Contractor dossier
401 projects on file, including joint ventures this contractor is part of.
Total projects
401
Total budget
₱24B
Average progress
93.2%
Completion rate
77.3%
Average risk score
54.8
Medium risk on average, out of 100
Flagged as unusual
20
5.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 318 | ₱19.3B | 54.8 | 12 | 93.6% |
| Negros Island Region | 51 | ₱1.7B | 50.9 | 4 | 89.5% |
| Region VIII | 14 | ₱1.2B | 59.9 | 1 | 94.1% |
| Region IX | 9 | ₱848.5M | 67.2 | 2 | 91.3% |
| Region XIII | 3 | ₱312.7M | 48.3 | 0 | 100.0% |
| Region XII | 2 | ₱168.1M | 67.0 | 1 | 100.0% |
| Region X | 2 | ₱151M | 53.6 | 0 | 100.0% |
| Region V | 1 | ₱133.5M | 65.8 | 0 | 100.0% |
| Region VI | 1 | ₱195.5M | 65.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 210 | ₱10.8B | 50.8 | 0 | 94.3% |
| Flood Control and Drainage | 99 | ₱7.7B | 57.4 | 6 | 91.5% |
| Bridges | 43 | ₱2.3B | 52.0 | 2 | 92.5% |
| Buildings and Facilities | 17 | ₱573.6M | 48.5 | 0 | 98.5% |
| OTHER | 16 | ₱1.3B | 71.9 | 3 | 97.5% |
| GAA 2025 SSP | 7 | ₱360.8M | 92.5 | 5 | 77.7% |
| GAA 2025 OO-1 | 5 | ₱277.7M | 94.1 | 4 | 70.3% |
| GAA 2025 OO-2 | 2 | ₱243.4M | 93.8 | 0 | 92.3% |
| Bridges, Roads | 2 | ₱449.3M | 58.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HO0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG VIVE RIVER, PHASE 3, RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱96.2M | 95% | High risk96 | Flagged0.018 |
| 25H00051CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PINOCAWAN RIVER, VALLEHERMOSO, NEGROS ORIENTAL | Negros Island Region | Negros Island Region | On-Going | ₱149.4M | 78% | High risk96 | Flagged0.028 |
| 25HG0092IMPROVEMENT OF ROAD LEADING TO LAPYAHAN SA SAN REMIGIO, BRGY. POBLACION, SAN REMIGIO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱48M | 82% | High risk95 | Flagged0.015 |
| 25HN0078OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - CONSOLACION-TAYUD-LILOAN RD - K0014 + 400 - K0016 + 350, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱57.7M | 37% | High risk95 | Flagged0.016 |
| 25MB0001PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT DIGOS-BUAYAN AIRPORT RD - K1650 + 417 - K1652 + 475 | Region XII | South Cotabato 1st DEO | On-Going | ₱59.9M | 100% | High risk95 | Flagged0.005 |
| 25HN0165SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, HUMAY-HUMAY-CERES ROAD, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 27% | High risk95 | Flagged0.029 |
| 25HN0168SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE FACILITIES, PHASE 2, BARANGAY CANJULAO, LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 62% | High risk95 | Flagged0.021 |
| 25HG0096PREVENTIVE MAINTENANCE ALONG BOGO-CURVA-MEDELLIN-DAANBANTAYAN-MAYA ROAD, K0107+296 - K0108+268, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱72.9M | 96% | High risk95 | Flagged0.001 |
| 25HH0140OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-CEBU BALAMBAN TRANSCENTRAL HIGHWAY-K0018+420-K0018+580, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱48M | 94% | High risk94 | —-0.001 |
| 25HO0023ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG MATUTINAO RIVER (DOWNSTREAM), BADIAN | Region VII | Cebu 7th DEO | On-Going | ₱100.8M | 91% | High risk94 | —-0.009 |
| 25HF0015ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTU | Region VII | Cebu 3rd DEO | On-Going | ₱142.6M | 93% | High risk94 | —-0.001 |
| 25HN0086OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - OPON-AIRPORT RD - (S00003LP) CHAINAGE 0 - CHAINAGE 654, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱39.2M | 25% | High risk92 | Flagged0.018 |
