Contractor dossier
220 projects on file, including joint ventures this contractor is part of.
Total projects
220
Total budget
₱6.7B
Average progress
97.0%
Completion rate
90.5%
Average risk score
36.4
Medium risk on average, out of 100
Flagged as unusual
5
2.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 205 | ₱5.8B | 34.7 | 3 | 98.3% |
| Region V | 12 | ₱706.6M | 63.5 | 2 | 73.3% |
| Cordillera Administrative Region | 1 | ₱57.3M | 52.4 | 0 | 100.0% |
| National Capital Region | 1 | ₱29.7M | 46.0 | 0 | 100.0% |
| Region I | 1 | ₱38.6M | 45.5 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 83 | ₱3.6B | 39.6 | 0 | 99.1% |
| Buildings and Facilities | 60 | ₱367.3M | 19.7 | 0 | 99.7% |
| Bridges | 41 | ₱955.6M | 40.4 | 1 | 91.5% |
| Flood Control and Drainage | 28 | ₱1.4B | 43.4 | 0 | 97.3% |
| OTHER | 4 | ₱185.5M | 74.7 | 2 | 83.8% |
| GAA 2025 SSP | 2 | ₱114.9M | 94.7 | 2 | 60.2% |
| GAA 2025 OO-1 | 1 | ₱20M | 93.1 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱90.8M | 89.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CE0252CONSTRUCTION OF BRIDGE, BARANGAY KALIWANAGAN TO BARANGAY TAYABO, SAN JOSE CITY, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱95.5M | 49% | High risk96 | Flagged0.021 |
| 25CE0071REPLACEMENT OF WEAK BRIDGE, BARANGAY VILLA BOADO, TALUGTUG, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱19.4M | 71% | High risk94 | Flagged0.006 |
| 25F00403ORGANIZATIONAL OUTCOME 1 (OO1): ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-DAET-SAN VICENTE-SAN LORENZO CIRCUMFERENTIAL RD-(S06315LZ) CHAINAGE 2194 | Region V | Region V | On-Going | ₱20M | 100% | High risk93 | —-0.012 |
| 25CE0068CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALAVERA RIVER, BARANGAY DIGDIG, CARRANGLAN, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱90.8M | 100% | High risk90 | —-0.016 |
| 25CE0285CONSTRUCTION OF SCHOOL BUILDING, CARRANGLAN NATIONAL HIGH SCHOOL, BARANGAY FC OTIC, CARRANGLAN, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱19.8M | 84% | High risk83 | Flagged0.037 |
| 23F00377ORGANIZATIONAL OUTCOME 1 (OO1): ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE -WIDENING OF PERMANENT BRIDGES-DAET BR. 1(B00492LZ) ALONG TAGAS-DAET-POBLACION-MAGANG ROAD, DAET, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱36.7M | 58% | High risk78 | Flagged0.010 |
| 17CE0152CONSTRUCTION OF CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILE ALONG BALIWAG RIVER, BRGY. SALVACION 2, LUPAO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱74.4M | 100% | High risk73 | —-0.056 |
| 17CE0153CONSTRUCTION/REHABILITATION OF AGUPALO ESTE SLOPE PROTECTION, BRGY. AGUPALO ESTE, LUPAO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱58.6M | 100% | High risk72 | —-0.059 |
| 25CE0043NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAN JOSE CITY BYPASS ROAD (PACKAGE 2), NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱71.5M | 91% | High risk72 | —-0.036 |
| 17CE0049REHAB/RECONST/UPGRADING OF DAMAGED PAVED NATIONAL ROAD INCLUDING DRAINAGE, MUÑOZ-LUPAO RD., KO147+341 - KO147+574; KO148+000 - KO148+300; KO150+063 - KO151+707; KO153+000 - KO153+146; KO164+886 - KO165+000 | Region III | Nueva Ecija 1st DEO | Completed | ₱79.3M | 100% | High risk71 | —-0.060 |
| 19CE0198ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - JCT PINAGPANAAN- RIZAL - PANTABANGAN RD K0136+000 - K0137+000, K0137+784 - K0138+000, K0142+000 - K0142+167, K0143+450 - K0143+571, K0146+000 - K0146+13 | Region III | Nueva Ecija 1st DEO | Completed | ₱79.8M | 100% | High risk70 | —-0.031 |
| 25F00062ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES - DAGOOK BR. 2 (B02703LZ) ALONG MAHARLIKA HIGHWAY, TIGBINAN, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱68.4M | 0% | High risk69 | Flagged0.013 |
| 24CE0352CONSTRUCTION OF MULTI-PURPOSE FACILITIES (SPORTS COMPLEX), SAN JOSE CITY, NUEVA ECIJA (PHASE 1) | Region III | Nueva Ecija 1st DEO | On-Going | ₱49.3M | 93% | High risk68 | —-0.011 |
