Contractor dossier
40 projects on file, including joint ventures this contractor is part of.
Total projects
40
Total budget
₱3.5B
Average progress
80.0%
Completion rate
50.0%
Below 70%
Average risk score
66.4
High risk on average, out of 100
Flagged as unusual
4
10.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 38 | ₱3.1B | 66.2 | 4 | 79.0% |
| Region XII | 1 | ₱173.4M | 70.2 | 0 | 100.0% |
| Central Office | 1 | ₱189M | 70.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 20 | ₱1.8B | 66.3 | 2 | 82.6% |
| Flood Control and Drainage | 12 | ₱1.2B | 66.5 | 0 | 83.6% |
| Buildings and Facilities | 5 | ₱189.2M | 64.2 | 0 | 68.2% |
| OTHER | 2 | ₱225.6M | 74.6 | 1 | 94.1% |
| Water Provision and Storage | 1 | ₱47.4M | 62.7 | 1 | 16.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19F00075CONSTRUCTION OF DPWH REGIONAL OFFICE V-PHASE I, RES COMPOUND, AIRPORT ROAD, LEGAZPI CITY | Region V | Region V | On-Going | ₱52.2M | 88% | High risk79 | Flagged0.024 |
| 19F00147ASPHALT OVERLAY OF PORTIONS OF LIGAO POBLACION ROAD AND DAANG MAHARLIKA POLANGUI SECTION, LIGAO AND POLANGUI, ALBAY, LIGAO AND POLANGUI, ALBAY 3RD LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱102.9M | 87% | High risk76 | Flagged0.030 |
| 24F00448ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF NASISI RIVER FLOOD MITIGATION STRUCTURE, BRGY. BASAG, LIGAO C | Region V | Region V | On-Going | ₱187.6M | 89% | High risk74 | —-0.025 |
| 25F00017ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MAHARLIKA HIGHWAY (MORMS-BUCAF-SECTION), GUINOBATAN, ALBAY, GUINOBATAN, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱141.1M | 0% | High risk74 | Flagged0.003 |
| 18F00052OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL DIKES IN GUINOBATAN, ALBAY FOR CRITICAL SECTIONS OF | Region V | Region V | Completed | ₱144.7M | 100% | High risk73 | —-0.066 |
| 23F00364ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR-ALBAY DIVERSION ROAD, PACKAGE 2, ALBAY, OAS, ALBAY(3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱214.2M | 37% | High risk73 | —-0.017 |
| 16F00091BICOL RIVER BASIN WATERSHED MANAGEMENT PROJECT (FLOOD MITIGATION COMPONENT) - GUINOBATAN AND LIGAO FLOOD CONTROL, ALBAY 3RD LD | Region V | Region V | Completed | ₱193M | 100% | High risk73 | —-0.024 |
| 20F00019OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS, LIGAO-PIODURAN ROAD - K0501+(-017.00)-K0502+617.30, K0503+187.00-K0503+917.00, K0504+430.00-K0504+670.00, K0505+580.00-K0506+384.00, LIG | Region V | Region V | On-Going | ₱122.7M | 99% | High risk72 | —-0.003 |
| 20F00039OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF QUIRANGAY FLOOD CONTROL SYSTEM, QUIRANGAY, CAMALIG, ALBAY, CAMALIG, | Region V | Region V | Completed | ₱112.2M | 100% | High risk71 | —-0.070 |
| 24FO0017ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MANINILA RIVER (BRGY.MANINILA - BRGY. MASARAWAG) FLOOD | Region V | Albay 3rd DEO | Completed | ₱102.3M | 100% | High risk71 | —-0.076 |