| 24H00175CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF LEVEL III WATER SYSTEM, MADRIDEJOS, CEBU | Region VII | Region VII | On-Going | ₱197.7M | 60% | High risk91 | Flagged0.080 |
| 25HN0136SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, BARANGAY POBLACION ORIENTAL, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.8M | 100% | High risk86 | —-0.022 |
| 25HN0135SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, BARANGAY LAMAC, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.8M | 100% | High risk86 | —-0.023 |
| 18I00046REPLACEMENT OF PERMANENT WEAK BRIDGES, DAGUITAN BRIDGE (B00067LT) ALONG DAANG MAHARLIKA, DULAG, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱182.8M | 100% | High risk83 | Flagged0.010 |
| 23HO0277CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG BARANGAY VIVE RIVER FLOOD CONTROL, RONDA, | Region VII | Cebu 7th DEO | On-Going | ₱71.6M | 0% | High risk82 | Flagged0.076 |
| 24HM0104CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE I AT LIKI RIVER B | Negros Island Region | Siquijor DEO | On-Going | ₱96.4M | 56% | High risk81 | Flagged0.052 |
| 18I00026WIDENING OF PERMANENT BRIDGES - NALIWATAN BRIDGE (B00526LT) ALONG PALO-CARIGARA-ORMOC ROAD, KO947+408.00, TUNGA, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱52M | 100% | High risk81 | —-0.018 |
| 18I00027WIDENING OF PERMANENT BRIDGES - NAUGUISAN BRIDGE (B00495LT) ALONG PALO - CARIGARA - ORMOC ROAD, KO960+370, CARIGARA, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱53.3M | 100% | High risk81 | —-0.014 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24H00175CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF LEVEL III WATER SYSTEM, MADRIDEJOS, CEBU | Region VII | Region VII | On-Going | ₱197.7M | 60% | High risk91 | Flagged0.080 |
| 23HO0277CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG BARANGAY VIVE RIVER FLOOD CONTROL, RONDA, | Region VII | Cebu 7th DEO | On-Going | ₱71.6M | 0% | High risk82 | Flagged0.076 |
| 24HM0104CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE I AT LIKI RIVER B | Negros Island Region | Siquijor DEO | On-Going | ₱96.4M | 56% | High risk81 | Flagged0.052 |
| 23HM0134CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM) AT TAG-IBO, SAN JUAN, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱38.5M | 100% | High risk69 | Flagged0.040 |
| 23HM0131CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM) AT TAG-IBO, SAN JUAN, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱38.4M | 100% | High risk69 | Flagged0.036 |
| 25HN0165SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, HUMAY-HUMAY-CERES ROAD, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 27% | High risk95 | Flagged0.029 |
| 25H00051CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PINOCAWAN RIVER, VALLEHERMOSO, NEGROS ORIENTAL | Negros Island Region | Negros Island Region | On-Going | ₱149.4M | 78% | High risk96 | Flagged0.028 |
| 18J00010CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - FLOOD CONTROL FOR URBAN CORE AND CENTRAL DISTRICT OF ZAMBOANGA CITY TO INCLUDE PUMPING STATION AND RROW, ZAMBOANGA CITY (PACKAGE I) | Region IX | Region IX | On-Going | ₱141.2M | 61% | High risk76 | Flagged0.027 |
| 25HN0168SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE FACILITIES, PHASE 2, BARANGAY CANJULAO, LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 62% | High risk95 | Flagged0.021 |
| 25HO0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG VIVE RIVER, PHASE 3, RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱96.2M | 95% | High risk96 | Flagged0.018 |
