Opening the dossier…
Opening the dossier…
Contractor dossier
68 projects on file, including joint ventures this contractor is part of.
Total projects
68
Total budget
₱9.5B
Average progress
97.4%
Completion rate
80.9%
Average risk score
56.6
Medium risk on average, out of 100
Flagged as unusual
11
16.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 67 | ₱9.3B | 56.7 | 11 | 97.3% |
| Central Office | 1 | ₱139.9M | 52.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 55 | ₱6.1B | 53.6 | 5 | 97.5% |
| OTHER | 6 | ₱1.9B | 76.4 | 5 | 94.6% |
| Bridges, Roads | 3 | ₱470.8M | 67.7 | 0 | 100.0% |
| Buildings and Facilities | 2 | ₱543M | 57.7 | 0 | 100.0% |
| Bridges | 1 | ₱324.6M | 64.1 | 1 | 100.0% |
| Flood Control and Drainage | 1 | ₱96.5M | 60.9 | 0 | 89.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21L00148CONSTRUCTION OF DAVAO CITY COASTAL ROAD (TALOMO SECTION) - DAVAO - BUKIDNON ROAD (CATALUNAN PEQUEÑO - MINTAL SECTION - CALINAN SECTION) BYPASS ROAD (VIADUCT) (PARTIAL SUBSTRUCTURE), BARANGAY TALOMO PROPER AND BARANGAY CATALUNAN PEQUEÑO, DAVAO CITY | Region XI | Region XI | On-Going | ₱513M | 82% | High risk80 | Flagged0.065 |
| 19L00019CONSTRUCTION OF CONCRETE ROAD-BYPASS ROAD AT JCT. DAANG MAHARLIKA-ELIONG-JCT. ACACIA ROAD,DAVAO CITY | Region XI | Region XI | Completed | ₱102.7M | 100% | High risk79 | Flagged0.004 |
| 20L00117CONSTRUCTION OF CONCRETE ROAD AT SITIO DARILA, COLABOL AND MASUPIT, BRGY. LAMANAN GOING CABAGTUKAN ELEMENTARY SCHOOL, BRGY. DOMINGA, CALINAN DISTRICT, DAVAO CITY | Region XI | Region XI | Completed | ₱93.4M | 100% | High risk79 | —-0.015 |
| 17L00066WIDENING/RECONST./IMPVT. OF BYPASS RD @ JCT. DAANG MAHARLIKA-LICANAN-BUNAWAN-MAHAYAG-INDANGAN-CABANT | Region XI | Region XI | Completed | ₱177.1M | 100% | High risk79 | Flagged0.007 |
| 24L00053CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - DAANG MAHARLIKA (MN) - K1387+500 - K1387+530, K1388+450 - K1388+490, K1389+350 - K1389+421, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱38.1M | 96% | High risk73 | Flagged0.014 |
| 23L00066DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE - STA. ANA. WHARF - R. CASTILLO), TIMES BEACH - ROXAS AVE. SEGMENT, DAVAO CITY | Region XI | Region XI | On-Going | ₱989.1M | 89% | High risk69 | Flagged0.038 |
| 19L00106ROAD WIDENING-DAVAO CITY DIVERSION EXTENSION TO TORIL, PACKAGE 1, DAVAO CITY | Region XI | Region XI | Completed | ₱153.5M | 100% | High risk68 | —-0.035 |
| 20L00040CONSTRUCTION OF CONCRETE BRIDGE-JCT. CABANTIAN ROAD (ACACIA SECTION)-JCT. MANDUG-CALLAWA ROAD (MANDUG SECTION), DAVAO CITY | Region XI | Region XI | Completed | ₱194.7M | 100% | High risk68 | —-0.024 |
| 21L00051WIDENING OF BRIDGE - JCT. CABANTIAN ROAD (ACACIA SECTION) - JCT. MANDUG - CALLAWA ROAD (MANDUG SECTION), DAVAO CITY | Region XI | Region XI | Completed | ₱122.6M | 100% | High risk67 | —-0.045 |
| 19L00157CONST. OF CONCRETE ROAD-JCT. CABANTIAN ROAD (ACACIA SECTION)-JCT. MANDUG-CALLAWA ROAD (MANDUG SECT.) | Region XI | Region XI | Completed | ₱186.1M | 100% | High risk66 | —-0.052 |
| 18L00042ASPHALT OVERLAY ALONG DAVAO CITY DIVERSION ROAD (BRGY. COMMUNAL & BRGY. BUHANGIN-BRGY. TIGATTO SECTI | Region XI | Region XI | Completed | ₱184.2M | 100% | High risk66 | —-0.057 |