| 25F00230CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-PREVENTIVE MAINTENANCE-PRIMARY ROADS ALONG MAHARLIKA HIGHWAY-K0481+(-680)-K0481+(-497), K0490+437-K0491+098, POLANGUI, ALBAY (3RD LEGISLATIVE DI | Region V | Region V | On-Going | ₱68.1M | 2% | High risk70 | —-0.011 |
| 17M00025ROAD WIDENING OF DIGOS-MAKAR ROAD, K1598+778 K1601+545; K1601+566 K1601+694; K1602+08 -K1605+376, MALUNGON, SARANGANI | Region XII | Region XII | Completed | ₱173.4M | 100% | High risk70 | —-0.006 |
| 17F00085PREVENTIVE MAINTENANCE-ASPHALT OVERLAY OF LIBON-PANTAO-PIODURAN ROAD SECTION ALONG ALBAY WEST COAST ROAD, LIBON, ALBAY PROVINCE | Central Office | Roads Management Cluster I (Bilateral) | Completed | ₱189M | 100% | High risk70 | —-0.062 |
| 24F00078ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-DAANG MAHARLIKA (LZ)-K0494+000-K0496+571, OAS, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱99.2M | 52% | High risk69 | —-0.049 |
| 17FA0021CLUSTER 11- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: REHABILITATION/CONSTRUCTION/EXTENSION OF SEAWALL AT SAN LORENZO, SALVACION AND TAYHI, TABACO CITY, ALBAY 1ST LD | Region V | Albay 1st DEO | Completed | ₱96.5M | 100% | High risk68 | —-0.047 |
| 20FA0011REHABILITATION OF SAN VICENTE FLOOD CONTROL, TABACO CITY, ALBAY | Region V | Albay 1st DEO | Completed | ₱93.3M | 100% | High risk68 | —-0.077 |
| 17FA0015CLUSTER 5- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROAD LIGAO-TABACO ROAD-K0518+410-K0519+065,K0524+200-K0525+100;DM JCT.- LEGAZPI-STO. DOMINGO-TABACO-CAM. SUR BDRY. ROAD-K0574+140-K0575+686 AND K0579+400-K0581+150 | Region V | Albay 1st DEO | Completed | ₱92.9M | 100% | High risk68 | —-0.057 |
| 20F00115LOCAL PROGRAM:NATIONAL ROADS AND BRIDGES-NATIONAL ROADS-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-REHABILITATION/IMPROVEMENT ALONG DAANG MAHARLIKA HIGHWAY JCT. LEGAZPI-STO. DOMINGO-CAMARINES SUR BDRY | Region V | Region V | Completed | ₱86.8M | 100% | High risk67 | —-0.092 |
| 20FO0002ASSET PRESERVATION - PREVENTIVE MAINTENANCE-PRIMARY ROADS, DAANG MAHARLIKA (LZ), K0496+593-K0497+264, K0499+300-K0500+551 | Region V | Albay 3rd DEO | On-Going | ₱84.6M | 100% | High risk67 | —-0.031 |
| 20FA0006CLUSTER 6- ASPHALT OVERLAY OF DAANG MAHARLIKA JCT.-LEGAZPI-STO.DOMINGO-TABACO-CAM SUR BDRY. ROAD K0576+000-K0578+120; AND ASPHALT OVERLAY OF MT. MAYON PARK ROAD. K0521+357- K0524+444 | Region V | Albay 1st DEO | Completed | ₱91.5M | 100% | High risk66 | —-0.092 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19F00147ASPHALT OVERLAY OF PORTIONS OF LIGAO POBLACION ROAD AND DAANG MAHARLIKA POLANGUI SECTION, LIGAO AND POLANGUI, ALBAY, LIGAO AND POLANGUI, ALBAY 3RD LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱102.9M | 87% | High risk76 | Flagged0.030 |
| 19F00075CONSTRUCTION OF DPWH REGIONAL OFFICE V-PHASE I, RES COMPOUND, AIRPORT ROAD, LEGAZPI CITY | Region V | Region V | On-Going | ₱52.2M | 88% | High risk79 | Flagged0.024 |
| 22FB0200CONSTRUCTION OF CAMALIG WATER SYSTEM, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱47.4M | 16% | High risk63 | Flagged0.006 |