| 25HN0086OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - OPON-AIRPORT RD - (S00003LP) CHAINAGE 0 - CHAINAGE 654, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱39.2M | 25% | High risk92 | Flagged0.018 |
| 25HN0078OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - CONSOLACION-TAYUD-LILOAN RD - K0014 + 400 - K0016 + 350, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱57.7M | 37% | High risk95 | Flagged0.016 |
| 25HG0092IMPROVEMENT OF ROAD LEADING TO LAPYAHAN SA SAN REMIGIO, BRGY. POBLACION, SAN REMIGIO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱48M | 82% | High risk95 | Flagged0.015 |
| 24HN0081CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BRIDGE, BRGY. SABANG, OLANGO ISLAND TO PANGAN-AN ISLAND, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱61.2M | 0% | Medium risk55 | Flagged0.014 |
| 22J00078CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING PUMPING STATION (PACKAGE 1 & 2) | Region IX | Region IX | On-Going | ₱113.2M | 60% | High risk75 | Flagged0.011 |
| 18I00046REPLACEMENT OF PERMANENT WEAK BRIDGES, DAGUITAN BRIDGE (B00067LT) ALONG DAANG MAHARLIKA, DULAG, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱182.8M | 100% | High risk83 | Flagged0.010 |
| 24HN0033CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS./ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE SYSTEM AT S. OSMENA ST., LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱57.9M | 100% | High risk74 | Flagged0.008 |
| 25MB0001PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT DIGOS-BUAYAN AIRPORT RD - K1650 + 417 - K1652 + 475 | Region XII | South Cotabato 1st DEO | On-Going | ₱59.9M | 100% | High risk95 | Flagged0.005 |
| 25HH0129CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF CONCRETE BRIDGE, BARANGAY POBL | Region VII | Cebu City DEO | On-Going | ₱38.4M | 0% | Medium risk48 | Flagged0.002 |
| 25HG0096PREVENTIVE MAINTENANCE ALONG BOGO-CURVA-MEDELLIN-DAANBANTAYAN-MAYA ROAD, K0107+296 - K0108+268, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱72.9M | 96% | High risk95 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 251 | 24HH0102CONSTRUCTION OF 4-STOREY 8-CLASSROOM SCHOOL BUILDING IN QUIOT ELEMENTARY SCHOOL, BARANGAY QUIOT PARDO, CEBU CITY, PROVINCE OF CEBU | Region VII | Cebu City DEO | On-Going | ₱39.8M | 100% | Medium risk48 | —-0.004 |
| 252 | 21HF0041REPLACEMENT OF CARIDAD BR. (B00477CB) ALONG TOLEDO-TABUELAN-SN REMIGIO RD | Region VII | Cebu 3rd DEO | Completed | ₱44.1M | 100% | Medium risk48 | —-0.050 |
| 253 | 23HM0005OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0050+000 - K0051+000 | Negros Island Region | Siquijor DEO | On-Going | ₱37.5M | 78% | Medium risk48 | —-0.042 |
| 254 | 19HF0061CONSTRUCTION OF ALEGRIA BRIDGE (CONNECTING BRGY. ALEGRIA TO BRGY. MARMOL) LEADING TO KABANGKALAN COFFEE PLANTATION, BRGY. ALEGRIA, TUBURAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱29M | 100% | Medium risk48 | —-0.058 |
| 255 | 25HH0129CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF CONCRETE BRIDGE, BARANGAY POBL | Region VII | Cebu City DEO | On-Going | ₱38.4M | 0% | Medium risk48 | Flagged0.002 |
| 256 | 19HH0104OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REHABILITATION / MAJOR REPAIR OF PERMANENT BRIDGES, VIADUCT BRIDGE (B00081CB) ALONG CEBU SOUTH COASTAL RD., CEBU CITY | Region VII | Cebu City DEO | Completed | ₱37M | 100% | Medium risk48 | —-0.058 |
| 257 | 21HD0033WIDENING OF PERMANENT BRIDGES, KINAWAHAN BRIDGE (B00020CB) ALONG ANTONIO Y DE PIO HIGHWAY, SAN REMEGIO, CEBU | Region VII | Cebu 4th DEO | Completed | ₱39.2M | 100% | Medium risk48 | —-0.056 |
| 258 | 21HD0029WIDENING OF PERMANENT BRIDGES, LAMBUSAN PARALLEL BR. ALONG ANTONIO Y DE PIO HIGHWAY, SAN REMIGIO, CEBU | Region VII | Cebu 4th DEO | Completed | ₱39.2M | 100% | Medium risk48 | —-0.056 |
