Opening the dossier…
Opening the dossier…
Contractor dossier
401 projects on file, including joint ventures this contractor is part of.
Total projects
401
Total budget
₱24B
Average progress
93.2%
Completion rate
77.3%
Average risk score
54.8
Medium risk on average, out of 100
Flagged as unusual
20
5.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 318 | ₱19.3B | 54.8 | 12 | 93.6% |
| Negros Island Region | 51 | ₱1.7B | 50.9 | 4 | 89.5% |
| Region VIII | 14 | ₱1.2B | 59.9 | 1 | 94.1% |
| Region IX | 9 | ₱848.5M | 67.2 | 2 | 91.3% |
| Region XIII | 3 | ₱312.7M | 48.3 | 0 | 100.0% |
| Region XII | 2 | ₱168.1M | 67.0 | 1 | 100.0% |
| Region X | 2 | ₱151M | 53.6 | 0 | 100.0% |
| Region V | 1 | ₱133.5M | 65.8 | 0 | 100.0% |
| Region VI | 1 | ₱195.5M | 65.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 210 | ₱10.8B | 50.8 | 0 | 94.3% |
| Flood Control and Drainage | 99 | ₱7.7B | 57.4 | 6 | 91.5% |
| Bridges | 43 | ₱2.3B | 52.0 | 2 | 92.5% |
| Buildings and Facilities | 17 | ₱573.6M | 48.5 | 0 | 98.5% |
| OTHER | 16 | ₱1.3B | 71.9 | 3 | 97.5% |
| GAA 2025 SSP | 7 | ₱360.8M | 92.5 | 5 | 77.7% |
| GAA 2025 OO-1 | 5 | ₱277.7M | 94.1 | 4 | 70.3% |
| GAA 2025 OO-2 | 2 | ₱243.4M | 93.8 | 0 | 92.3% |
| Bridges, Roads | 2 | ₱449.3M | 58.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HO0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG VIVE RIVER, PHASE 3, RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱96.2M | 95% | High risk96 | Flagged0.018 |
| 25H00051CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PINOCAWAN RIVER, VALLEHERMOSO, NEGROS ORIENTAL | Negros Island Region | Negros Island Region | On-Going | ₱149.4M | 78% | High risk96 | Flagged0.028 |
| 25HG0092IMPROVEMENT OF ROAD LEADING TO LAPYAHAN SA SAN REMIGIO, BRGY. POBLACION, SAN REMIGIO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱48M | 82% | High risk95 | Flagged0.015 |
| 25HN0078OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - CONSOLACION-TAYUD-LILOAN RD - K0014 + 400 - K0016 + 350, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱57.7M | 37% | High risk95 | Flagged0.016 |
| 25MB0001PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT DIGOS-BUAYAN AIRPORT RD - K1650 + 417 - K1652 + 475 | Region XII | South Cotabato 1st DEO | On-Going | ₱59.9M | 100% | High risk95 | Flagged0.005 |
| 25HN0165SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, HUMAY-HUMAY-CERES ROAD, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 27% | High risk95 | Flagged0.029 |
| 25HN0168SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE FACILITIES, PHASE 2, BARANGAY CANJULAO, LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 62% | High risk95 | Flagged0.021 |
| 25HG0096PREVENTIVE MAINTENANCE ALONG BOGO-CURVA-MEDELLIN-DAANBANTAYAN-MAYA ROAD, K0107+296 - K0108+268, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱72.9M | 96% | High risk95 | Flagged0.001 |
| 25HH0140OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-CEBU BALAMBAN TRANSCENTRAL HIGHWAY-K0018+420-K0018+580, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱48M | 94% | High risk94 | —-0.001 |
| 25HO0023ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG MATUTINAO RIVER (DOWNSTREAM), BADIAN | Region VII | Cebu 7th DEO | On-Going | ₱100.8M | 91% | High risk94 | —-0.009 |
| 25HF0015ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTU | Region VII | Cebu 3rd DEO | On-Going | ₱142.6M | 93% | High risk94 | —-0.001 |
| 25HN0086OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - OPON-AIRPORT RD - (S00003LP) CHAINAGE 0 - CHAINAGE 654, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱39.2M | 25% | High risk92 | Flagged0.018 |
| 24H00175CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF LEVEL III WATER SYSTEM, MADRIDEJOS, CEBU | Region VII | Region VII | On-Going | ₱197.7M | 60% | High risk91 | Flagged0.080 |