| 25F00017ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MAHARLIKA HIGHWAY (MORMS-BUCAF-SECTION), GUINOBATAN, ALBAY, GUINOBATAN, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱141.1M | 0% | High risk74 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 19F00075CONSTRUCTION OF DPWH REGIONAL OFFICE V-PHASE I, RES COMPOUND, AIRPORT ROAD, LEGAZPI CITY | Region V | Region V | On-Going | ₱52.2M | 88% | High risk79 | Flagged0.024 |
| 2 | 19F00147ASPHALT OVERLAY OF PORTIONS OF LIGAO POBLACION ROAD AND DAANG MAHARLIKA POLANGUI SECTION, LIGAO AND POLANGUI, ALBAY, LIGAO AND POLANGUI, ALBAY 3RD LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱102.9M | 87% | High risk76 | Flagged0.030 |
| 3 | 24F00448ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF NASISI RIVER FLOOD MITIGATION STRUCTURE, BRGY. BASAG, LIGAO C | Region V | Region V | On-Going | ₱187.6M | 89% | High risk74 | —-0.025 |
| 4 | 25F00017ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-MAHARLIKA HIGHWAY (MORMS-BUCAF-SECTION), GUINOBATAN, ALBAY, GUINOBATAN, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱141.1M | 0% | High risk74 | Flagged0.003 |
| 5 | 18F00052OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION AND IMPROVEMENT OF FLOOD CONTROL DIKES IN GUINOBATAN, ALBAY FOR CRITICAL SECTIONS OF | Region V | Region V | Completed | ₱144.7M | 100% | High risk73 | —-0.066 |
| 6 | 23F00364ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CAMARINES SUR-ALBAY DIVERSION ROAD, PACKAGE 2, ALBAY, OAS, ALBAY(3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱214.2M | 37% | High risk73 | —-0.017 |
| 7 | 16F00091BICOL RIVER BASIN WATERSHED MANAGEMENT PROJECT (FLOOD MITIGATION COMPONENT) - GUINOBATAN AND LIGAO FLOOD CONTROL, ALBAY 3RD LD | Region V | Region V | Completed | ₱193M | 100% | High risk73 | —-0.024 |
| 8 | 20F00019OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-SECONDARY ROADS, LIGAO-PIODURAN ROAD - K0501+(-017.00)-K0502+617.30, K0503+187.00-K0503+917.00, K0504+430.00-K0504+670.00, K0505+580.00-K0506+384.00, LIG | Region V | Region V | On-Going | ₱122.7M | 99% | High risk72 | —-0.003 |
| 9 | 20F00039OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF QUIRANGAY FLOOD CONTROL SYSTEM, QUIRANGAY, CAMALIG, ALBAY, CAMALIG, | Region V | Region V | Completed | ₱112.2M | 100% | High risk71 | —-0.070 |
| 10 | 24FO0017ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MANINILA RIVER (BRGY.MANINILA - BRGY. MASARAWAG) FLOOD | Region V | Albay 3rd DEO | Completed | ₱102.3M | 100% | High risk71 | —-0.076 |
| 11 | 25F00230CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239-PREVENTIVE MAINTENANCE-PRIMARY ROADS ALONG MAHARLIKA HIGHWAY-K0481+(-680)-K0481+(-497), K0490+437-K0491+098, POLANGUI, ALBAY (3RD LEGISLATIVE DI | Region V | Region V | On-Going | ₱68.1M | 2% | High risk70 | —-0.011 |
| 12 | 17M00025ROAD WIDENING OF DIGOS-MAKAR ROAD, K1598+778 K1601+545; K1601+566 K1601+694; K1602+08 -K1605+376, MALUNGON, SARANGANI | Region XII | Region XII | Completed | ₱173.4M | 100% | High risk70 | —-0.006 |
| 13 | 17F00085PREVENTIVE MAINTENANCE-ASPHALT OVERLAY OF LIBON-PANTAO-PIODURAN ROAD SECTION ALONG ALBAY WEST COAST ROAD, LIBON, ALBAY PROVINCE | Central Office | Roads Management Cluster I (Bilateral) | Completed | ₱189M | 100% | High risk70 | —-0.062 |
