Opening the dossier…
Opening the dossier…
Contractor dossier
212 projects on file, including joint ventures this contractor is part of.
Total projects
212
Total budget
₱2.1B
Average progress
97.6%
Completion rate
96.7%
Average risk score
31.4
Medium risk on average, out of 100
Flagged as unusual
5
2.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 212 | ₱2.1B | 31.4 | 5 | 97.6% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 119 | ₱1B | 34.6 | 1 | 99.2% |
| Buildings and Facilities | 63 | ₱110.6M | 17.1 | 0 | 100.0% |
| Flood Control and Drainage | 23 | ₱945.5M | 54.4 | 4 | 82.0% |
| Bridges | 4 | ₱13.3M | 31.6 | 0 | 100.0% |
| Water Provision and Storage | 3 | ₱8.6M | 30.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0335CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF RIVER CHANNEL IMPROVEMENT ALONG SITIO UPPER TALAYONG - SITIO LOWER T | Region VII | Cebu 7th DEO | On-Going | ₱75.8M | 0% | High risk82 | Flagged0.075 |
| 23HO0291CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL DIKE AT BARANGAY KABALAASNAN (DOWNST | Region VII | Cebu 7th DEO | On-Going | ₱70.9M | 0% | High risk82 | Flagged0.066 |
| 23HO0263CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL DIKE AT PUROK LUBI, BARANGAY KABALAA | Region VII | Cebu 7th DEO | On-Going | ₱48M | 0% | High risk79 | Flagged0.064 |
| 24HO0157CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL DIKE AT BARANGAY KABALAASNAN (DOWNST | Region VII | Cebu 7th DEO | On-Going | ₱33.3M | 0% | High risk74 | Flagged0.063 |
| 23HO0141CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES: CONSTRUCTION OF RIVER RETAINING WALL STRUCTURE AT SITIO UPPER TALAYONG, BARANG | Region VII | Cebu 7th DEO | Completed | ₱96.3M | 100% | High risk64 | —-0.067 |
| 23HO0128CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF DIKE ALONG KABALAASNAN RIVER, DUMANJUG, CEBU | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.067 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0335CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF RIVER CHANNEL IMPROVEMENT ALONG SITIO UPPER TALAYONG - SITIO LOWER T | Region VII | Cebu 7th DEO | On-Going | ₱75.8M | 0% | High risk82 | Flagged0.075 |
| 23HO0291CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL DIKE AT BARANGAY KABALAASNAN (DOWNST | Region VII | Cebu 7th DEO | On-Going | ₱70.9M | 0% | High risk82 | Flagged0.066 |
| 23HO0263CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL DIKE AT PUROK LUBI, BARANGAY KABALAA | Region VII | Cebu 7th DEO | On-Going | ₱48M | 0% | High risk79 | Flagged0.064 |
| 24HO0157CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL DIKE AT BARANGAY KABALAASNAN (DOWNST | Region VII | Cebu 7th DEO | On-Going | ₱33.3M | 0% | High risk74 | Flagged0.063 |
| 19HG0099LOCAL PROGRAM, LOCAL ROADS AND BRIDGES, LOCALROADS, CONSTRUCTION OF CONCRTE ROAD-CONCRETING OF SITIO LAWIS AND SITIO LOOC, POBLACION, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱4.7M | 0% | Low risk28 | Flagged0.007 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 23HO0335CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF RIVER CHANNEL IMPROVEMENT ALONG SITIO UPPER TALAYONG - SITIO LOWER T | Region VII | Cebu 7th DEO | On-Going | ₱75.8M | 0% | High risk82 | Flagged0.075 |
| 2 | 23HO0291CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL DIKE AT BARANGAY KABALAASNAN (DOWNST | Region VII | Cebu 7th DEO | On-Going | ₱70.9M | 0% | High risk82 | Flagged0.066 |
| 3 | 23HO0263CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL DIKE AT PUROK LUBI, BARANGAY KABALAA | Region VII | Cebu 7th DEO | On-Going | ₱48M | 0% | High risk79 | Flagged0.064 |
| 4 | 24HO0157CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL DIKE AT BARANGAY KABALAASNAN (DOWNST | Region VII | Cebu 7th DEO | On-Going | ₱33.3M | 0% | High risk74 | Flagged0.063 |
| 5 | 23HO0141CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES: CONSTRUCTION OF RIVER RETAINING WALL STRUCTURE AT SITIO UPPER TALAYONG, BARANG | Region VII | Cebu 7th DEO | Completed | ₱96.3M | 100% | High risk64 | —-0.067 |
| 6 | 23HO0128CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF DIKE ALONG KABALAASNAN RIVER, DUMANJUG, CEBU | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.067 |
