Opening the dossier…
Opening the dossier…
Contractor dossier
4 projects on file, including joint ventures this contractor is part of.
Total projects
4
Total budget
₱306.4M
Average progress
99.2%
Completion rate
75.0%
Average risk score
65.3
High risk on average, out of 100
Flagged as unusual
1
25.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 4 | ₱306.4M | 65.3 | 1 | 99.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 3 | ₱237.1M | 55.6 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱69.3M | 94.6 | 1 | 97.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CK0112STRENGTHENING OF RIGHT SIDE EXISTING BANK OF SAN PEDRO SECTION ALONG PARUA RIVER, UPSTREAM OF SCTEX BRIDGE, BAMBAN, TARLAC (PART A) | Region III | Tarlac 2nd DEO | On-Going | ₱69.3M | 97% | High risk95 | Flagged0.002 |
| 24CC0344CONSTRUCTION OF RIVER PROTECTION STRUCTURE AND REHABILITATION OF WATERWAY ALONG ANGAT RIVER, K000+551 TO K000+701, BARANGAY BONGA MENOR, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | High risk73 | —-0.063 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CK0112STRENGTHENING OF RIGHT SIDE EXISTING BANK OF SAN PEDRO SECTION ALONG PARUA RIVER, UPSTREAM OF SCTEX BRIDGE, BAMBAN, TARLAC (PART A) | Region III | Tarlac 2nd DEO | On-Going | ₱69.3M | 97% | High risk95 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25CK0112STRENGTHENING OF RIGHT SIDE EXISTING BANK OF SAN PEDRO SECTION ALONG PARUA RIVER, UPSTREAM OF SCTEX BRIDGE, BAMBAN, TARLAC (PART A) | Region III | Tarlac 2nd DEO | On-Going | ₱69.3M | 97% | High risk95 | Flagged0.002 |
| 2 | 24CC0344CONSTRUCTION OF RIVER PROTECTION STRUCTURE AND REHABILITATION OF WATERWAY ALONG ANGAT RIVER, K000+551 TO K000+701, BARANGAY BONGA MENOR, BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱49M | 100% | High risk73 | —-0.063 |
| 3 | 25CI0006FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENENCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAPANGBALEN RIVER, PHASE 2, BARANGAY ATLU BOLA TO BARANGAY MANGALIT, MABALACAT CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱115.8M | 100% | Medium risk58 | —-0.075 |
| 4 | 23CI0086SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRA/FACILITIES, CONSTRUCTION OF DIKE WITH SLOPE PROTECTION AND GROUNDSILL ALONG SAPANG BALEN CREEK (LEFT SIDE), MABALACAT CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱72.3M | 100% | Medium risk35 | —-0.086 |