| 25HN0136SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, BARANGAY POBLACION ORIENTAL, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.8M | 100% | High risk86 | —-0.022 |
| 25HN0135SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, BARANGAY LAMAC, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.8M | 100% | High risk86 | —-0.023 |
| 18I00046REPLACEMENT OF PERMANENT WEAK BRIDGES, DAGUITAN BRIDGE (B00067LT) ALONG DAANG MAHARLIKA, DULAG, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱182.8M | 100% | High risk83 | Flagged0.010 |
| 23HO0277CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG BARANGAY VIVE RIVER FLOOD CONTROL, RONDA, | Region VII | Cebu 7th DEO | On-Going | ₱71.6M | 0% | High risk82 | Flagged0.076 |
| 24HM0104CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE I AT LIKI RIVER B | Negros Island Region | Siquijor DEO | On-Going | ₱96.4M | 56% | High risk81 | Flagged0.052 |
| 18I00026WIDENING OF PERMANENT BRIDGES - NALIWATAN BRIDGE (B00526LT) ALONG PALO-CARIGARA-ORMOC ROAD, KO947+408.00, TUNGA, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱52M | 100% | High risk81 | —-0.018 |
| 18I00027WIDENING OF PERMANENT BRIDGES - NAUGUISAN BRIDGE (B00495LT) ALONG PALO - CARIGARA - ORMOC ROAD, KO960+370, CARIGARA, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱53.3M | 100% | High risk81 | —-0.014 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24H00175CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF LEVEL III WATER SYSTEM, MADRIDEJOS, CEBU | Region VII | Region VII | On-Going | ₱197.7M | 60% | High risk91 | Flagged0.080 |
| 23HO0277CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG BARANGAY VIVE RIVER FLOOD CONTROL, RONDA, | Region VII | Cebu 7th DEO | On-Going | ₱71.6M | 0% | High risk82 | Flagged0.076 |
| 24HM0104CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF FLOOD CONTROL STRUCTURE PHASE I AT LIKI RIVER B | Negros Island Region | Siquijor DEO | On-Going | ₱96.4M | 56% | High risk81 | Flagged0.052 |
| 23HM0134CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM) AT TAG-IBO, SAN JUAN, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱38.5M | 100% | High risk69 | Flagged0.040 |
| 23HM0131CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM) AT TAG-IBO, SAN JUAN, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱38.4M | 100% | High risk69 | Flagged0.036 |
| 25HN0165SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, HUMAY-HUMAY-CERES ROAD, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 27% | High risk95 | Flagged0.029 |
| 25H00051CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PINOCAWAN RIVER, VALLEHERMOSO, NEGROS ORIENTAL | Negros Island Region | Negros Island Region | On-Going | ₱149.4M | 78% | High risk96 | Flagged0.028 |
| 18J00010CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - FLOOD CONTROL FOR URBAN CORE AND CENTRAL DISTRICT OF ZAMBOANGA CITY TO INCLUDE PUMPING STATION AND RROW, ZAMBOANGA CITY (PACKAGE I) | Region IX | Region IX | On-Going | ₱141.2M | 61% | High risk76 | Flagged0.027 |
| 25HN0168SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD WITH DRAINAGE FACILITIES, PHASE 2, BARANGAY CANJULAO, LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱28.8M | 62% | High risk95 | Flagged0.021 |
| 25HO0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG VIVE RIVER, PHASE 3, RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱96.2M | 95% | High risk96 | Flagged0.018 |
| 25HN0086OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - OPON-AIRPORT RD - (S00003LP) CHAINAGE 0 - CHAINAGE 654, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱39.2M | 25% | High risk92 | Flagged0.018 |
| 25HN0078OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - CONSOLACION-TAYUD-LILOAN RD - K0014 + 400 - K0016 + 350, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱57.7M | 37% | High risk95 | Flagged0.016 |
