Opening the dossier…
Opening the dossier…
Contractor dossier
220 projects on file, including joint ventures this contractor is part of.
Total projects
220
Total budget
₱6.7B
Average progress
97.0%
Completion rate
90.5%
Average risk score
36.4
Medium risk on average, out of 100
Flagged as unusual
5
2.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 205 | ₱5.8B | 34.7 | 3 | 98.3% |
| Region V | 12 | ₱706.6M | 63.5 | 2 | 73.3% |
| Cordillera Administrative Region | 1 | ₱57.3M | 52.4 | 0 | 100.0% |
| National Capital Region | 1 | ₱29.7M | 46.0 | 0 | 100.0% |
| Region I | 1 | ₱38.6M | 45.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 83 | ₱3.6B | 39.6 | 0 | 99.1% |
| Buildings and Facilities | 60 | ₱367.3M | 19.7 | 0 | 99.7% |
| Bridges | 41 | ₱955.6M | 40.4 | 1 | 91.5% |
| Flood Control and Drainage | 28 | ₱1.4B | 43.4 | 0 | 97.3% |
| OTHER | 4 | ₱185.5M | 74.7 | 2 | 83.8% |
| GAA 2025 SSP | 2 | ₱114.9M | 94.7 | 2 | 60.2% |
| GAA 2025 OO-1 | 1 | ₱20M | 93.1 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱90.8M | 89.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CE0252CONSTRUCTION OF BRIDGE, BARANGAY KALIWANAGAN TO BARANGAY TAYABO, SAN JOSE CITY, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱95.5M | 49% | High risk96 | Flagged0.021 |
| 25CE0071REPLACEMENT OF WEAK BRIDGE, BARANGAY VILLA BOADO, TALUGTUG, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱19.4M | 71% | High risk94 | Flagged0.006 |
| 25F00403ORGANIZATIONAL OUTCOME 1 (OO1): ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-DAET-SAN VICENTE-SAN LORENZO CIRCUMFERENTIAL RD-(S06315LZ) CHAINAGE 2194 | Region V | Region V | On-Going | ₱20M | 100% | High risk93 | —-0.012 |
| 25CE0068CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALAVERA RIVER, BARANGAY DIGDIG, CARRANGLAN, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱90.8M | 100% | High risk90 | —-0.016 |
| 25CE0285CONSTRUCTION OF SCHOOL BUILDING, CARRANGLAN NATIONAL HIGH SCHOOL, BARANGAY FC OTIC, CARRANGLAN, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱19.8M | 84% | High risk83 | Flagged0.037 |
| 23F00377ORGANIZATIONAL OUTCOME 1 (OO1): ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE -WIDENING OF PERMANENT BRIDGES-DAET BR. 1(B00492LZ) ALONG TAGAS-DAET-POBLACION-MAGANG ROAD, DAET, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱36.7M | 58% | High risk78 | Flagged0.010 |
| 17CE0152CONSTRUCTION OF CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILE ALONG BALIWAG RIVER, BRGY. SALVACION 2, LUPAO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱74.4M | 100% | High risk73 | —-0.056 |
| 17CE0153CONSTRUCTION/REHABILITATION OF AGUPALO ESTE SLOPE PROTECTION, BRGY. AGUPALO ESTE, LUPAO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱58.6M | 100% | High risk72 | —-0.059 |
| 25CE0043NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAN JOSE CITY BYPASS ROAD (PACKAGE 2), NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱71.5M | 91% | High risk72 | —-0.036 |
| 17CE0049REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATIONAL ROAD INCLUDING DRAINAGE, MUÑOZ-LUPAO RD., KO147+341 - KO147+574; KO148+000 - KO148+300; KO150+063 - KO151+707; KO153+000 - KO153+146; KO164+886 - KO165+000 | Region III | Nueva Ecija 1st DEO | Completed | ₱79.3M | 100% | High risk71 | —-0.060 |
| 19CE0198ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - JCT PINAGPANAAN- RIZAL - PANTABANGAN RD K0136+000 - K0137+000, K0137+784 - K0138+000, K0142+000 - K0142+167, K0143+450 - K0143+571, K0146+000 - K0146+13 | Region III | Nueva Ecija 1st DEO | Completed | ₱79.8M | 100% | High risk70 | —-0.031 |
| 25F00062ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES - DAGOOK BR. 2 (B02703LZ) ALONG MAHARLIKA HIGHWAY, TIGBINAN, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱68.4M | 0% | High risk69 | Flagged0.013 |
| 24CE0352CONSTRUCTION OF MULTI-PURPOSE FACILITIES (SPORTS COMPLEX), SAN JOSE CITY, NUEVA ECIJA (PHASE 1) | Region III | Nueva Ecija 1st DEO | On-Going | ₱49.3M | 93% | High risk68 | —-0.011 |
