASS RD - K0216+000 - K0217+000 | Region IV-A | Quezon 4th DEO | On-Going | ₱93.4M | 74% | High risk96 | Flagged0.001 |
| 25DL0166ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - TERTIARY ROADS, QUEZON-ALABAT-PEREZ RD - K0001+ (-992) - K0001+000, K0001+443 - K0001+855, K0002+000 - K0002+347, K0002+350 - K0 | Region IV-A | Quezon 4th DEO | On-Going | ₱93.2M | 76% | High risk96 | —-0.001 |
| 25DL0131ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - SECONDARY ROADS, GUMACA BYPASS ROAD, K0201+342-K0203+107, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱93.6M | 79% | High risk96 | —-0.001 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DJ0209OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE-SECONDARY ROADS, LUCENA-DALAHICAN PORT RD - K0134+009 - K0134+446 | Region IV-A | Quezon 2nd DEO | On-Going | ₱35.7M | 0% | High risk87 | Flagged0.064 |
| 24DJ0157CONSTRUCTION OF 4STY12CL, LUCENA DALAHICAN NATIONAL HIGH SCHOOL - BARRA ANNEX, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱48.2M | 46% | High risk88 | Flagged0.056 |
| 24DJ0212OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM -PREVENTIVE MAINTENANCE -SECONDARY ROADS, QUEZON - BATANGAS RD - K0099+ 146 - K0101+240 | Region IV-A | Quezon 2nd DEO | On-Going | ₱81.1M | 95% | High risk87 | Flagged0.045 |
| 24DJ0228OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE- SECONDARY ROADS, SARIAYA BYPASS RD- K0124+467-K0125+086, K0125+125-K0125+400 | Region IV-A | Quezon 2nd DEO | On-Going | ₱77.2M | 93% | High risk88 | Flagged0.044 |
| 24FC0079CONSTRUCTION OF FLOOD CONTROL AT BRGY. MABILO I - MABILO II (LABO RIVER) LABO, CAMARINES NORTE (PACKAGE 5), BRGY. MABILO I, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱140.4M | 26% | High risk79 | Flagged0.041 |
| 24FC0078CONSTRUCTION OF FLOOD CONTROL AT BRGY. MABILO I - MABILO II (LABO RIVER) LABO, CAMARINES NORTE (PACKAGE 4), BRGY. MABILO I - BRGY. MABILO II, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱140.4M | 26% | High risk79 | Flagged0.041 |
| 24F00497ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-LIGAO-PIO DURAN RD-K0521+225-K0521+300, K0522+080-K0522+180, K0523+145-K0523 | Region V | Region V | On-Going | ₱158.3M | 60% | High risk74 | Flagged0.041 |
| 24DD0296CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BRIDGE INCLUDING APPROACH | Region IV-A | Batangas 4th DEO | On-Going | ₱93.6M | 46% | High risk67 | Flagged0.041 |
| 24D00245CONCRETING OF TABASON - STO. TOMAS - SAN VICENTE FMR, BRGYS. TABASON, STO. TOMAS, AND SAN VICENTE, TAGKAWAYAN, QUEZON | Region IV-A | Region IV-A | On-Going | ₱19.8M | 76% | High risk86 | Flagged0.039 |
| 24DJ0214OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, SN JUAN - CANDELARIA JCT - CANDELARIA - BOLBOC RD - K0155+815 - K0156+313 | Region IV-A | Quezon 2nd DEO | On-Going | ₱37.6M | 92% | High risk86 | Flagged0.039 |
| 24D00070CONSTRUCTION OF BY-PASS AND DIVERSION ROADS TAGKAWAYAN-LABO DIVERSION ROAD, (TAGKAWAYAN SECTION), QUEZON | Region IV-A | Region IV-A | On-Going | ₱280.4M | 66% | High risk79 | Flagged0.030 |
| 24FC0076CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIGON RIVER AT MATANLANG-MABILO II, LABO, CAMARINES NORTE (PHASE 5), BRGY. MATANLANG, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱144.7M | 74% | High risk79 | Flagged0.030 |
| 24FC0077CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUSIGON RIVER AT MATANLANG-MABILO II, LABO, CAMARINES NORTE (PHASE 6), BRGY. MATANLANG, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱144.7M | 76% | High risk79 | Flagged0.028 |
| 24D00077CONSTRUCTION OF BY-PASS AND DIVERSION ROADSLIPA CITY-PADRE GARCIA DIVERSION ROAD, PACKAGE M, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱190.1M | 55% | High risk77 | Flagged0.026 |
| 25FC0083CONSTRUCTION OF ROAD AT BARANGAY BAGONG SILANG I, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱48M | 1% | High risk96 | Flagged0.024 |
| 24F00488ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-ALBAY WEST COAST RD-K0511+906-K0512+390, LIBON, ALBAY (3RD LEGISLATIVE DISTR | Region V | Region V | On-Going | ₱232.8M | 64% | High risk77 | Flagged0.023 |
| 24F00487CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-REHABILITATION OF MULTI-PURPOSE BUILDING (CAMARINES NORTE AGRO MULTI-PURPOSE COMPLEX CUM EVACUATION CENTER), BARAN | Region V | Region V | On-Going | ₱99M | 31% | High risk67 | Flagged0.021 |
| 25FC0023CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CABUSAY, LABO CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱140.4M | 69% | High risk96 | Flagged0.021 |
| 25FC0076CONSTRUCTION OF ROAD AT BARANGAY BAGONG SILANG III, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱48M | 18% | High risk96 | Flagged0.019 |
| 24D00158CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMOHAGUIN RIVER, GUMACA, QUEZON | Region IV-A | Region IV-A | On-Going | ₱48.3M | 14% | High risk76 | Flagged0.019 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 376 | 24DM0106ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - ASPHALT OVERLAY TALABA - SUMMIT -PANAON RD, UNISAN, QUEZON (PHASE 2), UNISAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.101 |