| 25HG0092IMPROVEMENT OF ROAD LEADING TO LAPYAHAN SA SAN REMIGIO, BRGY. POBLACION, SAN REMIGIO, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱48M | 82% | High risk95 | Flagged0.015 |
| 24HN0081CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BRIDGE, BRGY. SABANG, OLANGO ISLAND TO PANGAN-AN ISLAND, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱61.2M | 0% | Medium risk55 | Flagged0.014 |
| 22J00078CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE INCLUDING PUMPING STATION (PACKAGE 1 & 2) | Region IX | Region IX | On-Going | ₱113.2M | 60% | High risk75 | Flagged0.011 |
| 18I00046REPLACEMENT OF PERMANENT WEAK BRIDGES, DAGUITAN BRIDGE (B00067LT) ALONG DAANG MAHARLIKA, DULAG, LEYTE, LEYTE 2ND DISTRICT | Region VIII | Region VIII | Completed | ₱182.8M | 100% | High risk83 | Flagged0.010 |
| 24HN0033CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS./ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE SYSTEM AT S. OSMENA ST., LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱57.9M | 100% | High risk74 | Flagged0.008 |
| 25MB0001PREVENTIVE MAINTENANCE - SECONDARY ROADS - JCT DIGOS-BUAYAN AIRPORT RD - K1650 + 417 - K1652 + 475 | Region XII | South Cotabato 1st DEO | On-Going | ₱59.9M | 100% | High risk95 | Flagged0.005 |
| 25HH0129CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF CONCRETE BRIDGE, BARANGAY POBL | Region VII | Cebu City DEO | On-Going | ₱38.4M | 0% | Medium risk48 | Flagged0.002 |
| 25HG0096PREVENTIVE MAINTENANCE ALONG BOGO-CURVA-MEDELLIN-DAANBANTAYAN-MAYA ROAD, K0107+296 - K0108+268, MEDELLIN, CEBU | Region VII | Cebu 4th DEO | On-Going | ₱72.9M | 96% | High risk95 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 301 | 18HF0093CONSTRUCTION/IMPROVEMENT OF BRGY. BAGO STA. RITA ROAD LEADING TO BUSWANG LAKE, BRGY. BAGO, ASTURIAS, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱40.6M | 100% | Medium risk47 | —-0.095 |
| 302 | 20HF0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF BRGY. ROAD FROM SITIO MANGA, SUNOG TO BRGY. MATUN-OG FOR THE ABACA INDUSTRY, BALAMBAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱44.1M | 100% | Medium risk47 | —-0.095 |
| 303 | 19HH0141OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM, REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, CEBU-BALAMBAN TRANSCENTRAL HIGHWAY, (S00031CB) K0019+700-K0019+730, K0025 | Region VII | Cebu City DEO | Completed | ₱35.2M | 100% | Medium risk47 | —-0.096 |
| 304 | 18HH0030CONCRETING OF ROADS WITH SLOPE PROTECTION STRUCTURE AT SUDLON II, CEBU CITY, CHAINAGE 000 - CHAINAGE 1500, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.096 |
| 305 | 20HH0017OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - N. BACALSO AVE. (CEBU SOUTH RD) - K0007+(-251) - K0007+000, K0008+000 - K0008+390, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱29.1M | 100% | Medium risk47 | —-0.098 |
| 306 | 21HH0017OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-CEBU-BALAMBAN TRANSCENTRAL HIGHWAY, KM 12+159 - KM 12+253, KM 12+850 | Region VII | Cebu City DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.095 |
| 307 | 18HH0040REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS, CEBU-BALAMBAN TRANSCENTRAL HIGHWAY - K0008+200 - K0008+210, K0012+685 - K0012+723, K0013+900 - K0013+920, K0017+000 - K0017+042, K0017+160 - K0017+183, CEBU | Region VII | Cebu City DEO | Completed | ₱34.3M | 100% | Medium risk47 | —-0.096 |
| 308 | 23HH0087OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-SECONDARY ROADS-CEBU BALAMBAN TRANSCENTRAL HIGHWAY- K0023+499-K0023+561, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱32.3M | 100% | Medium risk47 | —-0.096 |