| 24F00112CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BASUD-LANOT ROAD, MERCED | Region V | Region V | On-Going | ₱144.6M | 70% | High risk68 | —-0.043 |
| 23FC0072REPLACEMENT OF PERMANENT WEAK BRIDGES - TIGBINAN BR. (B02701LZ) ALONG DAANG MAHARLIKA (LZ), BRGY. TIGBINAN, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱94.6M | 67% | High risk68 | —-0.008 |
| 16CE0276REHABILITATION/RECONSTUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), SAN JOSE-LUPAO RD., KO168+000 TO KO169+336; KO170+000 TO KO170+615 | Region III | Nueva Ecija 1st DEO | Completed | ₱31.1M | 100% | High risk66 | —-0.066 |
| 17CE0315ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - MUÑOZ - LUPAO RD - K0149+000 - K0150+000 | Region III | Nueva Ecija 1st DEO | Completed | ₱23.8M | 100% | High risk65 | —-0.067 |
| 20CE0181CONSTRUCTION OF ROAD, BRGY. CAANAWAN, SAN JOSE CITY, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱5.7M | 100% | High risk65 | —-0.066 |
| 20CE0118ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - JCT PINAGPANAAN-RIZAL-PANTABANGAN RD K0142+315 - K0143+000 | Region III | Nueva Ecija 1st DEO | Completed | ₱25.2M | 100% | High risk65 | —-0.068 |
| 23F00136CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF P-5 BORABOD TO AWITAN ROAD, DA | Region V | Region V | Completed | ₱96.5M | 100% | High risk65 | —-0.089 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CE0285CONSTRUCTION OF SCHOOL BUILDING, CARRANGLAN NATIONAL HIGH SCHOOL, BARANGAY FC OTIC, CARRANGLAN, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱19.8M | 84% | High risk83 | Flagged0.037 |
| 25CE0252CONSTRUCTION OF BRIDGE, BARANGAY KALIWANAGAN TO BARANGAY TAYABO, SAN JOSE CITY, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱95.5M | 49% | High risk96 | Flagged0.021 |
| 25F00062ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES - DAGOOK BR. 2 (B02703LZ) ALONG MAHARLIKA HIGHWAY, TIGBINAN, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱68.4M | 0% | High risk69 | Flagged0.013 |
| 23F00377ORGANIZATIONAL OUTCOME 1 (OO1): ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE -WIDENING OF PERMANENT BRIDGES-DAET BR. 1(B00492LZ) ALONG TAGAS-DAET-POBLACION-MAGANG ROAD, DAET, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱36.7M | 58% | High risk78 | Flagged0.010 |
| 25CE0071REPLACEMENT OF WEAK BRIDGE, BARANGAY VILLA BOADO, TALUGTUG, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱19.4M | 71% | High risk94 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25CE0252CONSTRUCTION OF BRIDGE, BARANGAY KALIWANAGAN TO BARANGAY TAYABO, SAN JOSE CITY, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱95.5M | 49% | High risk96 | Flagged0.021 |
| 2 | 25CE0071REPLACEMENT OF WEAK BRIDGE, BARANGAY VILLA BOADO, TALUGTUG, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱19.4M | 71% | High risk94 | Flagged0.006 |
| 3 | 25F00403ORGANIZATIONAL OUTCOME 1 (OO1): ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-DAET-SAN VICENTE-SAN LORENZO CIRCUMFERENTIAL RD-(S06315LZ) CHAINAGE 2194 | Region V | Region V | On-Going | ₱20M | 100% | High risk93 | —-0.012 |
| 4 | 25CE0068CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALAVERA RIVER, BARANGAY DIGDIG, CARRANGLAN, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱90.8M | 100% | High risk90 | —-0.016 |
| 5 | 25CE0285CONSTRUCTION OF SCHOOL BUILDING, CARRANGLAN NATIONAL HIGH SCHOOL, BARANGAY FC OTIC, CARRANGLAN, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱19.8M | 84% | High risk83 | Flagged0.037 |
| 6 | 23F00377ORGANIZATIONAL OUTCOME 1 (OO1): ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE -WIDENING OF PERMANENT BRIDGES-DAET BR. 1(B00492LZ) ALONG TAGAS-DAET-POBLACION-MAGANG ROAD, DAET, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱36.7M | 58% | High risk78 | Flagged0.010 |