| 20L00165CONSTRUCTION OF ASPHALT ROAD - DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA-TIMES BEACH-ROXAS AVENUE), PACKAGE 28, DAVAO CITY | Region XI | Region XI | On-Going | ₱294.2M | 71% | High risk66 | Flagged0.025 |
| 19L00005CONST. OF ASPHALT ROAD-DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA-TIMES BEACH SECTION),PACKAGE 11,D | Region XI | Region XI | Completed | ₱244M | 100% | High risk66 | —-0.046 |
| 18L00024CONCRETING OF MARAGUSAN-PANTUKAN ROAD (MARAGUSAN SECTION) INCLUDING ROW, COMPOSTELA VALLEY | Region XI | Region XI | Completed | ₱221.5M | 100% | High risk65 | —-0.043 |
| 19L00006ROAD WIDENING - DAVAO CITY DIVERSION EXTENSION TO TORIL, PACKAGE 2, DAVAO CITY | Region XI | Region XI | Completed | ₱145.4M | 100% | High risk65 | —-0.045 |
| 18L00104DAVAO CITY COASTAL BYPASS ROAD AT JCT. DAVAO-COTABATO RD-BAGO APLAYA-TALOMO-MATINA APLAYA-ROXAS AVEN | Region XI | Region XI | Completed | ₱238.4M | 100% | High risk65 | —-0.040 |
| 18L00106DAVAO CITY COASTAL BYPASS ROAD AT JCT. DAVAO-COTABATO ROAD-BAGO APLAYA-TALOMO-MATINA APLAYA-ROXAS AV | Region XI | Region XI | Completed | ₱241.4M | 100% | High risk65 | —-0.040 |
| 20L00159CONSTRUCTION OF ASPHALT ROAD - DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE), PACKAGE 22, DAVAO CITY | Region XI | Region XI | Completed | ₱417.9M | 100% | High risk65 | —-0.032 |
| 20L00160CONSTRUCTION OF ASPHALT ROAD - DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA-TIMES BEACH-ROXAS AVENUE), PACKAGE 23, DAVAO CITY | Region XI | Region XI | Completed | ₱413.5M | 100% | High risk65 | —-0.033 |
| 21L00038CONSTRUCTION OF DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE), PACKAGE 29, DAVAO CITY | Region XI | Region XI | Completed | ₱395.7M | 100% | High risk65 | —-0.041 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 21L00148CONSTRUCTION OF DAVAO CITY COASTAL ROAD (TALOMO SECTION) - DAVAO - BUKIDNON ROAD (CATALUNAN PEQUEÑO - MINTAL SECTION - CALINAN SECTION) BYPASS ROAD (VIADUCT) (PARTIAL SUBSTRUCTURE), BARANGAY TALOMO PROPER AND BARANGAY CATALUNAN PEQUEÑO, DAVAO CITY | Region XI | Region XI | On-Going | ₱513M | 82% | High risk80 | Flagged0.065 |
| 23L00066DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE - STA. ANA. WHARF - R. CASTILLO), TIMES BEACH - ROXAS AVE. SEGMENT, DAVAO CITY | Region XI | Region XI | On-Going | ₱989.1M | 89% | High risk69 | Flagged0.038 |
| 25L00012PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY - K1485+311 - K1486+100, K1487+205 - K1487+405, K1487+451 - K1487+481, K1487+545 - K1487+708, K1490+000 - K1490+432, K1490+654 - K1490+856, K1490+866 - K1491+965, K1494+392 - K1494+469, K | Region XI | Region XI | On-Going | ₱192.1M | 6% | Medium risk56 | Flagged0.029 |
| 20L00165CONSTRUCTION OF ASPHALT ROAD - DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA-TIMES BEACH-ROXAS AVENUE), PACKAGE 28, DAVAO CITY | Region XI | Region XI | On-Going | ₱294.2M | 71% | High risk66 | Flagged0.025 |
| 19L00153WIDENING OF BRIDGE-BAGANGA BRIDGE (B01692MN) ALONG SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL ROAD | Region XI | Region XI | Completed | ₱324.6M | 100% | High risk64 | Flagged0.018 |
| 24L00053CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - DAANG MAHARLIKA (MN) - K1387+500 - K1387+530, K1388+450 - K1388+490, K1389+350 - K1389+421, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱38.1M | 96% | High risk73 | Flagged0.014 |