| 7 | 18HG0144CONCRETING OF LIBO-O TO LEPANTO TO BRGY. CERDEÑA FMR, BRGY. CERDEÑA, MALABUYOC, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱6.6M | 100% | Medium risk58 | —-0.007 |
| 8 | 17HE0038ASSETS PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) - SECONDARY ROADS K0027+281-K0028+134, CEBU | Region VII | Cebu 1st DEO | Completed | ₱8.6M | 100% | Medium risk57 | —-0.065 |
| 9 | 25HO0004ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL, PUROK LUBE, BARANGAY KABALAASNAN (DOWNSTR | Region VII | Cebu 7th DEO | On-Going | ₱70.9M | 87% | Medium risk55 | —-0.035 |
| 10 | 18HG0063ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET_PRESERVATION_PROGRAM; REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROAD-TERTIARY ROADS-SIBONGA-DUMANJUG; SECTION 1: K0072+266-K0073+000; SECTION 2: K0075+065-K0077+ | Region VII | Cebu 2nd DEO | Completed | ₱83.6M | 100% | Medium risk54 | —-0.087 |
| 11 | 21HG0066CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), POBLACION, ARGAO - USMAD - CANSUJE - LINUT-OD (VEGETABLE HIGHWAY) LEADING TO COAL MO | Region VII | Cebu 2nd DEO | Completed | ₱61.6M | 100% | Medium risk54 | —-0.092 |
| 12 | 21HI0010CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION/IMPROVEMENT OF SLOPE PROTECTION/FLOOD MITIGATION STRUCTURE, BARANGAY PANALIPAN, CATMON, CEBU | Region VII | Cebu 5th DEO | Completed | ₱71.3M | 100% | Medium risk52 | —-0.075 |
| 13 | 22HO0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF ROAD DIKE ALONG KABALAASNAN RIVER, DAMANJUG, CEBU | Region VII | Cebu 7th DEO | Completed | ₱48.8M | 100% | Medium risk51 | —-0.077 |
| 14 | 22HO0067CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF ROAD DIKE ALONG PAWA RIVER, DAMANJUG, CEBU | Region VII | Cebu 7th DEO | Completed | ₱48.8M | 100% | Medium risk51 | —-0.077 |
| 15 | 22HO0004OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF POBLACION RONDA SEAWALL, RONDA, CEBU | Region VII | Cebu 7th DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.076 |
| 16 | 23HO0049ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF ROAD DIKE ALONG KABALAASNAN RIVER (PHASE II), DUMANJUG, | Region VII | Cebu 7th DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.076 |
| 17 | 18HG0146CONCRETING OF BRGY. BALABAGON-BRGY. BUSAY FMR, BRGY. BALABAGON AND BRGY. BUSAY, MOALBOAL, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱4.7M | 100% | Medium risk50 | —-0.008 |
| 18 | 17HG0077RETROFFITTING / STRENGTHENING OF LUSAPON BRIDGE ( B00440CB), BOLJOON, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱6.5M | 100% | Medium risk50 | —-0.031 |
| 19 | 19HG0046OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURES - CONSTRUCTION OF LAGNASON RIVER FLOOD CONTROL STRUCTURE (UPSTREAM) ALONG NA | Region VII | Cebu 2nd DEO | Completed | ₱18.6M | 100% | Medium risk48 | —-0.071 |
| 20 | 18HG0120ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF POBLACION FLOOD CONTROL, RONDA, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱20.4M | 100% | Medium risk47 | —-0.077 |
| 21 | 19HG0195ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF GUIWANON SEAWALL, ARGAO, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱9.8M | 100% | Medium risk47 | —-0.076 |
| 22 | 20HG0031OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MALBOG, POBLACION, ALEGRIA, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱23.3M | 100% | Medium risk47 | —-0.077 |
| 23 | 22HG0033CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES; CONSTRUCTION OF UPPER BECERRIL-SAN ANTON | Region VII | Cebu 2nd DEO | Completed | ₱38.2M | 100% | Medium risk47 | —-0.093 |
| 24 | 19HG0205CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD CONCRETING OF USMAD-CANSUJE-LINUT-OD LEADING TO COAL MOUNTAIN RANGE, ARGAO, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱37.2M | 100% | Medium risk47 | —-0.095 |
| 25 | 18HG0036ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET_PRESERVATION_PROGRAM; PREVENTIVE MAINTENANCE - TERTIARY ROADS - ARGAO-RONDA ROAD, RONDA, CEBU; SECTION 1: K0086+005-K0088+000 | Region VII | Cebu 2nd DEO | Completed | ₱29.5M | 100% | Medium risk47 | —-0.096 |