| 24F00112CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BASUD-LANOT ROAD, MERCED | Region V | Region V | On-Going | ₱144.6M | 70% | High risk68 | —-0.043 |
| 23FC0072REPLACEMENT OF PERMANENT WEAK BRIDGES - TIGBINAN BR. (B02701LZ) ALONG DAANG MAHARLIKA (LZ), BRGY. TIGBINAN, LABO, CAMARINES NORTE | Region V | Camarines Norte DEO | On-Going | ₱94.6M | 67% | High risk68 | —-0.008 |
| 16CE0276REHABILITATION/RECONSTUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), SAN JOSE-LUPAO RD., KO168+000 TO KO169+336; KO170+000 TO KO170+615 | Region III | Nueva Ecija 1st DEO | Completed | ₱31.1M | 100% | High risk66 | —-0.066 |
| 17CE0315ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - MUÑOZ - LUPAO RD - K0149+000 - K0150+000 | Region III | Nueva Ecija 1st DEO | Completed | ₱23.8M | 100% | High risk65 | —-0.067 |
| 20CE0181CONSTRUCTION OF ROAD, BRGY. CAANAWAN, SAN JOSE CITY, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱5.7M | 100% | High risk65 | —-0.066 |
| 20CE0118ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - JCT PINAGPANAAN-RIZAL-PANTABANGAN RD K0142+315 - K0143+000 | Region III | Nueva Ecija 1st DEO | Completed | ₱25.2M | 100% | High risk65 | —-0.068 |
| 23F00136CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF P-5 BORABOD TO AWITAN ROAD, DA | Region V | Region V | Completed | ₱96.5M | 100% | High risk65 | —-0.089 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CE0285CONSTRUCTION OF SCHOOL BUILDING, CARRANGLAN NATIONAL HIGH SCHOOL, BARANGAY FC OTIC, CARRANGLAN, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱19.8M | 84% | High risk83 | Flagged0.037 |
| 25CE0252CONSTRUCTION OF BRIDGE, BARANGAY KALIWANAGAN TO BARANGAY TAYABO, SAN JOSE CITY, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱95.5M | 49% | High risk96 | Flagged0.021 |
| 25F00062ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES - DAGOOK BR. 2 (B02703LZ) ALONG MAHARLIKA HIGHWAY, TIGBINAN, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱68.4M | 0% | High risk69 | Flagged0.013 |
| 23F00377ORGANIZATIONAL OUTCOME 1 (OO1): ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE -WIDENING OF PERMANENT BRIDGES-DAET BR. 1(B00492LZ) ALONG TAGAS-DAET-POBLACION-MAGANG ROAD, DAET, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱36.7M | 58% | High risk78 | Flagged0.010 |
| 25CE0071REPLACEMENT OF WEAK BRIDGE, BARANGAY VILLA BOADO, TALUGTUG, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱19.4M | 71% | High risk94 | Flagged0.006 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 21CE0047CONSTRUCTION OF SCHOOL BUILDING, CAMBITALA HIGH SCHOOL, BARANGAY CAMBITALA, PANTABANGAN, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱4.9M | 100% | Medium risk34 | —-0.101 |
| 102 | 22CE0117ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - PANTABANGAN - CANILI - BASAL - BALER RD - K0178+440 - K0178+500 | Region III | Nueva Ecija 1st DEO | Completed | ₱29.9M | 100% | Medium risk34 | —-0.102 |
| 103 | 20CE0235WIDENING OF PERMANENT BRIDGES MANICLA BR. (B01968LZ) ALONG DAANG MAHARLIKA (LZ) | Region III | Nueva Ecija 1st DEO | Completed | ₱11.1M | 100% | Medium risk34 | —-0.066 |
| 104 | 22CE0167WIDENING OF PERMANENT BRIDGES ARIMAL BR. 1 (B01289LZ) ALONG SN JOSE - LUPAO RD | Region III | Nueva Ecija 1st DEO | Completed | ₱37.8M | 100% | Medium risk34 | —-0.060 |
| 105 | 19CE0224CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BRGY. SAN ANTONIO ESTE, LUPAO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱4.8M | 100% | Medium risk34 | —-0.103 |
| 106 | 23CE0036ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, DAANG MAHARLIKA (LZ) K0169+1000 - K0169+1040 | Region III | Nueva Ecija 1st DEO | Completed | ₱24.5M | 100% | Medium risk34 | —-0.102 |
| 107 | 23CE0035ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, DAANG MAHARLIKA (LZ) K0166+900 - K0166+940 | Region III | Nueva Ecija 1st DEO | Completed | ₱24.5M | 100% | Medium risk34 | —-0.102 |