| 17LF0058ASPHALT OVERLAY WITH THERMOPLASTIC PVT. MARKINGS AT CATEEL-COMPOSTELA ROAD, KM. K1552+ (-430) - K1552+386; K1554+980- K1555+783.5; K1556+600 - K1557+600, CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | Completed | ₱31.8M | 100% | Medium risk41 | Flagged0.011 |
| 17L00066WIDENING/RECONST./IMPVT. OF BYPASS RD @ JCT. DAANG MAHARLIKA-LICANAN-BUNAWAN-MAHAYAG-INDANGAN-CABANT | Region XI | Region XI | Completed | ₱177.1M | 100% | High risk79 | Flagged0.007 |
| 17LB0168REPAIR/REHAB(ASPHALT OVERLAY) ALONG QUIRINO AVENUE, S01334MN, K1510+(-)630-K1510+709 DUAL SECTION S0 | Region XI | Davao City DEO | Completed | ₱52.8M | 100% | Medium risk45 | Flagged0.005 |
| 17LB0169REPAIR/REHAB (ASPHALT OVERLAY) ALONG RAMON MAGSAYSAY AVENUE (S01444MN),K1510+(-)439 TO K1510+700 DAVAO | Region XI | Davao City DEO | Completed | ₱44.6M | 100% | Medium risk41 | Flagged0.004 |
| 19L00019CONSTRUCTION OF CONCRETE ROAD-BYPASS ROAD AT JCT. DAANG MAHARLIKA-ELIONG-JCT. ACACIA ROAD,DAVAO CITY | Region XI | Region XI | Completed | ₱102.7M | 100% | High risk79 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 21L00148CONSTRUCTION OF DAVAO CITY COASTAL ROAD (TALOMO SECTION) - DAVAO - BUKIDNON ROAD (CATALUNAN PEQUEÑO - MINTAL SECTION - CALINAN SECTION) BYPASS ROAD (VIADUCT) (PARTIAL SUBSTRUCTURE), BARANGAY TALOMO PROPER AND BARANGAY CATALUNAN PEQUEÑO, DAVAO CITY | Region XI | Region XI | On-Going | ₱513M | 82% | High risk80 | Flagged0.065 |
| 2 | 19L00019CONSTRUCTION OF CONCRETE ROAD-BYPASS ROAD AT JCT. DAANG MAHARLIKA-ELIONG-JCT. ACACIA ROAD,DAVAO CITY | Region XI | Region XI | Completed | ₱102.7M | 100% | High risk79 | Flagged0.004 |
| 3 | 20L00117CONSTRUCTION OF CONCRETE ROAD AT SITIO DARILA, COLABOL AND MASUPIT, BRGY. LAMANAN GOING CABAGTUKAN ELEMENTARY SCHOOL, BRGY. DOMINGA, CALINAN DISTRICT, DAVAO CITY | Region XI | Region XI | Completed | ₱93.4M | 100% | High risk79 | —-0.015 |
| 4 | 17L00066WIDENING/RECONST./IMPVT. OF BYPASS RD @ JCT. DAANG MAHARLIKA-LICANAN-BUNAWAN-MAHAYAG-INDANGAN-CABANT | Region XI | Region XI | Completed | ₱177.1M | 100% | High risk79 | Flagged0.007 |
| 5 | 24L00053CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - DAANG MAHARLIKA (MN) - K1387+500 - K1387+530, K1388+450 - K1388+490, K1389+350 - K1389+421, DAVAO DE ORO | Region XI | Region XI | On-Going | ₱38.1M | 96% | High risk73 | Flagged0.014 |
| 6 | 23L00066DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE - STA. ANA. WHARF - R. CASTILLO), TIMES BEACH - ROXAS AVE. SEGMENT, DAVAO CITY | Region XI | Region XI | On-Going | ₱989.1M | 89% | High risk69 | Flagged0.038 |
| 7 | 19L00106ROAD WIDENING-DAVAO CITY DIVERSION EXTENSION TO TORIL, PACKAGE 1, DAVAO CITY | Region XI | Region XI | Completed | ₱153.5M | 100% | High risk68 | —-0.035 |
| 8 | 20L00040CONSTRUCTION OF CONCRETE BRIDGE-JCT. CABANTIAN ROAD (ACACIA SECTION)-JCT. MANDUG-CALLAWA ROAD (MANDUG SECTION), DAVAO CITY | Region XI | Region XI | Completed | ₱194.7M | 100% | High risk68 | —-0.024 |
| 9 | 21L00051WIDENING OF BRIDGE - JCT. CABANTIAN ROAD (ACACIA SECTION) - JCT. MANDUG - CALLAWA ROAD (MANDUG SECTION), DAVAO CITY | Region XI | Region XI | Completed | ₱122.6M | 100% | High risk67 | —-0.045 |