| 309 | 19HM0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, PANGI-CANDANAY SUR ROAD CONNECTING TO MANUFACTURING SITE AND NATIONAL HIGHWAY IN SUPPORT OF PEANUT PROCESSING INDUSTRY, CAND | Negros Island Region | Siquijor DEO | Completed | ₱8.7M | 100% | Medium risk47 | —-0.089 |
| 310 | 19HM0029CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, LAMBOJON ROAD CONNECTING TO MANUFACTURING SITE AND SIQUIJOR PROVINCIAL ROAD IN SUPPORT OF FURNITURE INDUSTRIES, LAMBOJON, SI | Negros Island Region | Siquijor DEO | Completed | ₱8.6M | 100% | Medium risk47 | —-0.089 |
| 311 | 25HN0076OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - OUANO AVENUE - K0008+(-842) - K0008+(-236), MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱41.4M | 100% | Medium risk47 | —-0.096 |
| 312 | 18HH0039FLOOD CONTROL AND MITIGATION STRUCTURE ALONG MAOMAOAN RIVER, BRGY. BONBON, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱37.2M | 100% | Medium risk47 | —-0.077 |
| 313 | 21HI0135CONSTRUCTION OF CONCRETE ROAD - BRGY. CABALAWAN - BRGY. NAHUS-AN ROADS IN SUPPORT TO CABALAWAN SPRING AND ECO TOURISM SITE IN BRGY. CABALAWAN AND BRGY. NAHUS-AN, SOGOD, CEBU | Region VII | Cebu 5th DEO | Completed | ₱42.1M | 100% | Medium risk47 | —-0.095 |
| 314 | 23HI0041ROAD WIDENING ALONG SOGOD-TABUELAN RD - K0119+(-845) - K0119+(-015), CHAINAGE 0 - CHAINAGE 84 | Region VII | Cebu 5th DEO | Completed | ₱31.8M | 100% | Medium risk47 | —-0.095 |
| 315 | 19HF0038CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT COMBADO RIVER ALONG TOLEDO-TABUELAN-SAN REMEGIO RD., BRGY. CANTUOD, BALAMBAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱46.3M | 100% | Medium risk47 | —-0.078 |
| 316 | 18HF0117CONSTRUCTION OF WEIR DAM AT COMBADO BRIDGE ALONG TOLEDO-TABUELAN-SAN REMEGIO RD., BRGY. CANTUOD, BALAMBAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱37.2M | 100% | Medium risk47 | —-0.078 |
| 317 | 19HF0025CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT ABUCAYAN RIVER, BALAMBAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.079 |
| 318 | 19HD0005REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE & LANDSLIDE, CEBU NORTH HAGNAYA WHARF ROAD, K0089+900-K0090+300, BOGO CITY, CEBU | Region VII | Cebu 4th DEO | Completed | ₱37.8M | 100% | Medium risk47 | —-0.095 |
| 319 | 18HM0046CONSTRUCTION/IMPROVEMENT OF SANDUGAN BARANGAY ROAD LEADING TO VARIOUS BEACH RESORTS, SIQUIJOR | Negros Island Region | Siquijor DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.090 |
| 320 | 23HD0052CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS, CONSTRUCTION OF DRAINAGE OUTFALL AT ANTONIO Y DE PIO HIGHWAY, BARANGAY TABUNOK, STA. 000 + 000 - STA. 000 + 300, TABUELAN, CEBU | Region VII | Cebu 4th DEO | Completed | ₱5.6M | 100% | Medium risk47 | —-0.077 |
| 321 | 18HD0026OFF-CARRIAGE IMPROVEMENT, BOGO-POLAMBATO WHARF ROAD, K0102+000 - K0103+756, BOGO CITY, CEBU | Region VII | Cebu 4th DEO | Completed | ₱37M | 100% | Medium risk47 | —-0.095 |
| 322 | 23HF0021REHABILITATION OF FLOOD MITIGATION STRUCTURE AT COMBADO RIVER, BARANGAY CANTUOD, BALAMBAN, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱19.4M | 100% | Medium risk47 | —-0.078 |
| 323 | 18ID0028RECONSTRUCTION OF FLOOD CONTROL STRUCTURE PROJECT ALONG MALIRONG RIVER,BRGY. TINGIB AND BRGY. ARABUNOG,PASTRANA,LEYTE | Region VIII | Leyte 2nd DEO | Completed | ₱26.9M | 100% | Medium risk47 | —-0.060 |
| 324 | 21HG0185LOCAL ROADS AND BRIDGES- LOCAL ROADS, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION OF LAMBUG-ZARAGOSA CAUSEWAY AND ROAD AT BRGY. LAMBUG AND ZARAGOSA, BADIAN, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.095 |
| 325 | 18HG0050ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET_PRESERVATION_PROGRAM -REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROAD ALONG SECONDARY ROAD, SANTANDER-BARILI-TOLEDO ROAD; SECTION 1: K0194+148- K0195+144 | Region VII | Cebu 2nd DEO | Completed | ₱24.5M | 100% | Medium risk47 | —-0.096 |