| 108 | 24CE0304ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS, MUÑOZ - LUPAO RD - K0 156+525 - K0 156+656, K0 156+735 - K0 157+000, K0 157+000 - K0 157+879 | Region III | Nueva Ecija 1st DEO | Completed | ₱39.8M | 100% | Medium risk34 | —-0.101 |
| 109 | 18CE0064ASSET PRESERVATION - PREVENTIVE MAINTENANCE SECONDARY ROADS - SAN JOSE CITY - RIZAL RD VIA PINILI - PORAIS - VILLA JOSON (PALARILLA) RD K0160+(-141.10) - K0160+000, K0160+100 - K0161+000, K0161+000 - K0161+104, K0161+309 - K0161+506.70, K0161+905 - K0163+ | Region III | Nueva Ecija 1st DEO | Completed | ₱40.8M | 100% | Medium risk34 | —-0.102 |
| 110 | 22CE0097ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0185+400 - K0185+450 | Region III | Nueva Ecija 1st DEO | Completed | ₱25.5M | 100% | Medium risk34 | —-0.100 |
| 111 | 18CE0138WIDENING OF PERMANENT BRIDGES - SAN ROQUE BR. (B00112LZ) ALONG SN JOSE - LUPAO RD | Region III | Nueva Ecija 1st DEO | Completed | ₱40.5M | 100% | Medium risk34 | —-0.062 |
| 112 | 22CE0100CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY ABAR 2ND, SAN JOSE CITY, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱4.9M | 100% | Medium risk33 | —-0.104 |
| 113 | 23CE0070ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS, DAANG MAHARLIKA (LZ) - K0202+000 - K0202+050, K0205+681 - K0206+442, K0206+894 - K0207+000 | Region III | Nueva Ecija 1st DEO | Completed | ₱15.7M | 100% | Medium risk33 | —-0.101 |
| 114 | 25CE0170CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PINILI, SAN JOSE CITY, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱4.9M | 100% | Medium risk33 | —-0.104 |
| 115 | 25CE0139CONSTRUCTION OF BOX CULVERT, BARANGAY PORTAL, RIZAL, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱6.9M | 62% | Medium risk33 | —-0.042 |
| 116 | 25CF0073ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - JCT TABLANG - GABALDON RD. K0154+000-K0156+415 | Region III | Nueva Ecija 2nd DEO | On-Going | ₱38.3M | 65% | Medium risk33 | —-0.063 |
| 117 | 20CE0120WIDENING OF PERMANENT BRIDGES BALBALUNGAO BR. 1 (B01286LZ) ALONG SN JOSE-LUPAO RD | Region III | Nueva Ecija 1st DEO | Completed | ₱44.2M | 100% | Medium risk33 | —-0.061 |
| 118 | 19CE0139BRIDGE - CONSTRUCTION OF NEW PERMANENT BRIDGES, AYA BR. 2 ALONG JCT PINAGPANAAN - RIZAL - PANTABANGAN ROAD | Region III | Nueva Ecija 1st DEO | Completed | ₱14.6M | 100% | Medium risk33 | —-0.065 |
| 119 | 25CE0188CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN ROQUE, LUPAO, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱4.9M | 100% | Medium risk33 | —-0.103 |
| 120 | 18CE0079ASSET PRESERVATION - PREVENTIVE MAINTENANCE PRIMARY ROADS - SN JOSE - LUPAO RD K0160+000 - K0160+778, K0172+299.40 - K0172+565, K0172+592.20 - K0173+716.40 | Region III | Nueva Ecija 1st DEO | Completed | ₱21.9M | 100% | Medium risk33 | —-0.103 |
| 121 | 23CE0051NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SAN JOSE CITY BYPASS ROAD (PACKAGE 3), NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱19.2M | 100% | Medium risk33 | —-0.103 |
| 122 | 20CE0010ASSET PRESERVATION - PREVENTIVE MAINTENANCE - TERTIARY ROADS - MUÑOZ-LUPAO RD K0151+707 - K0152+000, K0153+000 - K0153+146, K0161+072 - K0162+000, K0163+350 - K0164+641 | Region III | Nueva Ecija 1st DEO | Completed | ₱22.1M | 100% | Medium risk33 | —-0.103 |
| 123 | 19CE0138BRIDGE - CONSTRUCTION OF NEW PERMANENT BRIDGES, AYA BR. 1 ALONG JCT PINAGPANAAN - RIZAL - PANTABANGAN ROAD | Region III | Nueva Ecija 1st DEO | Completed | ₱19.2M | 100% | Medium risk33 | —-0.064 |
| 124 | 22CE0036CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CAANAWAN, SAN JOSE, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | Completed | ₱4.9M | 100% | Medium risk33 | —-0.104 |
| 125 | 23CE0099WIDENING OF PERMANENT BRIDGES - MALASIN BR. (B01966LZ) ALONG DAANG MAHARLIKA (LZ) | Region III | Nueva Ecija 1st DEO | Completed | ₱29.3M | 100% | Medium risk33 | —-0.061 |