| 7 | 17CE0152CONSTRUCTION OF CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILE ALONG BALIWAG RIVER, BRGY. SALVACION 2, LUPAO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱74.4M | 100% | High risk73 | —-0.056 |
| 8 | 17CE0153CONSTRUCTION/REHABILITATION OF AGUPALO ESTE SLOPE PROTECTION, BRGY. AGUPALO ESTE, LUPAO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱58.6M | 100% | High risk72 | —-0.059 |
| 9 | 25CE0043NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAN JOSE CITY BYPASS ROAD (PACKAGE 2), NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱71.5M | 91% | High risk72 | —-0.036 |
| 10 | 17CE0049REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATIONAL ROAD INCLUDING DRAINAGE, MUÑOZ-LUPAO RD., KO147+341 - KO147+574; KO148+000 - KO148+300; KO150+063 - KO151+707; KO153+000 - KO153+146; KO164+886 - KO165+000 | Region III | Nueva Ecija 1st DEO | Completed | ₱79.3M | 100% | High risk71 | —-0.060 |
| 11 | 19CE0198ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - JCT PINAGPANAAN- RIZAL - PANTABANGAN RD K0136+000 - K0137+000, K0137+784 - K0138+000, K0142+000 - K0142+167, K0143+450 - K0143+571, K0146+000 - K0146+13 | Region III | Nueva Ecija 1st DEO | Completed | ₱79.8M | 100% | High risk70 | —-0.031 |
| 12 | 25F00062ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES - DAGOOK BR. 2 (B02703LZ) ALONG MAHARLIKA HIGHWAY, TIGBINAN, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱68.4M | 0% | High risk69 | Flagged0.013 |
| 13 | 24CE0352CONSTRUCTION OF MULTI-PURPOSE FACILITIES (SPORTS COMPLEX), SAN JOSE CITY, NUEVA ECIJA (PHASE 1) | Region III | Nueva Ecija 1st DEO | On-Going | ₱49.3M | 93% | High risk68 | —-0.011 |
| 14 | 24F00112CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BASUD-LANOT ROAD, MERCED | Region V | Region V | On-Going | ₱144.6M | 70% | High risk68 | —-0.043 |
| 15 | 23FC0072REPLACEMENT OF PERMANENT WEAK BRIDGES - TIGBINAN BR. (B02701LZ) ALONG DAANG MAHARLIKA (LZ), BRGY. TIGBINAN, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱94.6M | 67% | High risk68 | —-0.008 |
| 16 | 16CE0276REHABILITATION/RECONSTUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), SAN JOSE-LUPAO RD., KO168+000 TO KO169+336; KO170+000 TO KO170+615 | Region III | Nueva Ecija 1st DEO | Completed | ₱31.1M | 100% | High risk66 | —-0.066 |
| 17 | 17CE0315ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - MUÑOZ - LUPAO RD - K0149+000 - K0150+000 | Region III | Nueva Ecija 1st DEO | Completed | ₱23.8M | 100% | High risk65 | —-0.067 |
| 18 | 20CE0181CONSTRUCTION OF ROAD, BRGY. CAANAWAN, SAN JOSE CITY, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱5.7M | 100% | High risk65 | —-0.066 |
| 19 | 20CE0118ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - JCT PINAGPANAAN-RIZAL-PANTABANGAN RD K0142+315 - K0143+000 | Region III | Nueva Ecija 1st DEO | Completed | ₱25.2M | 100% | High risk65 | —-0.068 |
| 20 | 23F00136CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF P-5 BORABOD TO AWITAN ROAD, DA | Region V | Region V | Completed | ₱96.5M | 100% | High risk65 | —-0.089 |
| 21 | 16CE0224REHABILITATION OF FLOOD CONTROL DIKES ALONG BANCO RIVER, SAN ESTEBAN, STA. 5+260-STA. 5+412, RIZAL, | Region III | Nueva Ecija 1st DEO | Completed | ₱18.4M | 100% | High risk65 | —-0.061 |
| 22 | 16CE0281CONSTRUCTION OF REVETMENT, BRGY. TABULAC, SAN JOSE CITY, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱27.9M | 100% | High risk64 | —-0.061 |
| 23 | 16CE0284REHABILITATION/IMPROVEMENT OF TALAVERA RIVER CONTROL, SIBUT, SAN JOSE CITY, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱33.3M | 100% | High risk64 | —-0.061 |
| 24 | 17CE0156CONSTRUCTION OF REVETMENT, STA. 52+436 - STA.53+014, BRGY. TABULAC, SAN JOSE CITY, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱46.5M | 100% | High risk64 | —-0.058 |
| 25 | 17CE0069CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, WIDENING OF PERMANENT BRIDGES, INCLUDING ROW TO MORE THAN 2 LANES; PUTLAN BR. (B01978LZ) ALONG DAANG MAHARLIKA (LZ) | Region III | Nueva Ecija 1st DEO | Completed | ₱44.6M | 100% | Medium risk58 | —-0.031 |