| 14 | 24F00078ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-DAANG MAHARLIKA (LZ)-K0494+000-K0496+571, OAS, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱99.2M | 52% | High risk69 | —-0.049 |
| 15 | 17FA0021CLUSTER 11- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: REHABILITATION/CONSTRUCTION/EXTENSION OF SEAWALL AT SAN LORENZO, SALVACION AND TAYHI, TABACO CITY, ALBAY 1ST LD | Region V | Albay 1st DEO | Completed | ₱96.5M | 100% | High risk68 | —-0.047 |
| 16 | 20FA0011REHABILITATION OF SAN VICENTE FLOOD CONTROL, TABACO CITY, ALBAY | Region V | Albay 1st DEO | Completed | ₱93.3M | 100% | High risk68 | —-0.077 |
| 17 | 17FA0015CLUSTER 5- CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-SECONDARY ROAD LIGAO-TABACO ROAD-K0518+410-K0519+065,K0524+200-K0525+100;DM JCT.- LEGAZPI-STO. DOMINGO-TABACO-CAM. SUR BDRY. ROAD-K0574+140-K0575+686 AND K0579+400-K0581+150 | Region V | Albay 1st DEO | Completed | ₱92.9M | 100% | High risk68 | —-0.057 |
| 18 | 20F00115LOCAL PROGRAM:NATIONAL ROADS AND BRIDGES-NATIONAL ROADS-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-REHABILITATION/IMPROVEMENT ALONG DAANG MAHARLIKA HIGHWAY JCT. LEGAZPI-STO. DOMINGO-CAMARINES SUR BDRY | Region V | Region V | Completed | ₱86.8M | 100% | High risk67 | —-0.092 |
| 19 | 20FO0002ASSET PRESERVATION - PREVENTIVE MAINTENANCE-PRIMARY ROADS, DAANG MAHARLIKA (LZ), K0496+593-K0497+264, K0499+300-K0500+551 | Region V | Albay 3rd DEO | On-Going | ₱84.6M | 100% | High risk67 | —-0.031 |
| 20 | 20FA0006CLUSTER 6- ASPHALT OVERLAY OF DAANG MAHARLIKA JCT.-LEGAZPI-STO.DOMINGO-TABACO-CAM SUR BDRY. ROAD K0576+000-K0578+120; AND ASPHALT OVERLAY OF MT. MAYON PARK ROAD. K0521+357- K0524+444 | Region V | Albay 1st DEO | Completed | ₱91.5M | 100% | High risk66 | —-0.092 |
| 21 | 22F00156LOCAL PROGRAM-NATIONAL BUILDING PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-CONSTRUCTION OF BUREAU OF FIRE PROTECTION REGIONAL TRAINING CENTER, LIGAO CITY, ALBAY 3RD LEGISLATIVE DISTRICT | Region V | Region V | On-Going | ₱47.2M | 29% | High risk66 | —-0.019 |
| 22 | 22FA0057CLUSTER 16- PREVENTIVE MAINTENANCE ALONG DAANG-MAHARLIKA JCT. LEGAZPI-STO. DOMINGO-TABACO-CAM. SUR BDRY. RD. K0540+(-715)-K0540+671; AND ALONG LIGAO-TABACO RD. K0516+(-844) - K0516+200, K0520+000-K0520+180 | Region V | Albay 1st DEO | Completed | ₱59.7M | 100% | High risk66 | —-0.096 |
| 23 | 21F00125CLUSTER VII: CONVERGENCE AND SPECIAL SUPPORT PROGRAM:SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE(MVUC) AS PER R.A. 11239-REHABILITATION/IMPROVEMENT OF (ASPHALT OVERLAY) ALONG:VII-I - DAANG MAHARLIKA,K0535+855-K0536+314; VII-II - DAANG MAHARLIKA K0536+50 | Region V | Region V | Completed | ₱55.4M | 100% | High risk66 | —-0.099 |
| 24 | 22FB0166CONSTRUCTION OF CAMALIG POLYTECHNIC SCHOOL, CAMALIG, ALBAY | Region V | Albay 2nd DEO | On-Going | ₱39.2M | 48% | High risk65 | —-0.023 |
| 25 | 22FO0049CONSTRUCTION OF EVACUATION CENTER AT BARANGAY MAURARO, GUINOBATAN, ALBAY | Region V | Albay 3rd DEO | On-Going | ₱33.5M | 80% | High risk64 | —-0.036 |