| 377 | 22DM0026NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - AGDANGAN BY-PASS ROAD, QUEZONAGDANGAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱40.2M | 100% | Medium risk47 | —-0.101 |
| 378 | 24DM0105ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - ASPHALT OVERLAY TALABA - SUMMIT -PANAON RD, UNISAN, QUEZON (PHASE 1), UNISAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.102 |
| 379 | 21DM0033NETWORK DEVELOPMENT: OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - P BURGOS - POTOTANIN JCT. K0168+000 - K0170+010PADRE BURGOS, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱39.5M | 100% | Medium risk47 | —-0.103 |
| 380 | 21DM0005NETWORK DEVELOPMENT: OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADSP BURGOS-POTOTANIN JCT - K0171+000 -K0173+267PADRE BURGOS, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱44.1M | 100% | Medium risk47 | —-0.104 |
| 381 | 18DM0041CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - TALABA - SUMMIT - PANAON RD - K0188+(-)239 - K0188+995, K0188+(-)255 - K0188+(-)250, BRGY. SOCORRO, UNISAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱29.1M | 100% | Medium risk47 | —-0.106 |
| 382 | 24DM0120ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - ASPHALT OVERLAY MSR JCT-LOPEZ-CATANAUAN ROAD - K0240 + 000 - K0243 + 700, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.102 |
| 383 | 19DM0070CONSTRUCTION/REHABILITATION OF BUSDAK - KULONG-KULONG, SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱34.3M | 100% | Medium risk47 | —-0.102 |
| 384 | 22DM0014ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0318 + 885 - K0319 + 011 SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.103 |
| 385 | 18DM0032PREVENTIVE MAINTENANCE OF ROAD: CONCRETE REBLOCKING - MULANAY - SN FRANCISCO RD - K0308+000 - K0309+000, K0309+070 - K0311+850, SAN FRANCISCO SECTION | Region IV-A | Quezon 3rd DEO | Completed | ₱35.3M | 100% | Medium risk47 | —-0.103 |
| 386 | 22DM0013ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - GUMACA-PITOGO-MULANAY-SN NARCISO RD - K0240 + 300 - K0240 + 900, K0276 + 000 - K0277 + 000MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.104 |
| 387 | 18DM0071CONSTRUCTION OF MULTI-PURPOSE LIVELIHOOD TRAINING CENTER , BUENAVISTA QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱9.5M | 100% | Medium risk47 | —-0.101 |
| 388 | 23DJ0102CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY BIGNAY 1, SARIAYA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.106 |
| 389 | 21DJ0090LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE/FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. DOMOIT, LUCENA CITY, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.105 |
| 390 | 23DJ0107CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), VILLA CONSUELO SUBDIVISION, BARANGAY IBABANG DUPAY, LUC | Region IV-A | Quezon 2nd DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.106 |
| 391 | 20DJ0030OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SLOPE PROTECTION ALONG QUIAPO RIVER, BRGY. PAHINGA NORTE, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱44.1M | 100% | Medium risk47 | —-0.083 |
| 392 | 20DJ0057OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF IYAM RIVER FLOOD CONTROL/SERVICE ROAD, BRGY. 1 TO BRGY. 3, LUCENA CITY | Region IV-A | Quezon 2nd DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.084 |
| 393 | 25DJ0024CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY BUKAL NORTE, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.8M | 100% | Medium risk46 | —-0.079 |
| 394 | 24DJ0106CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BRGY. MASALUKOT I, CANDELARIA, QUEZON PROVINC | Region IV-A | Quezon 2nd DEO | On-Going | ₱4.8M | 89% | Medium risk46 | —-0.067 |
| 395 | 20DJ0014OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF REVETMENT WALL ALONG DUMACAA RIVER, LUCENA CITY, Q | Region IV-A | Quezon 2nd DEO | Completed | ₱7.8M | 100% | Medium risk46 | —-0.089 |
| 396 | 24DJ0089OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF LAGNAS RIS WATER MANAGEMENT FLOOD CONTROL PROJECT OF LAGNAS RIVER, TIAONG, QUEZ | Region IV-A | Quezon 2nd DEO | On-Going | ₱19.1M | 76% | Medium risk46 | —-0.039 |
| 397 | 18DM0051CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG HINGOSO RIVER, SAN ISIDRO IBABA - SAN VICENTE SECTION, GENERAL LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | Terminated | ₱33.6M | 0% | Medium risk46 | —-0.021 |
| 398 | 18DM0049CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CATANAUAN RIVER (DOWNSTREAM SECTION), CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱38.7M | 100% | Medium risk46 | —-0.077 |
| 399 | 22DM0064CONSTRUCTION OF SEAWALL IN BRGY. F. DE JESUS, UNISAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱44.2M | 100% | Medium risk46 | —-0.082 |
| 400 | 23DL0099ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASIN AND PRINCIPAL RIVERS 3. REHABILITATION OF FLOOD CONTROL ALONG PANDAN | Region IV-A | Quezon 4th DEO | Completed | ₱44.1M | 100% | Medium risk46 | —-0.084 |