| 10 | 19L00157CONST. OF CONCRETE ROAD-JCT. CABANTIAN ROAD (ACACIA SECTION)-JCT. MANDUG-CALLAWA ROAD (MANDUG SECT.) | Region XI | Region XI | Completed | ₱186.1M | 100% | High risk66 | —-0.052 |
| 11 | 18L00042ASPHALT OVERLAY ALONG DAVAO CITY DIVERSION ROAD (BRGY. COMMUNAL & BRGY. BUHANGIN-BRGY. TIGATTO SECTI | Region XI | Region XI | Completed | ₱184.2M | 100% | High risk66 | —-0.057 |
| 12 | 20L00165CONSTRUCTION OF ASPHALT ROAD - DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA-TIMES BEACH-ROXAS AVENUE), PACKAGE 28, DAVAO CITY | Region XI | Region XI | On-Going | ₱294.2M | 71% | High risk66 | Flagged0.025 |
| 13 | 19L00005CONST. OF ASPHALT ROAD-DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA-TIMES BEACH SECTION),PACKAGE 11,D | Region XI | Region XI | Completed | ₱244M | 100% | High risk66 | —-0.046 |
| 14 | 18L00024CONCRETING OF MARAGUSAN-PANTUKAN ROAD (MARAGUSAN SECTION) INCLUDING ROW, COMPOSTELA VALLEY | Region XI | Region XI | Completed | ₱221.5M | 100% | High risk65 | —-0.043 |
| 15 | 19L00006ROAD WIDENING - DAVAO CITY DIVERSION EXTENSION TO TORIL, PACKAGE 2, DAVAO CITY | Region XI | Region XI | Completed | ₱145.4M | 100% | High risk65 | —-0.045 |
| 16 | 18L00104DAVAO CITY COASTAL BYPASS ROAD AT JCT. DAVAO-COTABATO RD-BAGO APLAYA-TALOMO-MATINA APLAYA-ROXAS AVEN | Region XI | Region XI | Completed | ₱238.4M | 100% | High risk65 | —-0.040 |
| 17 | 18L00106DAVAO CITY COASTAL BYPASS ROAD AT JCT. DAVAO-COTABATO ROAD-BAGO APLAYA-TALOMO-MATINA APLAYA-ROXAS AV | Region XI | Region XI | Completed | ₱241.4M | 100% | High risk65 | —-0.040 |
| 18 | 20L00159CONSTRUCTION OF ASPHALT ROAD - DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE), PACKAGE 22, DAVAO CITY | Region XI | Region XI | Completed | ₱417.9M | 100% | High risk65 | —-0.032 |
| 19 | 20L00160CONSTRUCTION OF ASPHALT ROAD - DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA-TIMES BEACH-ROXAS AVENUE), PACKAGE 23, DAVAO CITY | Region XI | Region XI | Completed | ₱413.5M | 100% | High risk65 | —-0.033 |
| 20 | 21L00038CONSTRUCTION OF DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE), PACKAGE 29, DAVAO CITY | Region XI | Region XI | Completed | ₱395.7M | 100% | High risk65 | —-0.041 |
| 21 | 19L00153WIDENING OF BRIDGE-BAGANGA BRIDGE (B01692MN) ALONG SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL ROAD | Region XI | Region XI | Completed | ₱324.6M | 100% | High risk64 | Flagged0.018 |
| 22 | 19L00077PREVENTIVE MAINT. OF ROAD:ASPHALT OVERLAY-ON SPECIFIC LOCATION ALONG MONTEVISTA-COMPOSTELA-MATI BDRY | Region XI | Region XI | Completed | ₱138.6M | 100% | High risk64 | —-0.059 |
| 23 | 19L00080CONSTRUCTION OF CONCRETE ROAD MARAGUSAN-PANTUKAN ROAD (MARAGUSAN SECTION), COMPOSTELA VALLEY | Region XI | Region XI | Completed | ₱129.8M | 100% | High risk63 | —-0.061 |
| 24 | 22L00023ROAD WIDENING - JCT. CABANTIAN ROAD (ACACIA SECTION) - JCT. MANDUG - CALLAWA ROAD (MANDUG SECTION) DAVAO CITY | Region XI | Region XI | On-Going | ₱96.1M | 100% | High risk62 | —-0.022 |
| 25 | 21L00060CONSTRUCTION OF CONCRETE ROAD - JCT. CABANTIAN ROAD (ACACIA SECTION) - JCT. MANDUG - CALLAWA ROAD (MANDUG SECTION) - JCT. MAGTUOD - TUGBOK ROAD (NEW VALENCIA SECTION), PACKAGE 2, DAVAO CITY | Region XI | Region XI | On-Going | ₱109.2M | 99% | High risk62 | —-0.017 |