| 259 | 16HD0100CONST AND MAINT OF BRIDGES-WIDENING OF PERMANENT BRIDGE, SOSO BRIDGE (B00005CB), AYDPH, TABUELAN | Region VII | Cebu 4th DEO | Completed | ₱21.8M | 100% | Medium risk48 | —-0.032 |
| 260 | 21HM0059LOCAL PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, REHABILITATION OF GABAYAN-TALAYONG-CANGMUNAG ROAD, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱46.4M | 100% | Medium risk48 | —-0.087 |
| 261 | 21HM0057CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, GABAYAN-TALAYONG LOWER MARINE PROTECTIVE AREAS DIVING SITE AND BEACH RESORTS, BARANGAY GABAYAN, LAZI, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱37.4M | 100% | Medium risk48 | —-0.088 |
| 262 | 18HF0048RETROFITTING/STRENGTHENING OF SANGI BRIDGE 3 (B00519CB) ALONGTOLEDO-TABUELAN-SAN REMEGIO ROAD (L-60.30L.M.) | Region VII | Cebu 3rd DEO | Completed | ₱19.1M | 100% | Medium risk48 | —-0.058 |
| 263 | 25HG0065SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF J.D. VILLACARLOS ST., POBLACION, MADRIDEJOS, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱28.8M | 21% | Medium risk48 | —-0.037 |
| 264 | 19HF0086REHABILITATION/MAJOR REPAIR OF ARPILI BR. (B00540CB) ALONG TOLEDO-TABUELAN-SN REMEGIO ROAD | Region VII | Cebu 3rd DEO | Completed | ₱14.2M | 100% | Medium risk48 | —-0.060 |
| 265 | 25HO0101ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DRAINAGE SYSTEM ALONG BRGY. MATUTINAO, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱4.8M | 48% | Medium risk48 | —-0.027 |
| 266 | 18HF0062CONSTRUCTION OF MANGOTO BR. ALONG TOLEDO-PINAMUNGAJAN-ALOGUINSAN-MANTALONGON RD (PHASE II) | Region VII | Cebu 3rd DEO | Completed | ₱9.8M | 100% | Medium risk48 | —-0.059 |
| 267 | 22HM0004OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0025+120 - K0025+248 | Negros Island Region | Siquijor DEO | On-Going | ₱27.8M | 64% | Medium risk48 | —-0.027 |
| 268 | 19HI0031CONSTRUCTION OF PARALLEL BRIDGE AT SUBA BRIDGE II ALONG CONSOLACION - TAYUD - LILOAN ROAD, LILOAN, CEBU | Region VII | Cebu 5th DEO | Completed | ₱32.3M | 100% | Medium risk48 | —-0.055 |
| 269 | 25HO0098ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES, LEGASPI BR. (B00462CB) ALONG SANTANDER-BARILI-TOLEDO RD | Region VII | Cebu 7th DEO | On-Going | ₱10.7M | 70% | Medium risk48 | —-0.017 |
| 270 | 18HF0049RETROFITTING/STRENGTHENING OF DUMLOG BRIDGE 2 (B00513CB) ALONG TOLEDO-TABUELAN-SAN REMEGIO ROAD | Region VII | Cebu 3rd DEO | Completed | ₱5.1M | 100% | Medium risk48 | —-0.060 |
| 271 | 20HD0030WIDENING OF PERMANENT BIRDGES TACUP BR. (B00016CB) ALONG ANTONIO Y DE PIO H-WAY, SAN REMEGIO, CEBU | Region VII | Cebu 4th DEO | Completed | ₱27.4M | 100% | Medium risk48 | —-0.056 |
| 272 | 20HN0029OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES -PILIPOG BR.1 (B00001LP) ALONG MACTAN CIRCUMFERENTIAL RD, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱18.6M | 100% | Medium risk48 | —-0.059 |
| 273 | 23HM0001OO1: ENSURE SAFE AND RELIABLE NATIONAL ROOAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0005+000 - K0006+0001 | Negros Island Region | Siquijor DEO | On-Going | ₱26.3M | 72% | Medium risk48 | —-0.040 |
| 274 | 24HM0002OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0066+000 - K0066+648 | Negros Island Region | Siquijor DEO | On-Going | ₱22.9M | 63% | Medium risk48 | —-0.047 |
| 275 | 21HM0024OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PREVENTIVE MAINTENANCE SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0073 + 182 K0074 + 174 | Negros Island Region | Siquijor DEO | Completed | ₱20.8M | 100% | Medium risk48 | —-0.090 |